Overview
Chourasia Sapphire
Overview
Chourasia Sapphire
Overview
Chourasia Sapphire
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 21 Apr 2017 |
|---|
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 13 Jul 2021 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Transfer fee | ₹200 per sq ft |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹26.00 Cr |
|---|
Loan & collateral
| Records searched to | 21 Apr 2017 | Review |
|---|---|---|
| Escrow bank | Axis Bank · OLD MADRAS ROAD |
Data room
36 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Chourasia Sapphire is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Page 1
Page 1 of 3 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 3 pages, English.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 2,135 sq m |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| 2g Tula | about 3.5 km, to a locality centre | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km, to a locality centre | Locked |
|---|
| Garuda Grand | about 4 km, to a locality centre | Locked |
|---|
| Legacy Saviero | about 4.5 km, to a locality centre | Locked |
|---|
| Vaswani Starlight | about 6 km, to a locality centre | Locked |
|---|
| Century Regalia (Project 2) | about 6 km, to a locality centre | Locked |
|---|
| Coevolve Misty Shores | about 6 km, to a locality centre | Locked |
|---|
| Ranka Iris | about 6.5 km, to a locality centre | Locked |
|---|
| Axis Ekatva | about 6.5 km, to a locality centre | Locked |
|---|
| Vkk Grand | about 6.5 km, to a locality centre | Locked |
|---|
| Godrej Splendour | about 6.5 km, to a locality centre | Locked |
|---|
| Adarsh Parkland | about 6.5 km, to a locality centre | Locked |
|---|
| Chourasia Sapphire This project | This project is the point the others are measured from | 13 Jul 2021 | – | Not verified yet |
|---|---|---|---|---|
| 2g Tula | about 3.5 km, to a locality centre | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km, to a locality centre | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Garuda Grand | about 4 km, to a locality centre | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Legacy Saviero | about 4.5 km, to a locality centre | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vaswani Starlight | about 6 km, to a locality centre | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Century Regalia (Project 2) | about 6 km, to a locality centre | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, an unnamed water body |
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre | |
| Quarry | about 0.5 km from the locality centre | |
| Crematorium | about 1.5 km from the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 0.5 km from the locality centre |
| RERA completion date | 13 Jul 2021 | Red flag |
|---|---|---|
| Work began, as filed | 10 Jul 2017 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | Axis Bank · OLD MADRAS ROAD |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, secondary drain |
|---|