Photo: Ashok PatelTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 6 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 6 pages.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹2.15 Cr 17.9%Development · ₹9.85 Cr 82.1%
Loan & collateral
| Escrow bank | HDFC · Richmond Road |
|---|
Data room
101 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Good residential layout in Devanahalli . Attached to brigade orchids with Villa plots . Well maintained plots from Classic and Total green homes .
Not good property. Big storm drain and phone tower.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
All 308 projects in Devanahalli → · Total Green Homes LLP's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Classic Canaan in the interactive atlas
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 33,250 sq m | |
| Land area filed with K-RERA | 12,140 sq m | |
| Village, hobli and taluk on the KGIS map | Rayasandra, Kasaba hobli, Devanahalli taluk | |
| Mutation entry | None open on 5 of 5 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Whole survey numbers on the KGIS map | 33,250 sq m (the project holds a share) | |
|---|---|---|
| Land area of this registration | 12,140 sq m | |
| Title deed | Executed 11 Aug 2015 · Sy 34, Devanahalli taluk |
| Sy. No. 34/3 | 1 | 1 acre | 0 | ||||
| Sy. No. 34/4 | 1 | 20 guntas | 0 | ||||
| Sy. No. 34/5 | 1 | 10 guntas |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2024 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Ekta Elements | 7.0 km | Locked |
|---|
| Classic Canaan This project | This project is the point the others are measured from | 31 Mar 2024 | – | Not verified yet |
|---|---|---|---|---|
| Ekta Elements | 7.0 km | 31 Dec 2027 | – | Locked |
| Rent, 2BHK, 3 km | ₹24,000 /mo · 5 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹21.5 /mo, as listed · 6 listings with a size |
| Projects within 4 km, counted | 13 (5 with an approximate location) | |
|---|---|---|
| Plots in them | 3,352 | |
| Booked | 2,152 of 3,352 (64%) | |
| Unsold | 1,200 | |
| Booked a month, pooled | 45 plots | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest government-flagged flood location | 18.2 km, Shankrappa Layout, MAruthi nagar |
| Nearest storm drain | 1.3 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 100 m to the south-west, an unnamed water body |
| RERA completion date | 31 Mar 2024 | Red flag |
|---|---|---|
| Work began, as filed | 14 Aug 2020 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹12.00 Cr |
|---|
| Escrow bank | HDFC · Richmond Road |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 0 |
| Sy. No. 34/6 | 1 | 10 guntas | 0 |
| Sy. No. 34/7 | 1 | 1 acre | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 13.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.3 km to the south, tertiary drain | |
|---|---|---|
| Ground level | 883 m above sea level, plus or minus 4 m | |
| Metro, operational | 25.3 km, K.R. Puram | |
| Metro, under construction | 3.1 km, KIA Terminal |
| Kempegowda Airport | 12.3 | 18 | 3.2 |
| MG Road (CBD) | 40.3 | 42 | 30.5 |
| Manyata Tech Park | 35.4 | 38 | 22.7 |
| ITPL, Whitefield | 36.5 | 38 | 26.7 |
| Ecospace, Bellandur ORR | 44.3 | 50 | 33.6 |
| Electronic City Ph 1 | 59.5 | 62 | 43.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.9 km to the south-east | |
| Quarry | 2.3 km to the north-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.7 km to the south-west |