Overview
Commune by Are Phase 1
Part ofCommune by Are2 phases, 28 plots
Overview
Commune by Are Phase 1
Part ofCommune by Are2 phases, 28 plots
Overview
Commune by Are Phase 1
Part ofCommune by Are2 phases, 28 plots
Overview
Part ofCommune by Are2 phases, 28 plots

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (Kanakapura Planning Authority) | Sanctioned 26 Nov 2025 · No. 2917 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| SEIAA | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹9.84 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹2.84 Cr | |
| Cost incurred | ₹8.62 Cr (87.6% of the estimate) |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 Nov 2025 | |
| Building plan | Sanctioned 26 Nov 2025 | |
| Escrow bank | Axis Bank · Akshay Nagar |
Data room
90 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Commune by Are Phase 1 in the interactive atlas
Transfer of the land
Title deed registered
No. JPN-1-01277-2007-08 · Book 1
Title deed filed with K-RERA, p. 6 · See it in Documents
Transfer of the land
Title deed registered
No. JPN-1-01277-2007-08 · Book 1
Title deed filed with K-RERA, p. 6 · See it in Documents
Transfer of the land
Title deed registered
No. JPN-1-01277-2007-08 · Book 1
Title deed filed with K-RERA, p. 6 · See it in Documents
Transfer of the land
Sale deed
Survey 151/2, 151/3, 151/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 151/2, 151/3, 151/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 151/2, 151/3, 151/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Urban · Survey 151/2, 151/3, 151/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Urban · Survey 151/2, 151/3, 151/4
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Urban · Survey 151/2, 151/3, 151/4
K-RERA filing, land schedule
Approval or registration
Khata issued
2 Acres, 10 Gunta · Taralu Grama Panchayath · Survey 151/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Kanakapura Planning Authority · plan 2917
K-RERA filing, approvals
Approval or registration
Khata issued
0 Acres, 10 Gunta · Taralu Grama Panchayath · Survey 151/4
K-RERA filing, land schedule
Approval or registration
Khata issued
0 Acres, 10 Gunta · Taralu Grama Panchayth · Survey 151/3
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/180226/008471
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 21 Nov 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: JOINT SURVEY SKETCH-151, 1 page, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 17,887 sq m | |
| Extent the filed land schedule names for these survey numbers | 11,129 sq m | |
| Plot area against the filed extent | 1.61 times | |
| Village, hobli and taluk on the KGIS map | K.G.Tharalu, Uttarahalli-2 hobli, Bangalore-South taluk | |
| Mutation entry | None open on 3 of 3 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 151/2, 151/3, 151/4 | |
|---|---|---|
| Land extent, Sy 151/2 | 2 Acres, 10 Gunta | |
| Land extent, Sy 151/3 | 0 Acres, 10 Gunta | |
| Land extent, Sy 151/4 | 0 Acre, 10 Gunta | |
| Whole survey numbers on the KGIS map | 17,887 sq m (the project holds a share) | |
| Khata | 2 Acres, 10 Gunta · Taralu Grama Panchayath · 24 Nov 2025; 0 Acres, 10 Gunta · Taralu Grama Panchayth · 28 Nov 2025; 0 Acres, 10 Gunta · Taralu Grama Panchayath · 28 Nov 2025 | |
| Sale deed | Dated 1 Jun 2007 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 151/2 | 2 | 2 acres 10 guntas | 0 | ||||
| Sy. No. 151/3 | 1 | 10 guntas | 0 | ||||
| Sy. No. 151/4 | 1 | 10 guntas | 0 |
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jan 2029 |
| Land conversion | Converted 15 Apr 2015 · DC Office, Bangalore Urban | |
|---|---|---|
| Survey numbers | 151/2 · 151/3 · 151/4 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 9 (9 with an approximate location) | |
|---|---|---|
| Plots in them | 1,984 | |
| Booked | 568 of 1,984 (29%) | |
| Unsold | 1,416 | |
| Booked a month, pooled | 12 plots | |
| Months to sell, pooled | 64 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 9 km, Mantri Lake view Appartment Next to Talagattapura Lake | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 1 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
As the promoter reported itPossession date in the agreement

| Completion | 96% | |
|---|---|---|
| Completion, accountant | 87.6% of the estimated cost spent |
| Possession, agreement | 19 Dec 2028 | |
|---|---|---|
| RERA completion date | 31 Jan 2029 | |
| Work began, as filed | 20 Jan 2026 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Architect's certificate, registration | Dated 2 Feb 2026 · site inspected 27 Nov 2025 |
| Escrow bank | Axis Bank · Akshay Nagar | |
|---|---|---|
| Designated account, collected | ₹9.8 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹9.8 L in Q2 2026-27 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Taralu Grama Panchayath Office) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Suvarnamukhi, secondary drain | |
|---|---|---|
| Metro, operational | about 8 km, Silk Institute | |
| Metro, under construction | about 12.5 km, Kalena Agrahara |
| Kempegowda Airport | 61.5 | 50 |
| MG Road (CBD) | 28.5 | 22.5 |
| Manyata Tech Park | 37 | 30.5 |
| ITPL, Whitefield | 46 | 32 |
| Ecospace, Bellandur ORR | 33.5 | 23 |
| Electronic City Ph 1 | 30.5 | 18 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Somanahalli Substation on OpenStreetMap |