Photo: Meetali SinghTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 14 Sep 2021 · No. BBMP/Ad.Com/YLK/0303/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Flats · avg 69 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹5.00 Cr 46.7%Development · ₹5.70 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 14 Sep 2021 | |
| Escrow bank | Karnataka Bank Ltd. · Ashok Nagar |
Data room
170 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Aditrri LotusExtended to 20-12-2026 | ADITRRI BUILDERS AND DEVELOPERS | Apartment | 839 sqft carpet (as filed) | Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Dharani Greens in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 27 Oct 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 1 Oct 2024 |
| Land conversion | Converted 2 Apr 1993 · Office of the Deputy Commissioner Bangalore | |
|---|---|---|
| Survey numbers | D-6 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 19 | 743 |
| Century Kindle Phase 1 | about 0.5 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 2 km | Locked | |
| Legacy Salvador | about 3.5 km | Locked | |
| 4square Park Sierra | about 4 km | Locked | |
| Godrej Aveline | about 4 km | Locked | |
| Rubby Castle 1 | about 4 km | Locked | |
| Assetz Miru & Miyo | about 5 km | Locked | |
| Sri Rama Enclave | about 5 km | Locked | |
| Tnm Lakeview | about 5.5 km | Locked | |
| Assetz Soho & Sky | about 6 km | Locked | |
| Riviera Glade | about 6 km | Locked | |
| Cumins Sanctum | about 6.5 km | Locked |
| Dharani Greens This project | This project is the point the others are measured from | 1 Oct 2024 | – | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 0.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 2 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Legacy Salvador |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Attur, Near Dairy Circle |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Tuteenahalli Lake |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (19 covered spaces for 19 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 20 Sep 2023 |
|---|
| Schedule end | 15 Aug 2024 | |
|---|---|---|
| RERA completion date | 1 Oct 2024 | |
| Work began, as filed | 1 Oct 2021 |
| Building heights, fire NOC | 11 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 1625 sq m |
|---|
| Chartered accountant's certificate, registration | Dated 6 May 2022 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹10.70 Cr | |
|---|---|---|
| Estimated cost, chartered accountant's certificate | ₹11.35 Cr |
Unsold (19) 100%
| Flats sold, at completion | 0 | |
|---|---|---|
| Flats unsold, at completion | 19 | |
| Flats in the phase | 19 |
| Escrow bank | Karnataka Bank Ltd. · Ashok Nagar |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3.5 km |
| 31 Dec 2026 |
| 71% (119 of 167) |
| Locked |
| 4square Park Sierra | about 4 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Godrej Aveline | about 4 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| Rubby Castle 1 | about 4 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
|---|
| Projects within 4 km, counted | 34 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 7,619 | |
| Booked | 4,605 of 7,619 (60%) | |
| Unsold | 3,014 | |
| Booked a month, pooled | 121 flats | |
| Months to sell, pooled | 25 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 9.5 km, Peenya | |
| Metro, under construction | about 3.5 km, Yelahanka |
| Kempegowda Airport | 24.5 | 17.5 |
| MG Road (CBD) | 21 | 15.5 |
| Manyata Tech Park | 13.5 | 9 |
| ITPL, Whitefield | 30.5 | 23 |
| Ecospace, Bellandur ORR | 36.5 | 24 |
| Electronic City Ph 1 | 40.5 | 32.5 |
| Landfill or waste transfer station | about 2.5 km to the west, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named KHB Yelahanka on OpenStreetMap |