Photo: S K DWELLINGS LLPTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 30 Apr 2022 · No. BBMP/Ad.Com./YLK/0055/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 55 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹59.5 L 17.3%Development · ₹2.84 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 30 Apr 2022 | |
| Escrow bank | Axis Bank · ATTUR LAYOUT |
Data room
152 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Great design! Love the building design and the vision of the apartments.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Aditrri LotusExtended to 20-12-2026 | ADITRRI BUILDERS AND DEVELOPERS | Apartment | 839 sqft carpet (as filed) | Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Dhatri Ultima in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Environmental clearance |
|---|
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 29 Apr 2025 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 38/19/20/19/20,38/17/18/17/18 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 18 | 592 |
| Century Kindle Phase 1 | about 0.5 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 1 km | Locked | |
| Rubby Castle 1 | about 3 km | Locked | |
| Legacy Salvador | about 4 km | Locked | |
| 4square Park Sierra | about 4 km | Locked | |
| Sri Rama Enclave | about 4 km | Locked | |
| Godrej Aveline | about 4.5 km | Locked | |
| Assetz Soho & Sky | about 5.5 km | Locked | |
| Assetz Miru & Miyo | about 5.5 km | Locked | |
| Cumins Sanctum | about 6 km | Locked | |
| Tnm Lakeview | about 6.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 6.5 km | Locked |
| Dhatri Ultima This project | This project is the point the others are measured from | 29 Apr 2025 | – | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 0.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 1 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Attur, Near Dairy Circle |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Tur Lake |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup | |
|---|---|---|
| Covered parking per unit | 0.94 (17 covered spaces for 18 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 15 Mar 2024 |
|---|
| Schedule end | 29 Apr 2025 | |
|---|---|---|
| RERA completion date | 29 Apr 2025 | |
| Work began, as filed | 30 Apr 2022 |
| Building heights, fire NOC | 11.5 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 5 sq m |
|---|
| Fire safety | Filed with the registration | |
|---|---|---|
| Environmental clearance | Filed with the registration | |
| Engineer's certificate, registration | Dated 11 Jul 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹3.43 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.43 Cr, same as the filing |
Sold (7) 38.9%Unsold (11) 61.1%
| Flats sold, at completion | 7 | |
|---|---|---|
| Flats unsold, at completion | 11 | |
| Flats in the phase | 18 |
| Escrow bank | Axis Bank · ATTUR LAYOUT |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Legacy Salvador | about 4 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| 4square Park Sierra | about 4 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Sri Rama Enclave | about 4 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Projects within 4 km, counted | 34 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 6,895 | |
| Booked | 3,927 of 6,895 (57%) | |
| Unsold | 2,968 | |
| Booked a month, pooled | 107 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 8.5 km, Peenya | |
| Metro, under construction | about 4 km, Yelahanka |
| Kempegowda Airport | 25 | 18.5 |
| MG Road (CBD) | 21 | 15 |
| Manyata Tech Park | 14 | 9 |
| ITPL, Whitefield | 31 | 23 |
| Ecospace, Bellandur ORR | 34.5 | 23.5 |
| Electronic City Ph 1 | 39 | 32 |
| Landfill or waste transfer station | about 2.5 km to the north-west, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Yelahanka on OpenStreetMap |