| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
99 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
8 of 126 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Divyasree Quiet Side in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner, Bengaluru · Survey 5/3, 6/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Bruhat Bengaluru Mahanagara Palike · Survey 5/3, 6/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0049/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/291026/009050
K-RERA registration
Approval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5/3, 6/1 | |
|---|---|---|
| Land extent, Sy 5/3 | 2 Acre 12 Guntas | |
| Land extent, Sy 6/1 | 2 Acre 32 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 18,308 sq m | |
| Khata | E Khatha · Bruhat Bengaluru Mahanagara Palike · 28 May 2025 | |
| Building plan (BBMP) | Sanctioned 9 Oct 2026 · No. BBMP/Addl.Dir/JDNORTH/0049/25-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Dec 2031 |
| Land conversion | Converted 20 Oct 2014 · Deputy Commissioner, Bengaluru | |
|---|---|---|
| Survey numbers | 5/3 · 6/1 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3 BHK Luxe +SR+ST · avg 131 m² 50%3 BHK Grand + ST · avg 111 m² 47.5%3 BHK Grand + SR + ST 2.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3 BHK Grand + SR + ST | 6 | 9,042 |
| 3 BHK Grand + ST | 112 | 1,33,828 |
| 3 BHK Luxe +SR+ST | 118 | 1,66,173 |
| Century Kindle Phase 1 | about 1.5 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 2 km | Locked | |
| Rubby Castle 1 | about 3 km | Locked | |
| 4square Park Sierra | about 3.5 km | Locked | |
| Legacy Salvador | about 3.5 km | Locked |
| Divyasree Quiet Side This project | This project is the point the others are measured from | 30 Dec 2031 | Not filed | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 1.5 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 2 km | 15 May 2026 | 100% (269 of 269) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Someshwara Nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.63 (385 covered spaces for 236 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 29 Dec 2031 | |
| RERA completion date | 30 Dec 2031 | |
| Work began, as filed | 30 Oct 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | filed: Block A 53.65 m, Block B 74.4 m, Block C 74.4 m | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
Land · ₹63.87 Cr 21.4%Development · ₹234.43 Cr 78.6%
| Estimated cost | ₹298.30 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · Kasturba Road | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 9 Oct 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Kasturba Road | |
| Sri Rama Enclave | about 3.5 km | Locked |
|---|
| Godrej Aveline | about 4.5 km | Locked |
|---|
| Assetz Soho & Sky | about 4.5 km | Locked |
|---|
| Cumins Sanctum | about 5 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 5.5 km | Locked |
|---|
| Tnm Lakeview | about 6 km | Locked |
|---|
| Assetz Miru & Miyo | about 7 km | Locked |
|---|
| Rubby Castle 1 |
|---|
| about 3 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| 4square Park Sierra | about 3.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Legacy Salvador | about 3.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| Sri Rama Enclave | about 3.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Projects within 4 km, counted | 36 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 8,650 | |
| Booked | 4,801 of 8,650 (56%) | |
| Unsold | 3,849 | |
| Booked a month, pooled | 149 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3 km, Yelahanka | |
| Kempegowda Airport | 18.5 |
| MG Road (CBD) | 14 |
| Manyata Tech Park | 7.5 |
| ITPL, Whitefield | 21.5 |
| Ecospace, Bellandur ORR | 22.5 |
| Electronic City Ph 1 | 31 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Yelahanka on OpenStreetMap |