DX MAX appartment is a peaceful place , where all families to leave happily ever , and kids play ground in the parking layout, securitys are humble to speak , good at parking layout
Overview
Ds Max Sasmara
Overview
Ds Max Sasmara
Overview
Ds Max Sasmara
Overview
Photo: milan barmanTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 21 Jan 2021 · No. BBMP/AD.COM/YLK/0470/20-21 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 74 m² 53.4%2BHK · avg 60 m² 46.6%
Location & risks
Construction & progress
Developer
Land · ₹12.33 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 21 Jan 2021 | |
| Escrow bank | Indian Bank · DODDA BANASAWADI |
Data room
113 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
DX MAX appartment is a peaceful place , where all families to leave happily ever , and kids play ground in the parking layout, securitys are humble to speak , good at parking layout
Worst sales team they are not even bothered to show the flats and their price is only for marketing additional keep 15 lakhs
The apartment is in a good location and budget friendly . The team and customer support is excellent special thanks to Anjum madam and Subhan sir for providing excellent support and guidance through out the process
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 55 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
All 58 projects in Hebbal → · DS Max Properties Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ds Max Sasmara in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Environmental clearance | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 4 Dec 2021 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 24 Feb 2011 · Deputy Commissioner, Bangalore District | |
|---|---|---|
| Survey numbers | 97/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 41 | 645 |
| 3BHK | 47 | 797 |
| Sri Rama Enclave | about 1 km | Locked | |
|---|---|---|---|
| Assetz Soho & Sky | about 3 km | Locked | |
| Rubby Castle 1 | about 4 km | Locked | |
| Cumins Sanctum | about 4 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 4.5 km | Locked | |
| 4square Park Sierra | about 5 km | Locked | |
| Magnolia Delight | about 5 km | Locked | |
| Shriram Solitaire | about 5.5 km | Locked | |
| Legacy Salvador | about 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked | |
| Royal Enclave | about 5.5 km | Locked | |
| Sumadhura Epitome | about 5.5 km | Locked |
| Ds Max Sasmara This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Sri Rama Enclave | about 1 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Assetz Soho & Sky | about 3 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Rubby Castle 1 | about 4 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, JRD Tata Nagar |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.32 (116 covered spaces for 88 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 29 Nov 2023 |
|---|
| Schedule end | 31 Dec 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 15 Dec 2021 |
| Building heights, fire NOC | 14.4 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 19.6 sq m |
|---|
| Environmental clearance | Filed with the registration | |
|---|---|---|
| Architect's certificate, registration | Dated 20 Nov 2021 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹27.65 Cr |
|---|
Sold (45) 51.1%Unsold (43) 48.9%
| Flats sold, at completion | 45 | |
|---|---|---|
| Flats unsold, at completion | 43 | |
| Flats in the phase | 88 |
| Escrow bank | Indian Bank · DODDA BANASAWADI |
|---|
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Other phases under this promoter name | 39 | |
| With a filed extension or completion | 21 (18 completed, 3 extended) | |
| Average schedule slip | 22 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Cumins Sanctum | about 4 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 4.5 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
|---|
| 4square Park Sierra | about 5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 2,171 | |
| Booked | 1,332 of 2,171 (61%) | |
| Unsold | 839 | |
| Booked a month, pooled | 34 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 5 km, Yeshwantpur | |
| Metro, under construction | about 2 km, Kodigehalli |
| Kempegowda Airport | 27 | 21 |
| MG Road (CBD) | 11.5 | 9.5 |
| Manyata Tech Park | 7.5 | 5 |
| ITPL, Whitefield | 24.5 | 19.5 |
| Ecospace, Bellandur ORR | 27 | 19 |
| Electronic City Ph 1 | 31 | 27 |
| Landfill or waste transfer station | about 2.5 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Sahakar Nagara on OpenStreetMap |