Purchased this property. Happy about it. Location is good Mr Abdul Rahaman helped me at every step Special thanks to him Actually I was customer of Anamika, but there was no support from her end at all. She is causing frustration to…
LLinta Bawankar26 Sep 2026★★★★★
We recently booked an apartment at DS-MAX Sky Blossom and had an excellent experience. The entire booking process was structured very well and completely stress-free. Ms. Anamika from the team was incredibly helpful and handled all our…
SSuhas Kulkarni19 Jul 2026★★★★★
Please get guarantee that they will not force to go with their interiors Krish V interiors. One of the worst you can get in Bangalore. Please do not book or you will regret later. Don’t book 30k and advance. Get in written that your…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ds Max Sky Blossom in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 6 Dec 2023 · No. BBMP/CC/9220/23-24
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/343/2022 · issued 23 Nov 2022 · building height 43.95 m
✓Clear
Environmental clearance
SEIAA 113 CON 2022 · EC identification no. EC23B038KA154841 · issued 3 Feb 2023
✓Clear
Airport height NOC
NOC ID HOSU/SOUTH/B/080222/687868
Pollution board (CFE)
consent order CTE-333695 · issued 7 Oct 2022 · valid until 6 Oct 2027
✓Clear
Water and sewerage NOC (BWSSB)
issued 28 Feb 2023
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
28 Feb 2029
Registration certificates
PRM/KA/RERA/1251/310/PR/210324/006724
Land use
Conversion order
Land conversion
Converted 31 Oct 2008 · DC Bengaluru
Survey numbers
134/3
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹18.51 Cr 23.1%Development · ₹61.60 Cr 76.9%
Form 4
Estimated cost, at registration
₹80.12 Cr
Estimated cost, architect's certificate
₹80.12 Cr, same as the filing
Estimated cost, engineer's certificate
₹59.76 Cr
Estimated cost, Form 4 Q2 2026-27
₹61.60 Cr
Cost incurred
₹33.79 Cr (54.8% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (137) 53.7%Unsold (118) 46.3%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
99 / 255 · 156 available
Sold, Q4 2025-26
112 / 255 · 143 available
Sold, Q1 2026-27
125 / 255 · 130 available
Sold, Q2 2026-27
137 / 255 · 118 available
Unsold, Q2 2026-27
118
Sold in Q4 2025-26
13
Sold in Q1 2026-27
13
Sold in Q2 2026-27
12
Flats booked, Form 4 Q4 2025-26
112
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
STATE BANK OF INDIA · SME Mahadevapura Bengaluru
Designated account, collected
₹22.38 Cr in Q2 2026-27
Designated account, withdrawn
₹20.09 Cr in Q2 2026-27 (90% of that quarter's deposits)
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
46
Marked completed
26
Past promised date, not completed
6
Other phases under this promoter name
39
With a filed extension or completion
22 (19 completed, 3 extended)
Average schedule slip
22 months
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot