No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Approvals
Is it approved for its use?
Clear3 clear
RERA extensionsNone on the filingFiling read 20 Oct 2026
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Completed: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Nearest 12 with filed prices
Location & risks
What is the location like?
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedSelf developmentDeclared by the promoter
The site
Flooding
Site vs nearest drain
Construction & progress
How is it being built, and when will it be ready?
CompletionCompletedOccupancy certificate, 22 Oct 2024
Possession, agreement15 Mar 2023Agreement for sale, p. 8
StructureRCC framed structureAs specified
Progress
Completion, architect
Completed: no quarterly return is on this phase's K-RERA filing
Work left
By component
Developer
Can the developer deliver?
Sold55 / 77At the completion filing, 16 Dec 2024
Sold in the latest quarterNo return filed
Funding
Estimated cost
Land · ₹20.92 Cr 33.3%Development · ₹41.85 Cr
Loan & collateral
Can it be financed?
Conditions
Collateral checks
Escrow bank
STATE BANK OF INDIA · IFB INDUSTRIAL BRANCH
Stage
Certified progress
Completed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Locked
91 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
I recently had a great experience at DSR Vertex and wanted to share some positive feedback. One of the standout aspects of staying here is the exceptional accessibility. The apartment's location is incredibly convenient, especially with…
RRam Narayan6 Jan 2026★★★★★
Superb place. Quality of construction and best amenities are provided for residents. Price is bit expensive...perhaps for the location and amenities it may be justified.
SSumona Haldar11 Apr 2024★★★★★
Very good society. Very convenient as it is located beside main road. Positions of every unit is very well. Privacy is there like main Door or any windows or balconies are not opening on the opposite unit side. Most important is it is…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Dsr Vertex And Apex is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; How the land reached this project; Title report; Charges; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Landowner share; Developer share; Sale deed signed by.
Valid as of this reportValidity ended
Approval letters
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/142/2019 · building height 39.95 m
✓Clear
Environmental clearance
SEIAA 38 CON 2019 · issued 3 Jul 2019
✓Clear
Airport height NOC
NOC ID BIAL/SOUTH/B/070419/412065 · issued 24 Jul 2019 · permissible top elevation 929.59 m above mean sea level · valid until 23 Jul 2027
✓Clear
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
15 Dec 2023
Registration certificates
PRM/KA/RERA/1251/446/PR/200526/003419
Not verified yet: Building plan, Land conversion, Conversion order.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Unit mix filed; Unit types; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields; Months to sell unsold stock; K-RERA inventory.
Nearest storm drain
about 0.5 km from the locality centre, secondary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, an unnamed water body
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Self development
Distances
Approximate: village level
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
about 2 km from the locality centre
Sewage treatment plant
about 1 km from the locality centre, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 1 km from the locality centre, named Brigade Tech Gardens Brookefield on OpenStreetMap
Not verified yet: Metro, operational; Power lines, flood-prone areas, drains; Planning and hazards; Drains and lakes; Specification and Form 5; Nearest city water main; Ground level; Metro, under construction; Road distance from the site; Six city anchors · OSRM, no traffic.
Completed: no quarterly return is on this phase's K-RERA filing
Quarterly return
Completion
Completed, occupancy certificate 22 Oct 2024
Dates
Dates
Filed dates
Possession, agreement
15 Mar 2023
Schedule end
23 Jan 2023
RERA completion date
15 Dec 2023
Completion date, agreement
15 Mar 2023
Work began, as filed
12 Feb 2020
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Building heights, fire NOC
39.95 m on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Structural safety certificate; Main structure; Electrical and plumbing finishing; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Power backup; Sewage plant; Structural engineer, quarterly; Design consultants (Form 6).
66.7%
Form 4
Estimated cost, at registration
₹62.77 Cr
Sales
Sold vs unsold, at completion
Sold (55) 71.4%Unsold (22) 28.6%
Sold per quarter
Completed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Flats sold, at completion
55
Flats unsold, at completion
22
Flats in the phase
77
Compliance
Escrow
Completed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
STATE BANK OF INDIA · IFB INDUSTRIAL BRANCH
Track record
DOSL builder track
K-RERA registrations under this promoter
8
Marked completed
6
Past promised date, not completed
2
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip.
Basemap: Esri, OpenStreetMap contributors
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.
Map centred on the village the filing names, approximate: village level. The filing names only the village. The marker is its centre and the ring is 5 km; it does not mark the site.