Title & ownership
Approvals
| Building plan (BIAPPA) | Sanctioned 5 Aug 2023 · No. 116/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress

Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 5 Aug 2023 | |
| Escrow bank | Industrial Development Bank of India · Sarakki Lake Branch |
Data room
137 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 2 of 3 filed survey numbers matched, 1 found no plot.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | 2 | 1 | Review |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 5 sections
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Earth Aroma Phase-2 in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 19/1, 19/3 | Converted 17 Jan 2023 · DC Bengaluru | |
| Sy 20/1 | Converted 13 Mar 2023 · DC Bengaluru | |
| Survey numbers | 19/1 · 19/3 · 20/1 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 70 m from the site | Clear |
| Nearest government-flagged flood location | 12.7 km, Kondappa layout | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 2.2 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the west, an unnamed tank |
| Layout works specified | Compound wall and entrance gate; levelling and grading; underground sewerage and storm water drain; underground water supply system; underground electrical cables; street lights; CC roads; footpath and kerb stones; parks and play ground |
|---|
| Completion | 100% | |
|---|---|---|
| Completion, accountant | 92.6% of the estimated cost spent |
| Possession, agreement | 31 Dec 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | Review |
| Work began, as filed | 1 Oct 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Layout works | Compound wall and entrance gate; levelling and grading; underground sewerage and storm water drain; underground water supply system; underground electrical cables; street lights; CC roads; footpath and kerb stones; parks and play ground |
|---|
| Structural engineer, quarterly | Form 6 · Feb 2026 | Clear |
|---|---|---|
| Architect's certificate, registration | Dated 12 Sep 2023 · site inspected 15 Aug 2023 | |
| Engineer's certificate, registration | Dated 8 Sep 2023 | |
| Chartered accountant's certificate, registration | Dated 27 Sep 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹1.56 Cr 11.5%Development · ₹12.02 Cr 88.5%
| Estimated cost, at registration | ₹13.58 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹7.33 Cr | |
| Cost incurred | ₹12.57 Cr (92.6% of the estimate) | |
| Cost left | ₹1.01 Cr | |
| Receivable, sold plots | ₹17.56 Cr |
| Escrow bank | Industrial Development Bank of India · Sarakki Lake Branch | |
|---|---|---|
| Designated account, collected | ₹12.67 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹12.70 Cr in Q3 2025-26 | |
| Escrow account, Q3 2025-26 | Opened at ₹80.4 L, ₹12.70 Cr withdrawn | |
| Escrow account to date, Q3 2025-26 | ₹32.14 Cr deposited from sales, ₹31.36 Cr withdrawn, balance ₹77.5 L | |
| Share of collections the promoter declared for escrow | 70% |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Panchayath) | |
| Nearest city water main | 9.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.2 km to the west, tertiary drain | |
|---|---|---|
| Ground level | 911 m above sea level, plus or minus 4 m | |
| Metro, operational | 22.3 km, Dasarahalli | |
| Metro, under construction | 6.2 km, Doddajala |
| Kempegowda Airport | 17.1 | 23 | 11.8 |
| MG Road (CBD) | 32.9 | 37 | 27.7 |
| Manyata Tech Park | 28.1 | 32 | 20.1 |
| ITPL, Whitefield | 43.7 | 50 | 30.4 |
| Ecospace, Bellandur ORR | 48.4 | 57 | 34.4 |
| Electronic City Ph 1 | 52.8 | 61 | 43.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 2.9 km to the south-west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |