Photo: DA ConstructionTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BIAPPA) | Sanctioned 22 Dec 2023 · No. BIAPPA/TP/LAO/113/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress

Developer
Land · ₹16.21 Cr 88.6%Development · ₹2.09 Cr 11.4%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 15 Oct 2024 | |
| Building plan (BIAPPA) | Sanctioned 22 Dec 2023 | |
| Escrow bank | Indian Bank · Indiranagar |
Data room
165 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | Review |
| Construction & progress | – | 1 | 1 | Review |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
All 308 projects in Devanahalli → · Elite Estates's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Elite Rose Phase 3 in the interactive atlas
Transfer of the land
Title deed executed
Sy 284/3, Kasaba hobli, Devanahalli taluk · 0-13 guntas
Title deed filed with K-RERA, pp. 1, 18 · See it in Documents
Covers 284/5 only
Approval or registration
Land use converted
DC Bangalore · Survey 284/5
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Rural · Survey 349/5, 284/4
K-RERA filing, land schedule
Covers 284/4 only
Approval or registration
Land use converted
DC Bangalore Rural · Survey 349/5, 284/4
K-RERA filing, land schedule
Covers 284/3 only
Approval or registration
Land use converted
DC Bangalore Rural · Survey 284/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · TMC Devanahalli · Survey 349/5, 284/5, 284/4
K-RERA filing, land schedule
Covers 284/5, 284/4 only
Approval or registration
Khata issued
A Khatha · TMC Devanahalli · Survey 349/5, 284/5, 284/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAPPA/TP/LAO/113/2022-23
K-RERA filing, approvals
Covers 284/3 only
Approval or registration
Khata issued
A Khatha · TMC Devanahalli · Survey 284/3
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/041225/008301
K-RERA registration
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 15 Oct 2024 |
|---|
| Developer's project loan | None declared |
|---|
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 285 (Devanahalli); road |
| East | EC schedule not read yet | Survey 281, 350 (Devanahalli) |
| South | EC schedule not read yet | road |
| West | EC schedule not read yet | Survey 348 (Devanahalli) |
Page 1
Page 1 of 3 of the encumbrance certificate. Filed with K-RERA: EC Sy No 349-5, 3 pages.
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: ROSE PH 3 - Joint Sketch, 2 pages, not in English.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Matched plots on the KGIS map | 24,814 sq m | |
| Village, hobli and taluk on the KGIS map | Devanahalli, Kasaba hobli, Devanahalli taluk | |
| Mutation entry | None open on 4 of 4 filed surveys |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 349-5, 284-5, 284-4, 284-3 | |
|---|---|---|
| Area on the KGIS map | 24,814 sq m, 2 of 2 filed survey numbers | |
| Khata | A Khatha · TMC Devanahalli · 6 Feb 2023; A Khatha · TMC Devanahalli · 6 Feb 2025 | |
| Title deed | No. DNH-1-07925-2016-17 · Book 1 |
| Sy. No. 349/5 | Not read yet | 0 | ||||
| Sy. No. 284/5 | Not read yet | 0 | ||||
| Sy. No. 284/4 | Not read yet | 0 | ||||
| Sy. No. 284/3 | Not read yet | 0 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 349-5, 284-4 | Converted 20 Jan 2023 · DC Bangalore Rural | |
| Sy 284-5 | Converted 20 Jan 2023 · DC Bangalore | |
| Sy 284-3 | Converted 23 Jan 2023 · DC Bangalore Rural | |
| Survey numbers | 349-5 · 284-5 · 284-4 · 284-3 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Ekta Elements | 8.7 km | Locked |
|---|
| Elite Rose Phase 3 This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Ekta Elements | 8.7 km | 31 Dec 2027 | – | Locked |
| Rent, 2BHK, 3 km | ₹20,000 /mo · 5 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹20.3 /mo, as listed · 7 listings with a size |
| Projects within 4 km, counted | 15 (7 with an approximate location) | |
|---|---|---|
| Plots in them | 3,937 | |
| Booked | 2,711 of 3,937 (69%) | |
| Unsold | 1,226 | |
| Booked a month, pooled | 46 plots | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 76% Agriculture, 14% Industrial (general), 6% Residential (main) | Review |
|---|---|---|
| Nearest government-flagged flood location | 20.1 km, Shankrappa Layout, MAruthi nagar | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 420 m to the south-east, an unnamed water body |
| Completion | 100% |
|---|
| Possession, agreement | 31 Dec 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | Review |
| Work began, as filed | 1 Sep 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Mar 2026 | Clear |
|---|---|---|
| Architect's certificate, registration | Dated 6 Aug 2024 · site inspected 1 Aug 2024 | |
| Engineer's certificate, registration | Dated 6 Aug 2024 | |
| Chartered accountant's certificate, registration | Dated 2 Aug 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹18.30 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹2.09 Cr | |
| Estimated cost, chartered accountant's certificate | ₹18.30 Cr, same as the filing | |
| Cost incurred | ₹18.13 Cr |
| Escrow bank | Indian Bank · Indiranagar | |
|---|---|---|
| Designated account, collected | ₹0 in Q3 2025-26 | |
| Designated account, withdrawn | ₹0 in Q3 2025-26 |
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 8 | Review |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (TMC Devanahalli) | |
| Nearest city water main | 15.6 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 910 m above sea level, plus or minus 4 m | |
| Metro, operational | 27.5 km, K.R. Puram | |
| Metro, under construction | 5.3 km, KIA Terminal |
| Kempegowda Airport | 12.3 | 15 | 5.4 |
| MG Road (CBD) | 37.8 | 38 | 32.6 |
| Manyata Tech Park | 32.9 | 34 | 24.8 |
| ITPL, Whitefield | 40.3 | 37 | 28.8 |
| Ecospace, Bellandur ORR | 50.9 | 50 | 35.8 |
| Electronic City Ph 1 | 57.6 | 63 | 45.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.0 km to the east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the north |