Overview
Elv High Garden
Overview
Elv High Garden
Overview
Elv High Garden
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Special DC, Bangalore Urban · Survey 53/3
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹169.15 Cr | |
|---|---|---|
| Estimated cost, architect's certificate |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 20 Jul 2022 | |
| Escrow bank | RATNAKAR BANK · prestige towers |
Data room
173 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | 1 | Review |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Elv High Garden in the interactive atlas
Approval or registration
Khata issued
A Khatha · BBMP · Survey 53/3
K-RERA filing, land schedule
Transfer of the land
Joint development agreement registered
Joint development agreement, p. 7 · See it in Documents
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0064/2019-20
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/181122/005469
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 38 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 38 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 53/3 | |
|---|---|---|
| Land extent, Sy 53/3 | 3 Acre 20 Gunta | |
| Land area of this registration | 14,164 sq m | |
| Khata | A Khatha · BBMP · 4 Oct 2018 |
| Joint development agreement registered | 1 Dec 2018 |
|---|
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 20 Jul 2022 · No. BBMP/Addl.Dir/JDNORTH/0064/2019-20 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/330/2019 · issued 26 May 2020 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | NOC ID BANG/SOUTH/B/110618/347519 · issued 5 Dec 2018 · permissible top elevation 929.65 m above mean sea level · valid until 4 Dec 2026 | Clear |
| KSPCB | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 17 Feb 2021 |
| RERA extensions | Granted · Approved 2 Sep 2026 | |
|---|---|---|
| RERA completion date | 2 Oct 2027 |
| Land conversion | Converted 16 Mar 2010 · Special DC, Bangalore Urban | |
|---|---|---|
| Survey numbers | 53/3 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 79 m² 73.1%3BHK · avg 114 m² 16.4%2.5BHK · avg 99 m² 10.5%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2.5BHK | 23 | 1,063 |
| 2BHK | 160 | 847 |
| 3BHK | 36 | 1,224 |
| Sold, Q2 2026-27 | 76 / 219 | |
|---|---|---|
| Unsold, Q2 2026-27 | 143 | |
| Months to sell, derived from filed bookings | 215 months |
| Nirmaanika Aria | about 1.5 km | Locked | |
|---|---|---|---|
| Godrej Splendour Phase II | about 2 km | Locked | |
| Godrej Splendour | about 2 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 2 km | Locked | |
| Sowparnika Euphoria in the East | about 2.5 km | Locked | |
| Vintage Valley | about 3.5 km | Locked | |
| Godrej Woodscapes | about 3.5 km | Locked | |
| Sattva Songbird | about 4 km | Locked | |
| Kumari Nautilus | about 4 km | Locked | |
| Godrej Parkshire (Hoskote) | about 4 km | Locked | |
| Axis Ekatva | about 4.5 km | Locked | |
| Garuda Grand | about 4.5 km | Locked |
| Elv High Garden This project | This project is the point the others are measured from | 2 Oct 2027 | 35% (76 of 219) | Not verified yet |
|---|---|---|---|---|
| Nirmaanika Aria | about 1.5 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
| Godrej Splendour Phase II | about 2 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
| Godrej Splendour |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 2 km, SAI BABA ASHRAM KADUGODI |
|---|
| Nearest storm drain | about 1 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Covered parking per unit | 1.71 (374 covered spaces for 219 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 15% · planned by 6 Sep 2024 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 29 Jun 2025 | |
| Completion | 32% |
| Schedule end | 25 Sep 2026 | |
|---|---|---|
| RERA completion date | 2 Oct 2027 | |
| Grace period for possession | 6 months | |
| Work began, as filed | 2 Oct 2022 |
| Building heights, fire NOC | 43.6 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 79 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Jun 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/330/2019 · issued 26 May 2020 | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Feb 2026, Jun 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 13 Sep 2022 · site inspected 10 Sep 2022 | |
| Engineer's certificate, registration | Dated 13 Sep 2022 | |
| Chartered accountant's certificate, registration | Dated 13 Sep 2022 | |
| Architect's quarterly progress certificate | 30.5% complete per the architect, as of 7 Jul 2026 | |
| Architect's quarterly progress certificate dated | 7 Jul 2026 | |
| Architect's site inspection for the quarterly progress certificate | 30 Jun 2026 |
| ₹23.60 Cr |
| Estimated cost, engineer's certificate | ₹148.00 Cr |
|---|
Sold (76) 34.7%Unsold (143) 65.3%
| Sold, Q3 2025-26 | 70 / 219 · 149 available | |
|---|---|---|
| Sold, Q4 2025-26 | 76 / 219 · 143 available | |
| Sold, Q1 2026-27 | 76 / 219 · 143 available | |
| Sold, Q2 2026-27 | 76 / 219 · 143 available | |
| Unsold, Q2 2026-27 | 143 | |
| Sold in Q4 2025-26 | 6 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | RATNAKAR BANK · prestige towers | |
|---|---|---|
| Designated account, collected | ₹64.2 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹64.2 L in Q2 2026-27 (100% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹93,79,03,638 | |
| Net amount withdrawable, Form 4 | ₹41,23,54,392 |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 5 | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2 km |
| 20 Mar 2027 |
| 98% (1,135 of 1,161) |
| Locked |
| Assetz Bloom & Dell - Phase 2 | about 2 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
|---|
| Sowparnika Euphoria in the East | about 2.5 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Vintage Valley | about 3.5 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Projects within 4 km, counted | 53 (53 with an approximate location) | |
|---|---|---|
| Flats in them | 25,898 | |
| Booked | 15,557 of 25,898 (60%) | |
| Unsold | 10,341 | |
| Booked a month, pooled | 182 flats | |
| Months to sell, pooled | 51 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, primary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Whitefield | |
| Metro, under construction | about 8.5 km, Doddanekundi |
| Kempegowda Airport | 32 | 21 |
| MG Road (CBD) | 24 | 18 |
| Manyata Tech Park | 23.5 | 15.5 |
| ITPL, Whitefield | 6 | 4.5 |
| Ecospace, Bellandur ORR | 16.5 | 13.5 |
| Electronic City Ph 1 | 30 | 22 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |