They initially said they will only allow a 5 storey commercial establishment, now they are doing whatever the hell they want. Very unprofessional to lie
Overview
Embassy Sky Terraces
Overview
Embassy Sky Terraces
Overview
Embassy Sky Terraces
Overview
Photo: Embassy Sky Terraces (Astra)They initially said they will only allow a 5 storey commercial establishment, now they are doing whatever the hell they want. Very unprofessional to lie
Well they have collected the EOI 7 months back but not launched the project. Reason COULD be the following: - Challenges from Lake Terraces as the project will block the view - Wanting to take the sales to April 1 - No money with them !! -…
If you want Embassy property for investment, this is great location and project. Just like Lake terraces, same location almost. Very good surroundings and land area for the homes, school and hospital and college also very next to Embassy…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 56 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Embassy Sky Terraces in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Soho & Sky, price locked; Assetz Soho & Sky Phase 1b, price locked; Lodha Mirabelle, price locked; Sumadhura Epitome, price locked; Sumadhura Solea, price locked.
| Assetz Soho & Sky | 1.9 km | Locked | |
|---|---|---|---|
| Cumins Sanctum | about 2.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | 3.1 km | Locked | |
| Mirabelle Phase 2 | about 3 km | Locked | |
| Magnolia Delight | about 3 km | Locked | |
| Lodha Mirabelle | 3.2 km | Locked | |
| Sumadhura Epitome | 3.6 km | Locked | |
| Sri Rama Enclave | about 3.5 km | Locked | |
| Sumadhura Solea | 3.7 km | Locked | |
| Brr North Excellency Phase I | about 4.5 km | Locked | |
| 4square Park Sierra | 5.0 km | Locked | |
| Sobha City Athena | about 5 km | Locked |
| Embassy Sky Terraces This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Assetz Soho & Sky | 1.9 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Cumins Sanctum | about 2.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Assetz Soho & Sky Phase 1b | 3.1 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
| Mirabelle Phase 2 | about 3 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Magnolia Delight | about 3 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Lodha Mirabelle | 3.2 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Rent, 4BHK, 3 km | ₹1,08,000 /mo · 6 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹44,000 /mo · 39 listings | |
| Rent, 2BHK, 3 km | ₹25,000 /mo · 70 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 43 listings | |
| Rent per sq ft, 3 km | ₹26.4 /mo, as listed · 74 listings with a size |
| Projects within 4 km, counted | 26 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 5,282 | |
| Booked | 3,339 of 5,282 (63%) | |
| Unsold | 1,943 | |
| Booked a month, pooled | 63 flats | |
| Months to sell, pooled | 31 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 490 m, From Esteem mall beside Dhobi Ghat to Yogesh nagar bridge |
| Nearest storm drain | 160 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 450 m to the south-west, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Nearest city water main | 340 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 160 m to the east, tertiary drain | |
|---|---|---|
| Ground level | 907 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.9 km, Yeshwantpur | |
| Metro, under construction | 840 m, Kodigehalli |
| Kempegowda Airport | 27.6 | 28 | 20.3 |
| MG Road (CBD) | 10.6 | 14 | 8.4 |
| Manyata Tech Park | 5.1 | 8 | 2.7 |
| ITPL, Whitefield | 22.1 | 28 | 16.9 |
| Ecospace, Bellandur ORR | 26.1 | 35 | 16.6 |
| Electronic City Ph 1 | 30.4 | 39 | 25.1 |
| Landfill or waste transfer station | 2.5 km to the north | |
|---|---|---|
| Sewage treatment plant | 960 m to the south-east, named Hebbal 60MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.5 km to the west |