Overview
Folium by Sumadhura Phase-II
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Folium by Sumadhura Phase-II
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Folium by Sumadhura Phase-II
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Part ofFolium by Sumadhura4 phases, 2,240 flats
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 650/398
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 23 Mar 2023 · No. BBMP/Addl.Dir/JDNORTH/0092/22-23 & PRJ/3863/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Flats · avg 105 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | Bajaj Housing Finance Ltd · ₹70.00 Cr disbursed | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 23 Mar 2023 | |
| Escrow bank | INDUSIND BANK · M G ROAD BANGALORE |
Data room
156 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Sumadhura Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Folium by Sumadhura Phase-II in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹40.00 Cr
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 650/398
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹57.00 Cr · Sy 48/1C, K.R.Puram hobli
Title deed filed with K-RERA, pp. 1, 5, 10 · See it in Documents
Approval or registration
Khata issued
A Khatha · ARO Whitefiled BBMP · Survey 650/398
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0092/22-23 & PRJ/3863/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/250423/005893
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | Bajaj Housing Finance Ltd · ₹70.00 Cr disbursed |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 650/398 | |
|---|---|---|
| Land extent, Sy 650/398 | 15 Acre, 20.03 Gunta / 62728 Sq.M | |
| Land area of this registration | 24,896 sq m | |
| Khata | A Khatha · ARO Whitefiled BBMP · 21 Nov 2022 | |
| Sale deed | Dated 18 Dec 2018 | |
| Sale deed in favour of | Sumadhura Infracon Private Limited | |
| Title deed | Sy 48/1C, Krishnarajapuram hobli · 0.44 acre | |
| Title deed | Consideration ₹5.22 Cr · Sy 48/1C, Krishnarajapuram hobli · 0.56 acre | |
| Title deed | Sy 48/3 | |
| Title deed | Consideration ₹17.5 L | |
| Title deeds | And 3 more read from the filing |
| Fire NOC | KSFES/NOC/311/2020 · issued 23 Apr 2021 | Clear |
|---|
| Environmental clearance | SEIAA 39 CON 2021 · EC identification no. EC22B039KA137985 · issued 23 Mar 2022 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | consent order W-350627 · issued 19 Sep 2025 |
|---|
| Water and sewerage NOC (BWSSB) | issued 24 Jun 2021 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 19 Jan 2019 · DC Office Bangalore Urban | |
|---|---|---|
| Survey numbers | 650/398 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 400 | 1,131 |
| Reflections 66 | about 0.5 km | Locked | |
|---|---|---|---|
| Assetz 66 & Shibui | about 1 km | Locked | |
| Coevolve Misty Shores | about 1.5 km | Locked | |
| Axis Ekatva | about 1.5 km | Locked | |
| Vaswani Starlight | about 1.5 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2.5 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 3 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 3 km | Locked | |
| Inspira Infinity | about 3 km | Locked | |
| Poetry Of Earth | about 3.5 km | Locked | |
| Vintage Valley | about 4 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 4 km | Locked |
| Folium by Sumadhura Phase-II This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | about 0.5 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Coevolve Misty Shores |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Varthur Columbia Asia hospital |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Sheelavantana Lake |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.00 (400 covered spaces for 400 units) | |
| Power backup | Declared by the promoter |
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
| Completion | Completed, occupancy certificate 4 Jun 2025 |
|---|
| Schedule end | 30 Sep 2025 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 1 Mar 2023 |
| Building heights, fire NOC | 59.95 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 169.33 sq m |
|---|
| Fire safety | KSFES/NOC/311/2020 · issued 23 Apr 2021 | |
|---|---|---|
| Environmental clearance | SEIAA 39 CON 2021 · EC identification no. EC22B039KA137985 · issued 23 Mar 2022 | |
| Engineer's certificate, registration | Dated 24 Mar 2023 | |
| Chartered accountant's certificate, registration | Dated 21 Mar 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹109.08 Cr 26.7%Development · ₹299.26 Cr 73.3%
| Estimated cost, at registration | ₹408.34 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹217.10 Cr |
Sold (333) 83.3%Unsold (67) 16.8%
| Flats sold, at completion | 333 | |
|---|---|---|
| Flats unsold, at completion | 67 | |
| Flats in the phase | 400 |
| Escrow bank | INDUSIND BANK · M G ROAD BANGALORE |
|---|
| K-RERA registrations under this promoter | 18 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 17 | |
| With a filed extension or completion | 7 (7 completed, 0 extended) | |
| Average schedule slip | 13 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1.5 km |
| 31 Dec 2029 |
| 2% (3 of 153) |
| Locked |
| Axis Ekatva | about 1.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Vaswani Starlight | about 1.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2.5 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Projects within 4 km, counted | 79 (79 with an approximate location) | |
|---|---|---|
| Flats in them | 22,091 | |
| Booked | 13,600 of 22,091 (62%) | |
| Unsold | 8,491 | |
| Booked a month, pooled | 331 flats | |
| Months to sell, pooled | 22 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 2 km, Kadugodi | |
| Metro, under construction | about 4.5 km, ISRO |
| Kempegowda Airport | 38 | 26 |
| MG Road (CBD) | 18 | 15.5 |
| Manyata Tech Park | 20 | 16 |
| ITPL, Whitefield | 5 | 2.5 |
| Ecospace, Bellandur ORR | 10.5 | 8 |
| Electronic City Ph 1 | 25 | 16 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Prestige Tech Forest Substation on OpenStreetMap |