Overview
Folium by Sumadhura Phase-IV
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Folium by Sumadhura Phase-IV
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Folium by Sumadhura Phase-IV
Part ofFolium by Sumadhura4 phases, 2,240 flats
Overview
Part ofFolium by Sumadhura4 phases, 2,240 flats
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BBMP) | Sanctioned 15 Dec 2025 · No. BBMP/Addl.Dir/JDNORTH/0056/25-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 5 Sep 2026 | |
| Building plan (BBMP) | Sanctioned 15 Dec 2025 | |
| Escrow bank | ICICI Bank · Commissariat Road Bangalore |
Data room
199 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Sumadhura Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Folium by Sumadhura Phase-IV in the interactive atlas
Covers 47/3 only
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/3, 48/3
K-RERA filing, land schedule
Covers 48/3 only
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/3, 48/3
K-RERA filing, land schedule
Covers 47/2B only
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/2B, 84/1C, 48/5
K-RERA filing, land schedule
Covers 48/5 only
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/2B, 84/1C, 48/5
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/2B, 84/1C, 48/5
K-RERA filing, land schedule
Covers 47/1 only
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/1
K-RERA filing, land schedule
Covers 47/1 only
Approval or registration
Khata issued
A Khatha · ARO Whitefiled BBMP · Survey 47/1
K-RERA filing, land schedule
Covers 47/2A, 47/2B only
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/2A, 47/2B; LCCP102438/2023 · Survey 84/1C; Varthur Bangalore Urban · Survey 48/5
K-RERA filing, land schedule
Covers 48/5 only
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/2A, 47/2B; LCCP102438/2023 · Survey 84/1C; Varthur Bangalore Urban · Survey 48/5
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/2A, 47/2B; LCCP102438/2023 · Survey 84/1C; Varthur Bangalore Urban · Survey 48/5
K-RERA filing, land schedule
Covers 47/2A only
Transfer of the land
Sale deed
in favour of Sumadhura Infracon Private Limited · Survey 47/2A
K-RERA filing, land schedule
Covers 47/3 only
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/3, 48/3; LCCP102438/2023 · Survey 48/4
K-RERA filing, land schedule
Covers 48/3, 48/4 only
Approval or registration
Land use converted
DC Office Bangalore Urban · Survey 47/3, 48/3; LCCP102438/2023 · Survey 48/4
K-RERA filing, land schedule
Covers 47/2A, 47/2B, 47/3 only
Approval or registration
Khata issued
E Khatha · ARO Whitefiled BBMP · Survey 47/2A, 47/2B, 47/3, 48/3 and 2 more
K-RERA filing, land schedule
Covers 48/3, 48/4 only
Approval or registration
Khata issued
E Khatha · ARO Whitefiled BBMP · Survey 47/2A, 47/2B, 47/3, 48/3 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · ARO Whitefiled BBMP · Survey 47/2A, 47/2B, 47/3, 48/3 and 2 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0056/25-26
K-RERA filing, approvals
Covers 48/5 only
Approval or registration
Khata issued
E Khatha · ARO Whitefiled BBMP · Survey 48/5
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/050126/008382
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 5 Sep 2026 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: III of 4 Encumbrance Certificate for all Sy Nos.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 47/1, 47/2A, 47/2B, 47/3, 48/3, 48/4 and 2 more | |
|---|---|---|
| Land area of this registration | 11,445 sq m | |
| Khata | A Khatha · ARO Whitefiled BBMP · 21 Nov 2021; E Khatha · ARO Whitefiled BBMP · 23 Oct 2025; E Khatha · ARO Whitefiled BBMP · 23 Dec 2025 | |
| Sale deed | Dated 23 Oct 2018, 26 Dec 2018, 15 Mar 2023 | |
| Sale deed in favour of | Sumadhura Infracon Private Limited |
| Fire NOC |
|---|
| KSFES/NOC/092/2026 · issued 4 Apr 2026 | Clear |
| Environmental clearance | SEIAA 42 CON 2026 · EC identification no. EC26C3801KA5382781N · issued 20 Mar 2026 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Mar 2028 |
| Land conversion | 8 of 8 parcels converted | |
|---|---|---|
| Sy 47/1 | Converted 30 Jan 2019 · DC Office Bangalore Urban | |
| Sy 47/2A, 47/2B | Converted 13 Jan 2023 · DC Office Bangalore Urban | |
| Sy 47/3, 48/3 | Converted 13 Oct 2023 · DC Office Bangalore Urban | |
| Sy 48/4 | Converted 13 Oct 2023 · LCCP102438/2023 | |
| Sy 84/1C | Converted 13 Jan 2023 · LCCP102438/2023 | |
| Sy 48/5 | Converted 13 Jan 2023 · Varthur Bangalore Urban | |
| Survey numbers | 47/1 · 47/2A · 47/2B · 47/3 · 48/3 · 48/4 · 84/1C · 48/5 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
4BHK · avg 119 m² 41.4%3 BHK Classic · avg 100 m² 21.4%3 BHK Grand · avg 122 m² 21.4%3 BHK Smart · avg 104 m² 8.6%1BHK 7.1%
| 1BHK | 20 | 3,444 |
| 3 BHK Classic | 60 | 64,347 |
| 3 BHK Grand | 60 | 78,706 |
| 3 BHK Smart | 24 | 26,942 |
| 4BHK | 116 | 1,48,359 |
| Sold, Q2 2026-27 | 68 / 280 | |
|---|---|---|
| Unsold, Q2 2026-27 | 212 | |
| Months to sell, derived from filed bookings | 24 months |
| Reflections 66 | about 0.5 km | Locked | |
|---|---|---|---|
| Assetz 66 & Shibui | about 1 km | Locked | |
| Coevolve Misty Shores | about 1.5 km | Locked | |
| Axis Ekatva | about 1.5 km | Locked | |
| Vaswani Starlight | about 1.5 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2.5 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 3 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 3 km | Locked | |
| Inspira Infinity | about 3 km | Locked | |
| Poetry Of Earth | about 3.5 km | Locked | |
| Vintage Valley | about 4 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 4 km | Locked |
| Folium by Sumadhura Phase-IV This project | This project is the point the others are measured from | 31 Mar 2028 | 24% (68 of 280) | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | about 0.5 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Coevolve Misty Shores |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Nellurahalli |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Sheelavantana Lake |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 52% | |
| CCTV Surveillance, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.86 (520 covered spaces for 280 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 90% · planned by 31 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 16 Dec 2027 | |
| Completion | 45% | |
| Completion, accountant | 15.1% of the estimated cost spent |
| Schedule end | 31 Mar 2028 | |
|---|---|---|
| RERA completion date | 31 Mar 2028 | |
| Work began, as filed | 1 Dec 2025 |
| Building heights, fire NOC | filed: Wing - F (OAK) 59.95 m, Wing-G(ELM) 59.25 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 150 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/092/2026 · issued 4 Apr 2026 | |
| Environmental clearance | SEIAA 42 CON 2026 · EC identification no. EC26C3801KA5382781N · issued 20 Mar 2026 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹108.08 Cr 24.4%Development · ₹335.57 Cr 75.6%
| Estimated cost, at registration | ₹443.66 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹257.33 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹467.66 Cr | |
| Cost incurred | ₹70.79 Cr (15.1% of the Form 4 Q2 2026-27 estimate) | |
| Cost left | ₹396.86 Cr | |
| Receivable, sold flats | ₹44.50 Cr |
Sold (68) 24.3%Unsold (212) 75.7%
| Sold, Q4 2025-26 | 14 / 280 · 266 available | |
|---|---|---|
| Sold, Q1 2026-27 | 34 / 280 · 246 available | |
| Sold, Q2 2026-27 | 68 / 280 · 212 available | |
| Unsold, Q2 2026-27 | 212 | |
| Sold in Q1 2026-27 | 20 | |
| Sold in Q2 2026-27 | 34 | |
| Flats booked, Form 4 Q4 2025-26 | 14 |
| Escrow bank | ICICI Bank · Commissariat Road Bangalore | |
|---|---|---|
| Designated account, collected | ₹67.11 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹47.34 Cr in Q2 2026-27 (71% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹5,34,48,237 | |
| Share of collections deposited in escrow | 71.55% | |
| Sale proceeds realised, Q4 2025-26 | ₹8,21,34,376 |
| K-RERA registrations under this promoter | 18 | |
|---|---|---|
| Marked completed | 8 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 17 | |
| With a filed extension or completion | 8 (8 completed, 0 extended) | |
| Average schedule slip | 12 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1.5 km |
| 31 Dec 2029 |
| 2% (3 of 153) |
| Locked |
| Axis Ekatva | about 1.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Vaswani Starlight | about 1.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2.5 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Projects within 4 km, counted | 74 (74 with an approximate location) | |
|---|---|---|
| Flats in them | 20,718 | |
| Booked | 12,378 of 20,718 (60%) | |
| Unsold | 8,340 | |
| Booked a month, pooled | 324 flats | |
| Months to sell, pooled | 23 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | BWSSB, Local authority (Local Authority/BWSSB) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 2 km, Kadugodi | |
| Metro, under construction | about 4.5 km, ISRO |
| Kempegowda Airport | 38 | 26 |
| MG Road (CBD) | 17.5 | 15.5 |
| Manyata Tech Park | 20 | 16 |
| ITPL, Whitefield | 5 | 2 |
| Ecospace, Bellandur ORR | 10 | 8 |
| Electronic City Ph 1 | 25 | 16 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Prestige Tech Forest Substation on OpenStreetMap |