Building plan (BDA)Sanctioned 7 Jan 2026No. BDA/NM/AS/AA-5/TA-4/EAST/62/2025-26
RERA extensionsNone on the filingFiling read 31 Oct 2026
Land conversionConverted, 21 of 21 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Review3 to review · 1 clear
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedBorewell, BWSSB, OtherDeclared by the promoter
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion0%As of Q2 2026-27, promoter's return
Possession, agreement31 Dec 2030Agreement for sale, p. 20
StructureRCC framed structureAs specified
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Receivable, sold flats₹183.83 CrAs of Q2 2026-27
Cost left₹728.98 CrAs of Q2 2026-27
Sold71 / 396As of Q2 2026-27
Sold in Q2 2026-2771✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BDA)
Sanctioned 7 Jan 2026
Escrow bank
HDFC · Marathahalli Junction
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
354 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
Metro, operational9.5 kmNallur Halli
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Estimated cost, architect's and engineer's certificates
₹598.00 Cr
Estimated cost, Form 4 Q2 2026-27
₹778.00 Cr
Cost incurred
₹49.02 Cr (6.3% of the Form 4 Q2 2026-27 estimate)
Cost left
₹728.98 Cr
Receivable, sold flats
₹183.83 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (71) 17.9%Unsold (325) 82.1%
Sold per quarter
K-RERA inventory
Sold, Q4 2025-26
0 / 428 · 428 available
Sold, Q1 2026-27
0 / 526 · 526 available
Sold, Q2 2026-27
71 / 396 · 325 available
Unsold, Q2 2026-27
325
Sold in Q1 2026-27
0
Sold in Q2 2026-27
71
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · Marathahalli Junction
Designated account, collected
₹16.09 Cr in Q2 2026-27
Designated account, withdrawn
₹0 in Q2 2026-27 (0% of that quarter's deposits)
Not verified yet: Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB, Other
Nearest city water main
3.7 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.