Overview
Forest Province 2 @ Mana Skanda The Right Life
Part ofForest Province2 phases, 1,052 flats
Overview
Forest Province 2 @ Mana Skanda The Right Life
Part ofForest Province2 phases, 1,052 flats
Overview
Forest Province 2 @ Mana Skanda The Right Life
Part ofForest Province2 phases, 1,052 flats
Overview
Part ofForest Province2 phases, 1,052 flats
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Defect liability | 5 years |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 7 Jan 2026 | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road, Bangalore |
Data room
275 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 5 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | 1 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Forest Province 2 @ Mana Skanda The Right Life in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 7 Jan 2026 · No. BDA/NM/AS/AA-5/TA-4/EAST/62/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/475/2025 · issued 31 Dec 2025 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-350250 · issued 20 Aug 2025 · valid until 19 Aug 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2031 |
| Land conversion | 21 of 21 parcels converted | |
|---|---|---|
| Sy 38/2, 38/3, 38/4, 38/5, 39/7, 39/… | Converted 11 Feb 2025 · Deputy Commissioner | |
| Sy 40/2, 40/3, 40/4, 40/5, 40/6, 41/… | Converted 9 Jun 2025 · Deputy Commissioner | |
| Sy 41/1, 41/2, 41/5, 41/6 | Converted 4 Jul 2025 · Deputy Commissioner | |
| Sy 42/1, 42/2 | Converted 29 May 2025 · Deputy Commissioner | |
| Survey numbers | 38/2 · 38/3 · 38/4 · 38/5 · 39/7 · 39/8 · 39/9 · 39/10 · 40/2 · 40/3 · 40/4 · 40/5 · 40/6 · 41/1 · 41/2 · 41/3 · 41/4 · 41/5 · 41/6 · 42/1 · 42/2 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK + study · avg 132 m² 30.6%4 BHK Smart · avg 149 m² 24.9%3 BHK Smart · avg 114 m² 18.3%4BHK large · avg 164 m² 12.5%2 other types 13.7%
| 2BHK + study | 8 | 9,182 |
| 3BHK | 64 | 71,225 |
| 3BHK + study | 161 | 2,28,001 |
| 3 BHK Smart | 96 | 1,17,370 |
| 4BHK large | 66 | 1,16,196 |
| 4 BHK Smart | 131 | 2,09,520 |
| Sold, Q2 2026-27 | 7 / 526 | |
|---|---|---|
| Unsold, Q2 2026-27 | 519 | |
| Months to sell, derived from filed bookings | 445 months |
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Engrace 3, price locked; Engrace 4, price locked.
| Nambiar District 25 Phase 2 | about 2 km | Locked | |
|---|---|---|---|
| Orion Heights | about 3 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 3 km | Locked | |
| Engrace 3 | 3.5 km | Locked |
| Forest Province 2 @ Mana Skanda The Right Life This project | This project is the point the others are measured from | 30 Jun 2031 | 1% (7 of 526) | Not verified yet |
|---|---|---|---|---|
| Nambiar District 25 Phase 2 | about 2 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
| Orion Heights | about 3 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 440 m from the filed location | Clear |
| Nearest government-flagged flood location | 3.5 km, Gunjur |
| Nearest storm drain | 2.4 km to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 480 m to the south-east, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.82 (959 covered spaces for 526 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 5 Sep 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 2 Apr 2030 | |
| Club house | Not started | |
| Completion | 0% | |
| Completion, accountant | 5.7% of the estimated cost spent |
| Possession, agreement | 30 Jun 2031 | |
|---|---|---|
| Schedule end | 30 Jun 2031 | |
| RERA completion date | 30 Jun 2031 | |
| Work began, as filed | 1 Nov 2026 |
| Structure | RCC framed structure | |
|---|---|---|
| Building heights, fire NOC | 102.5 m filed, 4 towers |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Wiring | Concealed fire-resistant copper wiring | |
| Power backup | Provided, 36.24 sq m |
| Structural engineer, quarterly | Form 6 · Jul 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/475/2025 · issued 31 Dec 2025 | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jul 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 20 Feb 2026 · site inspected 20 Feb 2026 | |
| Engineer's certificate, registration | Dated 20 Feb 2026 | |
| Chartered accountant, Form 4 | Dated 10 Oct 2026 | |
| Architect's quarterly progress certificate dated | 10 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 8 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹57.92 Cr 7.3%Development · ₹740.00 Cr 92.7%
| Estimated cost, at registration | ₹797.92 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹598.00 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹778.00 Cr | |
| Cost incurred | ₹44.41 Cr (5.7% of the Form 4 Q2 2026-27 estimate) | |
| Cost left | ₹733.59 Cr | |
| Receivable, sold flats | ₹17.42 Cr |
Sold (7) 1.3%Unsold (519) 98.7%
| Sold, Q4 2025-26 | 0 / 526 · 526 available | |
|---|---|---|
| Sold, Q1 2026-27 | 0 / 526 · 526 available | |
| Sold, Q2 2026-27 | 7 / 526 · 519 available | |
| Unsold, Q2 2026-27 | 519 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹65.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹45,53,084 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q2 2026-27 | ₹65,04,405 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Engrace 4 | 3.6 km | Locked |
|---|
| Engrace Vista | about 3.5 km | Locked |
|---|
| Jeevan's Allure | about 4.5 km | Locked |
|---|
| Coevolve Florenza | 4.3 km | Locked |
|---|
| Mana Jardin Neo | 4.4 km | Locked |
|---|
| Adarsh Park Heights Phase-2 | about 4.5 km | Locked |
|---|
| Suyug's Saffron | 4.5 km | Locked |
|---|
| 63 Degree East - Tower E | 4.7 km | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes |
|---|
| about 3 km |
| 30 Apr 2027 |
| 39% (89 of 226) |
| Locked |
| Engrace 3 | 3.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Engrace 4 | 3.6 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Engrace Vista | about 3.5 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Rent, 1BHK, 3 km | ₹15,000 /mo · 9 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹24.8 /mo, as listed · 10 listings with a size |
| Projects within 4 km, counted | 71 (37 with an approximate location) | |
|---|---|---|
| Flats in them | 28,440 | |
| Booked | 14,250 of 28,440 (50%) | |
| Unsold | 14,190 | |
| Booked a month, pooled | 421 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB, Other | |
| Nearest city water main | 3.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.4 km to the north, secondary drain | |
|---|---|---|
| Ground level | 905 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.6 km, Nallur Halli | |
| Metro, under construction | 7.8 km, Kadubeesanahalli |
| Kempegowda Airport | 46.3 | 45 | 34.2 |
| MG Road (CBD) | 23.3 | 27 | 18.4 |
| Manyata Tech Park | 27.4 | 32 | 21.8 |
| ITPL, Whitefield | 13.0 | 14 | 10.3 |
| Ecospace, Bellandur ORR | 12.0 | 17 | 8.2 |
| Electronic City Ph 1 | 16.5 | 23 | 9.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the west, named Domasandra Substation on OpenStreetMap |