Building plan (Anekal Planning Authority)Sanctioned 14 Jun 2024No. APA/LAO/96/2023-24
RERA extensionsNone on the filingFiling read 20 Oct 2026
Land conversionConverted 2 Feb 2024Deputy Comissioner Bangalore
Permits
Approval letters
Building plan (Anekal Planning Authority)
Sanctioned 14 Jun 2024 · No. APA/LAO/96/2023-24
Power NOC
Filed with the registration
SEIAA
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreementNot verified yet
Forfeiture, allotment letter•• %
Transfer feeNot verified yet
Maintenance included•••••
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
The area
Unsold stock nearby
Months to sell unsold stock
Location & risks
What is the location like?
Review1 to review · 1 clear
Groundwater, taluk average21.3 m below groundAnekal taluk, July 2023
Water supply, as filedOtherDeclared by the promoter
Metro, operational
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion100%As of Q4 2025-26, promoter's return
Possession, agreement16 May 2025Filed document, p. 11
Progress
Site photos filed with K-RERA, Q4 2025-26
Developer
Can the developer deliver?
Funding
Estimated cost
Land · ₹6.46 Cr 56.9%Development · ₹4.90 Cr 43.1%
Form 4
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan
Sanctioned 14 Jun 2024
Escrow bank
Karnataka Bank Ltd. · HSR Layout
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
175 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
Good villas in a nice and peaceful location. The property is well planned and offers good value for the price. The team was very professional, friendly, and helpful throughout. Overall, a great experience and definitely worth considering!
NNarayan Prabhu30 Sep 2026★★★★★
Excellent location ,surrounded by greenery Ready clubhouse Perfect home
NNITHIN R BHARADWAJ30 Jun 2026★★★★★
Best Villa ever with love of Nature and Solar Powered electricity ⚡️ and smart street lites.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Future Aviana in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
KSPCB
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2029
Registration certificates
PRM/KA/RERA/1251/308/PR/270326/008554
Land use
Conversion order
Land conversion
Converted 2 Feb 2024 · Deputy Comissioner Bangalore
Survey numbers
6/1 · 6/2 · 6/3 · 6/4
Not verified yet: Validity, Fire NOC, Airport height NOC.
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
K-RERA inventory
Projects within 4 km, counted
5 (5 with an approximate location)
Plots in them
739
Booked
197 of 739 (27%)
Unsold
542
Booked a month, pooled
10 plots
Months to sell, pooled
55 months
Not verified yet: Recent price, plot area; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, plot area; Form 4 certified totals; Agreements in the Form 4 sold list; Plot area vs rest, by type; Unit mix filed; Unit types; K-RERA inventory; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Plot price, plotted layouts within 4 km; Filed prices nearby; Nearest 12 with filed prices; This project vs the nearest with filed prices; Median rent, 3 km; Rents and yields.
7.6 kmBommasandra
The site
Zoning & hazards
Power lines and drains
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Not verified yet: Structure; Structural safety certificate; Completion, architect; By component; Internal roads; Club house; Schedule end; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Design consultants (Form 6); Fire safety; Environmental clearance.
Not verified yet: Receivable, sold plots; Cost left; Sold; Sold in the latest quarter; Cost left vs buyer dues; Collected from buyers; Land cost revision; Sold vs unsold; Sold per quarter; K-RERA inventory; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q4 2025-26
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Other
Nearest city water main
10.3 km
!Review
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.