Overview
1 Lakh Multi Storey Bengaluru Housing Programme
Overview
1 Lakh Multi Storey Bengaluru Housing Programme
Overview
1 Lakh Multi Storey Bengaluru Housing Programme
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | KSFES/NOC/072/2020 · issued 15 Sep 2020 | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | NOC ID HOSU/SOUTH/B/090320/479569 · permissible top elevation 983 m above mean sea level | |
| KSPCB | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹88.08 Cr |
|---|
Loan & collateral
| Escrow bank | Canara Bank · BANGALORE SPLSD GOVT BUSINESS BRANCH 6349 |
|---|
Data room
67 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aashrithaa Divine Phase IIIApplied for completion 12/10/2026 | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aashrithaa DivineCompleted (regulator flag) | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | – | Completed |
| Aiikya ForestscapeActive · 28% built | Swagatham Constructions Private Limited | Rowhouse | 323–980 sqft carpet (as filed) | Sep 2028 |
| Akruthi Green WoodsLapsed · completion date passed | BSR DEVELOPERS | Plot | – | Jan 2021 |
| Aratt AmoraCompleted · OC 09-06-2017 | ARATTUKULAM DEVELOPERS LLP | Apartment | 1,815 sqft carpet (as filed) | Completed |
| Aratt Amora Park ViewFiled as completed · no completion certificate on record | Aratt (Aashrayaa) | Villa | 1,770–2,015 sqft | – |
| Aratt Grand TownCompleted (regulator flag) | ARATT GRAND TOWN | Plot | – | Completed |
| Aratt Rolling Whites - PlotsCompleted (regulator flag) | ARATT ROLLING WHITES | Plot | – | Completed |
8 of 52 other projects in Jigani, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open 1 Lakh Multi Storey Bengaluru Housing Programme in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 19,020 sq m |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 7 Mar 2024 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Aiikya Forestscape | about 4 km | Locked | |
|---|---|---|---|
| Abhee Serenity Springs | 4.7 km | Locked | |
| Columbia Aaltius | about 7 km, to a locality centre | Locked | |
| Vasuki Vallabha | 7.4 km | Locked | |
| Shriram Sapphire (Codename Ultimate) | 7.5 km | Locked | |
| Ramky One Karnival | 7.6 km | Locked | |
| Signature Heights | about 8 km | Locked | |
| Sowmya Skyla | about 8 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 8.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 8.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 8.5 km | Locked | |
| SOBHA Townpark | 8.6 km | Locked |
| 1 Lakh Multi Storey Bengaluru Housing Programme This project | This project is the point the others are measured from | 7 Mar 2024 | – | Not verified yet |
|---|---|---|---|---|
| Aiikya Forestscape | about 4 km | 30 Sep 2028 | 34% (121 of 360) | Locked |
| Abhee Serenity Springs | 4.7 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
| Columbia Aaltius | about 7 km, to a locality centre | 30 Sep 2026 | 54% (89 of 165) | Locked |
| Vasuki Vallabha | 7.4 km | 31 Dec 2027 | 31% (10 of 32) | Locked |
| Shriram Sapphire (Codename Ultimate) | 7.5 km | 5 Nov 2028 | 100% (414 of 414) | Locked |
| Ramky One Karnival | 7.6 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
| Projects within 4 km, counted | 7 (7 with an approximate location) | |
|---|---|---|
| Flats in them | 1,057 | |
| Booked | 373 of 1,057 (35%) | |
| Unsold | 684 | |
| Booked a month, pooled | 7 flats | |
| Months to sell, pooled | 98 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 12.5 km, SUBASH NAGARA |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the east, an unnamed pond |
| RERA completion date | 7 Mar 2024 | Red flag |
|---|---|---|
| Work began, as filed | 7 Mar 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | KSFES/NOC/072/2020 · issued 15 Sep 2020 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | Canara Bank · BANGALORE SPLSD GOVT BUSINESS BRANCH 6349 |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 9.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 910 m above sea level, plus or minus 4 m | |
| Metro, operational | 6.9 km, Bommasandra | |
| Metro, under construction | 14.8 km, Kalena Agrahara |
| Kempegowda Airport | 65.0 | 70 | 48.9 |
| MG Road (CBD) | 31.9 | 36 | 25.1 |
| Manyata Tech Park | 40.9 | 48 | 32.1 |
| ITPL, Whitefield | 34.8 | 41 | 26.1 |
| Ecospace, Bellandur ORR | 30.0 | 37 | 18.4 |
| Electronic City Ph 1 | 14.3 | 18 | 8.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.3 km to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |