Worst builder ever, they promise many things when you visit but after that just excuses. They will not even refund your money and will try different tactics to shift the blame
AAlbin Alex16 Apr 2025★★★★★
Visited the site today, got to say they have used the space best way possible, and none of the apartment have a common wall. Plenty of amenities. Even though if you think 1150 sqft is small but after visiting and seeing the way they've used…
Ssharath Kumar20 Jul 2024★★★★★
Visited project and it looks good with area wise, ammenties wise, quality wise. It's located in prime gated community, best thing is there is lot of open space and surrounded with many trees. Bulider has good reputation as well based on old…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sowmya Skyla in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (Local Planning Authority)
Sanctioned 14 Aug 2023 · No. 33/75
Power NOC
Filed with the registration
Fire department
Filed with the registration
SEIAA
Filed with the registration
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-123990 · issued 1 Jul 2023 · valid until 26 Jun 2028
✓Clear
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2026
Registration certificates
PRM/KA/RERA/1251/308/PR/220324/006727
Land use
Conversion order
Land conversion
Converted 2 Apr 2016 · Deputy Commissioner, Bangalore District
Survey numbers
1
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Form 4 certified totals
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Agreements in the Form 4 sold list
Not verified yet
Unit sizes
Carpet vs rest, by type
Not verified yet
Unit mix filed
Unit types
•• of ••
₹ ••,•••
•• %
•• ••• ••••
•••••
Floor plans, brochure
Not verified yet
Unsold stock
K-RERA inventory
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Registered deeds
Transactions in this project
Not verified yet
The area
Price trend
South Bengaluru, past yearNot verified yet
Bengaluru, past yearNot verified yet
South Bengaluru since 2022Not verified yet
This project vs South BengaluruNot verified yet
Price per sq ft, super built-up
Not verified yet
By quarter
Not verified yet
Registered sales around
Registered sale price per sq ft, by year
Not verified yet
Transactions around this project
Not verified yet
Comparable projects
Carpet price, projects within 4 km
•• %
•• %
•• %
•• %
•• %
Filed prices nearby
Not verified yet
Nearest 12 with filed prices
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Nearest projects
This project vs the nearest with filed prices
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Rent & yield
Median rent, 3 km
Not verified yet
Gross yield
Not verified yet
Rents and yields
Not verified yet
Unsold stock nearby
Months to sell unsold stock
•• %
•• %
•• %
•• %
•• %
K-RERA inventory
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6); Fire safety; Environmental clearance.
Land · ₹5.20 Cr 16.4%Development · ₹26.47 Cr 83.6%
Form 4
Estimated cost, at registration
₹31.67 Cr
Estimated cost, architect's and engineer's certificates
₹26.47 Cr
Cost incurred
₹21.62 Cr (68.2% of the estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (13) 19.1%Unsold (55) 80.9%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
11 / 68 · 57 available
Sold, Q4 2025-26
11 / 68 · 57 available
Sold, Q1 2026-27
11 / 68 · 57 available
Sold, Q2 2026-27
13 / 68 · 55 available
Unsold, Q2 2026-27
55
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
2
Flats booked, Form 4 Q2 2026-27
13
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · HOODI
Designated account, collected
₹28.4 L in Q2 2026-27
Designated account, withdrawn
₹28.4 L in Q2 2026-27 (100% of that quarter's deposits)
Amount withdrawable, Form 4
₹14,64,94,364
Net amount withdrawable, Form 4
₹9,25,07,621
Share of collections deposited in escrow
70%
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
0
60
80
100
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Local authority (Local Water Body)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot