Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Legacy in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (Local Planning Authority)
Sanctioned 30 May 2024 · No. APA/CC/1455/2023-24
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/077/2024 · issued 7 May 2024 · building height 23.95 m
✓Clear
Environmental clearance
Filed with the registration
Airport height NOC
NOC ID HOSU/SOUTH/B/020524/907777 · issued 23 Feb 2024 · valid until 22 Feb 2032
✓Clear
Pollution board (CFE)
consent order CTE-126627 · issued 5 Mar 2024 · valid until 4 Mar 2029
✓Clear
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 May 2028
Registration certificates
PRM/KA/RERA/1251/308/PR/281024/007180
Land use
Conversion order
Land conversion
2 of 2 parcels converted
Sy Sy No - 16/1
Converted 15 Jun 2023 · Deputy Commissioner Bangalore District
Sy Sy No -16/4
Converted 24 Aug 2023 · Deputy Commissioner Bnagalore District
Survey numbers
Sy No - 16/1 · Sy No -16/4
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
50%
Unit types
Type
Flats
Carpet per flat, average (sq ft)
2BHK
28
691
3BHK
28
958
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Sold, Q2 2026-27
39 / 56
Unsold, Q2 2026-27
17
Months to sell, derived from filed bookings
Too few bookings to project (2 flats booked in 9 months)
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹1.61 Cr 7%Development · ₹21.47 Cr 93%
Form 4
Estimated cost, at registration
₹23.07 Cr
Estimated cost, architect's and engineer's certificates
₹17.93 Cr
Estimated cost, Form 4 Q2 2026-27
₹23.07 Cr
Cost incurred
₹20.05 Cr (86.9% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (39) 69.6%Unsold (17) 30.4%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
37 / 56 · 19 available
Sold, Q4 2025-26
37 / 56 · 19 available
Sold, Q1 2026-27
38 / 56 · 18 available
Sold, Q2 2026-27
39 / 56 · 17 available
Unsold, Q2 2026-27
17
Sold in Q4 2025-26
0
Sold in Q1 2026-27
1
Sold in Q2 2026-27
1
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
STATE BANK OF INDIA · 1st Sector HSR layout
Designated account, collected
₹94.4 L in Q2 2026-27
Designated account, withdrawn
₹82.1 L in Q2 2026-27 (87% of that quarter's deposits)
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Anekal taluk average, July 2023: 21.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class
Through the year
January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several)
Water supply, as filed
Local authority (ANEKAL)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro line (dashed: planned)
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot