Overview
Godrej Air Nxt
Overview
Godrej Air Nxt
Overview
Godrej Air Nxt
Overview
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹30.81 Cr 29.7%Development · ₹72.99 Cr
Loan & collateral
| Escrow bank | HDFC · Manekji Wadia Building |
|---|
Data room
79 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Godrej Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Air Nxt in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC (1 of 2) | KSFES/NOC/1511/2018 | Clear |
| Fire NOC (2 of 2) | KSFES/NOC/1511/2018 | Clear |
| Environmental clearance | issued 30 Jan 2019 | Clear |
| Airport height NOC | NOC ID BANG/SOUTH/B/110416/180146 · issued 15 Nov 2016 · permissible top elevation 957.26 m above mean sea level · validity ended 14 Nov 2021 | |
| Pollution board (CFE) | consent order W-335645 · issued 20 Jan 2023 | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Apr 2024 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: 2g Tula, price locked; Garuda Grand, price locked.
| 2g Tula | 1.4 km | Locked | |
|---|---|---|---|
| Garuda Grand | 1.8 km | Locked | |
| Vaswani Starlight | about 3 km | Locked | |
| Coevolve Misty Shores | about 3 km | Locked | |
| Axis Ekatva | about 3.5 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked | |
| Reflections 66 | 4.1 km | Locked | |
| Godrej Splendour | 4.3 km | Locked | |
| Assetz 66 & Shibui | about 4.5 km | Locked | |
| Godrej Splendour Phase II | about 4.5 km | Locked | |
| Nirmaanika Aria | about 5.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | 5.5 km | Locked |
| Godrej Air Nxt This project | This project is the point the others are measured from | 30 Apr 2024 | – | Not verified yet |
|---|---|---|---|---|
| 2g Tula | 1.4 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Garuda Grand | 1.8 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Vaswani Starlight | about 3 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Coevolve Misty Shores | about 3 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Axis Ekatva | about 3.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 12 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹63,000 /mo · 173 listings | |
| Rent, 2BHK, 3 km | ₹37,000 /mo · 225 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 150 listings | |
| Rent per sq ft, 3 km | ₹36.1 /mo, as listed · 240 listings with a size |
| Projects within 4 km, counted | 52 (27 with an approximate location) | |
|---|---|---|
| Flats in them | 12,789 | |
| Booked | 6,515 of 12,789 (51%) | |
| Unsold | 6,274 | |
| Booked a month, pooled | 115 flats | |
| Months to sell, pooled | 55 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 60 m from the filed location | Clear |
| Nearest government-flagged flood location | 740 m, GARUDACHARPLAYA BASAVANAGARA |
| Nearest storm drain | 90 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 230 m to the south-east, Seetharamapalya Lake |
| Completed, occupancy certificate 3 Feb 2023 |
| Schedule end | 30 Sep 2022 | |
|---|---|---|
| RERA completion date | 30 Apr 2024 | |
| Work began, as filed | 1 Jul 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety (1 of 2) | KSFES/NOC/1511/2018 | |
|---|---|---|
| Fire safety (2 of 2) | KSFES/NOC/1511/2018 | |
| Environmental clearance | issued 30 Jan 2019 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹103.80 Cr |
|---|
Sold (109) 100%
| Flats sold, at completion | 109 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 109 |
| Escrow bank | HDFC · Manekji Wadia Building |
|---|
| K-RERA registrations under this promoter | 16 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 510 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 90 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 900 m above sea level, plus or minus 4 m | |
| Metro, operational | 260 m, Hoodi Junction | |
| Metro, under construction | 2.1 km, Doddanekundi |
| Kempegowda Airport | 38.9 | 40 | 23.6 |
| MG Road (CBD) | 15.4 | 19 | 12.2 |
| Manyata Tech Park | 14.9 | 21 | 11.9 |
| ITPL, Whitefield | 6.9 | 9 | 2.6 |
| Ecospace, Bellandur ORR | 9.9 | 17 | 7.7 |
| Electronic City Ph 1 | 24.3 | 34 | 16.9 |
| Landfill or waste transfer station | 2.2 km to the south | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the south-east, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 2.7 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 640 m to the north, named Hoodi Substation on OpenStreetMap |