Building plan (BBMP)Sanctioned 4 Jun 2025No. BBMP/Addl.Dir/JDSOUTH/0027/24-25
RERA extensionsNone on the filingFiling read 5 Nov 2026
Land conversionNot convertedAs declared on the filing
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
3BHK · avg 124 m²
Location & risks
What is the location like?
Clear1 clear
Groundwater, taluk average22.7 m below groundBengaluru North taluk, July 2023
Water supply, as filedBorewell, BWSSBDeclared by the promoter
Metro, operational
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion26%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Review1 to review · 1 clear
Sold338 / 346✓ClearClear
Sold in Q2 2026-276 bookings cancelled or corrected (344 → 338 sold)!ReviewReview
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BBMP)
Sanctioned 4 Jun 2025
Escrow bank
Axis Bank · M G Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
129 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Got to hear this land was allocated by Government decades back only for Industrial Area and not for residential building purpose, hence no residential buildings can be constructed. Please make sure to check the land allocation of this area…
IImraan Shiekh13 Sep 2025★★★★★
Connectivity from Tiara to Mysore highway Road, towards Mumbai highway road, towards Hyderabad highway road and towards Hosur Road is seamless, Tiara is kind of Junction and adding top of cake is metro station nearby 100 metre, ksrtc, Bmtc…
KKartik Sonti20 Jul 2025★★★★★
Corner project near metro. It is well connected to nearby infrastructure (malls, hospitals etc), however area is very congested. Kitchen is small. Pricing is quite high. Amenities seem top notch.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Tiara in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 4 Jun 2025 · No. BBMP/Addl.Dir/JDSOUTH/0027/24-25
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/239/2024 · issued 5 Jul 2024
✓Clear
Environmental clearance
SEIAA 66 CON 2024 · EC identification no. EC24C3801KA5256771N · issued 29 Aug 2024
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-345756 · issued 29 Oct 2024 · valid until 28 Oct 2029
✓Clear
Water and sewerage NOC (BWSSB)
issued 25 Oct 2024
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 May 2030
Registration certificates
PRM/KA/RERA/1251/309/PR/110625/007817
Land use
Conversion order
Land conversion
Declared not converted
Survey numbers
038-M0002-149 (Plots no 8 and · 11-50-4/5/6 (Plot no 4,5 and 6 · 11-50-7/12 (Plot no 7 and 12)
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; West Bengaluru, past year; Bengaluru, past year; West Bengaluru since 2022; This project vs West Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Bengaluru median yield.
360 mGoraguntepalya
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Land · ₹305.36 Cr 30.5%Development · ₹694.93 Cr 69.5%
Form 4
Estimated cost, at registration
₹1000.29 Cr
Estimated cost, architect's and engineer's certificates
₹481.47 Cr
Estimated cost, Form 4 Q2 2026-27
₹958.25 Cr
Cost incurred
₹437.22 Cr (45.6% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (338) 97.7%Unsold (8) 2.3%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
344 / 346 · 2 available
Sold, Q4 2025-26
344 / 346 · 2 available
Sold, Q1 2026-27
344 / 346 · 2 available
Sold, Q2 2026-27
338 / 346 · 8 available
Unsold, Q2 2026-27
8
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
6 bookings cancelled or corrected (344 → 338 sold)
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Axis Bank · M G Road
Designated account, collected
₹61.55 Cr in Q2 2026-27
Designated account, withdrawn
₹118.32 Cr in Q2 2026-27
Track record
DOSL builder track
K-RERA registrations under this promoter
25
Marked completed
4
Past promised date, not completed
2
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip.
Site photos, Q1 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Bengaluru North taluk average, July 2023: 22.7 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class
Through the year
January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several)
Water supply, as filed
Borewell, BWSSB
Nearest city water main
70 m
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.