Overview
Golden Grand
Overview
Golden Grand
Overview
Golden Grand
Overview
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) | Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Golden Grand in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Royal Enclave | about 2 km | Locked | |
|---|---|---|---|
| Renaissance Srichakra | about 3 km | Locked | |
| Vista Padmalaya | about 3.5 km | Locked | |
| Sri Rama Enclave | about 5 km | Locked | |
| Birla Tisya | 4.9 km | Locked | |
| Vruksha Greens | 5.6 km | Locked | |
| Magnolia Delight | about 6 km | Locked | |
| Rubby Castle 1 | about 6 km | Locked | |
| Assetz Soho & Sky | 7.3 km | Locked | |
| Cumins Sanctum | about 8 km | Locked | |
| Shriram Solitaire | about 8.5 km | Locked | |
| Vista Svara | about 8.5 km | Locked |
| Golden Grand This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Royal Enclave | about 2 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Renaissance Srichakra | about 3 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Vista Padmalaya | about 3.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Sri Rama Enclave | about 5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Birla Tisya | 4.9 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Vruksha Greens | 5.6 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Rent, 3BHK, 3 km | ₹44,200 /mo · 23 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 29 listings | |
| Rent, 1BHK, 3 km | ₹14,000 /mo · 25 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 45 listings with a size |
| Projects within 4 km, counted | 6 (4 with an approximate location) | |
|---|---|---|
| Flats in them | 720 | |
| Booked | 546 of 720 (76%) | |
| Unsold | 174 | |
| Booked a month, pooled | 9 flats | |
| Months to sell, pooled | 20 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech) | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 580 m from the site | Clear |
| Nearest government-flagged flood location | 520 m, Yeshwanthpur Railway station |
| Nearest storm drain | 30 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 440 m to the north, an unnamed tank |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Nearest city water main | 60 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 30 m to the west, tertiary drain | |
|---|---|---|
| Ground level | 913 m above sea level, plus or minus 4 m | |
| Metro, operational | 530 m, Yeshwantpur | |
| Metro, under construction | 5.3 km, Hebbal |
| Kempegowda Airport | 35.3 | 39 | 25.7 |
| MG Road (CBD) | 11.5 | 14 | 8.2 |
| Manyata Tech Park | 12.6 | 18 | 8.1 |
| ITPL, Whitefield | 26.1 | 31 | 21.0 |
| Ecospace, Bellandur ORR | 25.1 | 32 | 18.3 |
| Electronic City Ph 1 | 29.4 | 36 | 25.2 |
| Landfill or waste transfer station | 2.1 km to the south-east | |
|---|---|---|
| Sewage treatment plant | 1.3 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | 1.9 km to the west | |
| Prison | None within 3 km | |
| Electrical substation | 1.5 km to the west |