Overview
Green Avenue
Overview
Green Avenue
Overview
Green Avenue
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Aavya HomesActive · 70% built | SON INFRA ENTERPRISES | Apartment | 731–886 sqft carpet (as filed) | Dec 2028 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Projects within 4 km, counted | 1 (1 with an approximate location) |
|---|
Location & risks
Construction & progress
Developer
Land · ₹10.00 Cr 50%Development · ₹10.00 Cr 50%
Loan & collateral
| Escrow bank | Axis Bank · Anekal |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green Avenue in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Land area of this registration | 41,126 sq m |
|---|
| RERA extensions |
|---|
| None on the filing |
| RERA completion date | 30 Sep 2022 |
|---|
| Plots in them | 80 |
|---|
| Booked | 6 of 80 (8%) |
|---|
| Unsold | 74 |
|---|
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 21.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |
| RERA completion date | 30 Sep 2022 | |
|---|---|---|
| Work began, as filed | 20 Jul 2019 |
| Estimated cost, at registration | ₹20.00 Cr |
|---|
| Escrow bank | Axis Bank · Anekal |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 15 km, Bommasandra | |
| Metro, under construction | about 24.5 km, Kalena Agrahara |
| Kempegowda Airport | 56.5 |
| MG Road (CBD) | 34.5 |
| Manyata Tech Park | 41 |
| ITPL, Whitefield | 33 |
| Ecospace, Bellandur ORR | 26.5 |
| Electronic City Ph 1 | 17.5 |