Overview
Green City
Overview
Green City
Overview
Green City
Overview
Photo: Dhamodaran STitle & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 23 Oct 2021 · No. LAO:74:2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹55.0 L 55%Development · ₹45.0 L 45%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 23 Oct 2021 | |
| Escrow bank | Axis Bank · Bommasandra |
Data room
109 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limlted | Apartment | 378 sqft carpet (as filed) | Mar 2024 |
| Aashrithaa Divine Phase IIIApplied for completion 12/10/2026 | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aashrithaa DivineCompleted (regulator flag) | AASHRITHAA PROPERTIES PRIVATE LIMITED | Plot | – | Completed |
| Aiikya ForestscapeActive · 28% built | Swagatham Constructions Private Limited | Rowhouse | 323–980 sqft carpet (as filed) | Sep 2028 |
| Akruthi Green WoodsLapsed · completion date passed | BSR DEVELOPERS | Plot | – | Jan 2021 |
| Aratt AmoraCompleted · OC 09-06-2017 | ARATTUKULAM DEVELOPERS LLP | Apartment | 1,815 sqft carpet (as filed) | Completed |
| Aratt Amora Park ViewFiled as completed · no completion certificate on record | Aratt (Aashrayaa) | Villa | 1,770–2,015 sqft | – |
| Aratt Grand TownCompleted (regulator flag) | ARATT GRAND TOWN | Plot | – | Completed |
8 of 52 other projects in Jigani, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green City in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2023 |
| Land conversion | Converted 9 Apr 2010 · special deputy commissioner | |
|---|---|---|
| Survey numbers | 110/1B |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 10 (9 with an approximate location) | |
|---|---|---|
| Plots in them | 1,187 | |
| Booked | 475 of 1,187 (40%) | |
| Unsold | 712 | |
| Booked a month, pooled | 7 plots | |
| Months to sell, pooled | 102 months |
| Zoning, RMP 2015 | 93% Residential (main), 7% Parks & open space | Review |
|---|---|---|
| Government land in the filed surveys | Not found |
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
| RERA completion date | 30 Jun 2023 | Red flag |
|---|---|---|
| Work began, as filed | 1 Sep 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹1.00 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹30.0 L |
| Escrow bank | Axis Bank · Bommasandra |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Ground level | 905 m above sea level, plus or minus 4 m |
|---|
| Kempegowda Airport | 65.2 | 70 | 48.8 |
| MG Road (CBD) | 32.1 | 36 | 25.0 |
| Manyata Tech Park | 41.1 | 48 | 32.0 |
| ITPL, Whitefield | 35.0 | 41 | 26.0 |
| Ecospace, Bellandur ORR | 30.2 | 38 | 18.3 |
| Electronic City Ph 1 | 14.4 | 18 | 8.7 |