Title & ownership
Approvals
| Building plan (BDA) | Sanctioned 22 Jul 2022 · No. BDA/NM/AS/AA-1/TA-4/East/19/2022 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
flats · avg 86 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹20.66 Cr 31%Development · ₹45.94 Cr 69%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 22 Jul 2022 | |
| Escrow bank | HDFC · MAHADEVAPURA |
Data room
113 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green Edge Casero in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA |
|---|
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 17 Apr 2017 · DISTRICT COMMISSIONER | |
|---|---|---|
| Survey numbers | 87/4 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| flats | 117 | 926 |
| Nirmaanika Aria | about 1 km | Locked | |
|---|---|---|---|
| Godrej Splendour Phase II | about 2 km | Locked | |
| Godrej Splendour | about 2 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 2.5 km | Locked | |
| Sowparnika Euphoria in the East | about 3 km | Locked | |
| Vintage Valley | about 3 km | Locked | |
| Kumari Nautilus | about 3.5 km | Locked | |
| Godrej Woodscapes | about 4 km | Locked | |
| Axis Ekatva | about 4.5 km | Locked | |
| Sowparnika Rhythm of Rain | about 4.5 km | Locked | |
| Sattva Songbird | about 4.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 4.5 km | Locked |
| Green Edge Casero This project | This project is the point the others are measured from | 31 Dec 2026 | – | Not verified yet |
|---|---|---|---|---|
| Nirmaanika Aria | about 1 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
| Godrej Splendour Phase II | about 2 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
| Godrej Splendour |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, PATTALAMMA LAYOUT NEAR KADUGODI |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.32 (38 covered spaces for 117 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 12 Dec 2026 | |
|---|---|---|
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Jun 2022 |
| Building heights, fire NOC | 36 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 24.75 sq m |
|---|
| Fire safety | Filed with the registration |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹66.60 Cr |
|---|
| Escrow bank | HDFC · MAHADEVAPURA |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2 km |
| 20 Mar 2027 |
| 98% (1,135 of 1,161) |
| Locked |
| Assetz Bloom & Dell - Phase 2 | about 2.5 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
|---|
| Sowparnika Euphoria in the East | about 3 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Vintage Valley | about 3 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Projects within 4 km, counted | 50 (50 with an approximate location) | |
|---|---|---|
| Flats in them | 21,415 | |
| Booked | 12,405 of 21,415 (58%) | |
| Unsold | 9,010 | |
| Booked a month, pooled | 133 flats | |
| Months to sell, pooled | 59 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Seegehalli Panchayath Development) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 2 km, Whitefield | |
| Metro, under construction | about 8.5 km, Doddanekundi |
| Kempegowda Airport | 32 | 21.5 |
| MG Road (CBD) | 24 | 18 |
| Manyata Tech Park | 23.5 | 16 |
| ITPL, Whitefield | 6 | 4 |
| Ecospace, Bellandur ORR | 16.5 | 13 |
| Electronic City Ph 1 | 30 | 21.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the south-east, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |