Overview
Hanging Gardens
Overview
Hanging Gardens
Overview
Hanging Gardens
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹38.90 Cr 27%Development · ₹105.00 Cr 73%
Loan & collateral
| Escrow bank | HDFC · Koramangala |
|---|
Data room
49 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 55 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Hanging Gardens in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 10,926 sq m | |
|---|---|---|
| Title deed | Sy 77/2, Kasaba hobli · 2 Acres 28 Guntas |
| RERA extensions | Applied for · Applied 28 Mar 2022 | |
|---|---|---|
| RERA completion date | 30 Mar 2021 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Mirabelle, price locked; Sumadhura Solea, price locked; Sumadhura Epitome, price locked; Assetz Soho & Sky Phase 1b, price locked; Assetz Soho & Sky, price locked.
| Lodha Mirabelle | 1.6 km | Locked | |
|---|---|---|---|
| Mirabelle Phase 2 | about 1.5 km | Locked | |
| Magnolia Delight | about 2.5 km | Locked | |
| Brr North Excellency Phase I | about 3 km | Locked | |
| Sumadhura Solea | 3.0 km | Locked | |
| Sumadhura Epitome | 3.1 km | Locked | |
| Cumins Sanctum | about 3.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | 3.5 km | Locked | |
| Assetz Soho & Sky | 3.6 km | Locked | |
| Vkk Grand | 4.1 km | Locked | |
| Sobha City Athena | about 4.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 5 km | Locked |
| Hanging Gardens This project | This project is the point the others are measured from | 30 Mar 2021 | – | Not verified yet |
|---|---|---|---|---|
| Lodha Mirabelle | 1.6 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Mirabelle Phase 2 | about 1.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Magnolia Delight | about 2.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Brr North Excellency Phase I | about 3 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Sumadhura Solea | 3.0 km | 30 Jun 2029 | 14% (32 of 233) | Locked |
| Sumadhura Epitome | 3.1 km | 31 Dec 2027 | 58% (152 of 262) | Locked |
| Rent, 4BHK, 3 km | ₹1,08,000 /mo · 6 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹40,000 /mo · 40 listings | |
| Rent, 2BHK, 3 km | ₹25,000 /mo · 95 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 61 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 93 listings with a size |
| Projects within 4 km, counted | 26 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 4,291 | |
| Booked | 2,541 of 4,291 (59%) | |
| Unsold | 1,750 | |
| Booked a month, pooled | 36 flats | |
| Months to sell, pooled | 48 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (mixed), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 420 m, Veerannapalya drain near Manpho convention center |
| Nearest storm drain | 980 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 280 m to the west, an unnamed water body |
| Schedule end | 15 Feb 2020 | |
|---|---|---|
| RERA completion date | 30 Mar 2021 | Red flag |
| Work began, as filed | 1 Jan 2014 |
| Structure | RCC framed structure |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹143.90 Cr |
|---|
| Escrow bank | HDFC · Koramangala |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 250 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 980 m to the east, tertiary drain | |
|---|---|---|
| Ground level | 891 m above sea level, plus or minus 4 m | |
| Metro, operational | 6.6 km, Baiyappanahalli | |
| Metro, under construction | 290 m, Veeranna Palya |
| Kempegowda Airport | 28.1 | 29 | 20.2 |
| MG Road (CBD) | 9.4 | 13 | 7.2 |
| Manyata Tech Park | 2.0 | 4 | 0.8 |
| ITPL, Whitefield | 18.2 | 23 | 14.3 |
| Ecospace, Bellandur ORR | 23.0 | 32 | 14.3 |
| Electronic City Ph 1 | 31.0 | 38 | 23.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.1 km to the west, named Hebbal 60MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.0 km to the north, named Manyata on OpenStreetMap |