Great experience with Jai Professional team, quality work, and excellent service. Highly recommended!
Overview
Jai Signature
Overview
Jai Signature
Overview
Jai Signature
Overview
Photo: Pavan chettyTitle & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 62 m²
Location & risks
Construction & progress
Developer
Land · ₹11.70 Cr 25.4%Development · ₹34.40 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 21 Jun 2025 | |
| Escrow bank | HDFC · OLD MADRAS ROAD |
Data room
123 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched, 1 plot has no filed extent to check against.
Great experience with Jai Professional team, quality work, and excellent service. Highly recommended!
My experience with JAI Signature and specifically with Hemant and Pavan (sales person)has been extremely disappointing. Based on my interaction, it honestly felt like the builder is not particularly interested in selling the property. I…
Do not buy from this builder as builder is liar and don’t provide good quality work!! His old projects are having really high quality issues (cracks and seapage) and when we ask for fixing it they are really rude towards that . Invest your…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 2 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jai Signature in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 21 Jun 2025 · No. 0042/24-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-128793 · issued 5 Oct 2024 · valid until 4 Oct 2029 | Clear |
| Water and sewerage NOC (BWSSB) | issued 12 Jun 2025 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 15 Mar 2028 |
| Land conversion | Converted 16 Jan 2015 · DC | |
|---|---|---|
| Survey numbers | 102/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 21 | 486 |
| 3BHK | 29 | 664 |
Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Garuda Grand, price locked; 2g Tula, price locked; Godrej Splendour, price locked; Assetz Bloom & Dell - Phase 2, price locked.
| Garuda Grand | 140 m | Locked | |
|---|---|---|---|
| 2g Tula | 600 m | Locked | |
| Vaswani Starlight | about 2.5 km | Locked | |
| Godrej Splendour | 2.7 km | Locked |
| Jai Signature This project | This project is the point the others are measured from | 15 Mar 2028 | – | Not verified yet |
|---|---|---|---|---|
| Garuda Grand | 140 m | 31 Mar 2028 | 41% (56 of 136) | Locked |
| 2g Tula | 600 m | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Vaswani Starlight | about 2.5 km | 31 Dec 2029 | 43% (115 of 269) |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 220 kV, 160 m from the site | Clear |
| Nearest government-flagged flood location | 850 m, Hoodi | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 160 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 220 m to the east, Sadaramangala Lake |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.90 (45 covered spaces for 50 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter |
| Possession, agreement | 15 Mar 2028 | |
|---|---|---|
| Schedule end | 3 Mar 2028 | |
| RERA completion date | 15 Mar 2028 | |
| Work began, as filed | 5 Dec 2025 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall material | Internal walls: solid concrete blocks | |
| Wall thickness | 6” thick external walls, 4” thick internal walls | |
| Building heights, fire NOC | 14.99 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC or Wooden windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid tiles (floor); Glazed tiles (walls, up to 7ft) | |
| Wiring | Concealed copper wiring | |
| Power backup | 100% power backup for lifts, common areas | |
| Sewage plant | Sewage treatment plant |
| Architect's certificate, registration | Dated 2 Dec 2025 · site inspected 28 Nov 2025 | |
|---|---|---|
| Engineer's certificate, registration | Dated 2 Dec 2025 | |
| Chartered accountant's certificate, registration | Dated 3 Dec 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹46.41 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹30.00 Cr | |
| Estimated cost, chartered accountant's certificate | ₹46.41 Cr, same as the filing |
| Flats booked, Form 4 Q3 2025-26 | 0 |
|---|
| Escrow bank | HDFC · OLD MADRAS ROAD |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Coevolve Misty Shores | about 3 km | Locked |
|---|
| Godrej Splendour Phase II | about 3 km | Locked |
|---|
| Axis Ekatva | about 3 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | 3.8 km | Locked |
|---|
| Nirmaanika Aria | about 4 km | Locked |
|---|
| Reflections 66 | 4.1 km | Locked |
|---|
| Assetz 66 & Shibui | about 4 km | Locked |
|---|
| Godrej Splendour | 2.7 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
|---|
| Coevolve Misty Shores | about 3 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
|---|
| Godrej Splendour Phase II | about 3 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,05,000 /mo · 10 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹63,000 /mo · 103 listings | |
| Rent, 2BHK, 3 km | ₹39,000 /mo · 133 listings | |
| Rent, 1BHK, 3 km | ₹17,000 /mo · 53 listings | |
| Rent per sq ft, 3 km | ₹35.5 /mo, as listed · 160 listings with a size |
| Projects within 4 km, counted | 54 (25 with an approximate location) | |
|---|---|---|
| Flats in them | 18,405 | |
| Booked | 12,605 of 18,405 (68%) | |
| Unsold | 5,800 | |
| Booked a month, pooled | 112 flats | |
| Months to sell, pooled | 51 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 580 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 160 m to the north, tertiary drain | |
|---|---|---|
| Ground level | 876 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.6 km, Hoodi Junction | |
| Metro, under construction | 3.7 km, DRDO Sports complex |
| Kempegowda Airport | 35.8 | 36 | 22.3 |
| MG Road (CBD) | 16.4 | 18 | 13.4 |
| Manyata Tech Park | 15.9 | 21 | 12.2 |
| ITPL, Whitefield | 5.3 | 7 | 2.1 |
| Ecospace, Bellandur ORR | 11.6 | 19 | 9.3 |
| Electronic City Ph 1 | 26.0 | 36 | 18.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the north-west, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 560 m to the east, named Hoody Traction on OpenStreetMap |