Overview
Jai Skyway
Overview
Jai Skyway
Overview
Jai Skyway
Overview
Photo: Nuruddin Mondal| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| Agm BuildersApplied for completion 16/07/2026 | AGM BUILDERS | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Dec 2029 |
| Aikam Golf Estates Phase IRegistered · no quarterly update yet | BCD EMPRASA LIMITED LIABILITY PARTNERSHIP | Plot | ~1,160–1,810 sqft (estimate: filed carpet plus 25%) | Dec 2026 |
| Aikam Golf Estates Phase IIActive · 1% built | BCD EMPRASA LIMITED LIABILITY PARTNERSHIP | Plot | ~1,140–2,040 sqft (estimate: filed carpet plus 25%) | Oct 2028 |
| Asn Sai EnclaveLapsed · completion date passed | ANKURAA SAI NITYA ESTATES | Plot | – | Mar 2021 |
| Back To LifeApplied for completion 05/04/2019 | Azven Realty Ventures Private Limited | Plot | – | Dec 2019 |
| Emprasa Startup City - ResidentialLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DC · Survey 80
K-RERA filing, land schedule
Approvals
| Building plan (Hoskote Planning Authority) | Sanctioned 22 Apr 2026 · No. CC/607/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Builder: JAI SHELTERS
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 95 m² 61.9%2BHK · avg 77 m² 38.1%
Location & risks
Construction & progress
Developer
Land · ₹4.78 Cr 6.6%Development · ₹67.86 Cr 93.4%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 22 Apr 2026 | |
| Escrow bank | AU Small Finance Bank · Rajapalya area near Hoodi Circle |
Data room
Source: K-RERA project page and the documents filed there, as read by us. 10 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| HOSKOTE NEO HOMES LIMITED |
| Apartment |
| 409 sqft carpet (as filed) |
| Dec 2023 |
| Grovin Green CityApplied for completion 07/05/2024 | M/S GROVIN DEVELOPERS | Plot | – | Feb 2022 |
| House Of SapiensRegistered · no quarterly update yet | MA SARADA CONSTRUCTIONS | Apartment | 738–2,147 sqft carpet (as filed) | Jan 2031 |
8 of 14 other projects in Hoskote, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jai Skyway in the interactive atlas
Approval or registration
Khata issued
A Khatha · DODAHULLUR GRAMA PANCHYATH · Survey 80
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan CC/607/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/270726/008844
K-RERA registration
Approval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | sy no 80 | |
|---|---|---|
| Land extent, Sy sy no 80 | 3,986 sq m | |
| Land area of this registration | 3,986 sq m | |
| Khata | A Khatha · DODAHULLUR GRAMA PANCHYATH · 27 May 2025 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 15 Dec 2030 |
| Land conversion | Converted 30 Jul 2007 · DC | |
|---|---|---|
| Survey numbers | sy no 80 |
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 40 | 829 |
| 3BHK | 65 | 1,020 |
| Sowparnika Indradhanush Phase I | about 0.5 km | Locked | |
|---|---|---|---|
| Sowparnika Shivadhanush | about 0.5 km | Locked | |
| Triaxis Splendour + | about 3 km | Locked | |
| Riqueza Siri | about 4.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 6.5 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 6.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 6.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 7 km | Locked | |
| Neighbourhood Tree Park | about 7.5 km | Locked | |
| Definer Upper Deck | about 8 km | Locked | |
| Godrej Woodscapes | about 9 km | Locked | |
| Sowparnika Euphoria in the East | about 9 km | Locked |
| Jai Skyway This project | This project is the point the others are measured from | 15 Dec 2030 | – | Not verified yet |
|---|---|---|---|---|
| Sowparnika Indradhanush Phase I | about 0.5 km | 31 May 2027 | 99% (567 of 570) | Locked |
| Sowparnika Shivadhanush | about 0.5 km | 30 Nov 2027 | 99% (357 of 360) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 13 km, SIDDHARTHA LAYOUT KADUGODI |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.98 (103 covered spaces for 105 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 31 Dec 2029 | |
|---|---|---|
| RERA completion date | 15 Dec 2030 | |
| Work began, as filed | 1 Jul 2026 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹72.64 Cr |
|---|
| Escrow bank | AU Small Finance Bank · Rajapalya area near Hoodi Circle |
|---|
| Triaxis Splendour + |
|---|
| about 3 km |
| 31 Dec 2026 |
| 57% (59 of 104) |
| Locked |
| Riqueza Siri | about 4.5 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 6.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 6.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| Projects within 4 km, counted | 13 (13 with an approximate location) | |
|---|---|---|
| Flats in them | 3,166 | |
| Booked | 2,267 of 3,166 (72%) | |
| Unsold | 899 | |
| Booked a month, pooled | 91 flats | |
| Months to sell, pooled | 10 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (DODAHULLUR) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 13.5 km, Whitefield | |
| Metro, under construction | about 15.5 km, KIA Terminal |
| Kempegowda Airport | 31.5 | 16 |
| MG Road (CBD) | 30 | 27 |
| Manyata Tech Park | 29.5 | 22 |
| ITPL, Whitefield | 20.5 | 15.5 |
| Ecospace, Bellandur ORR | 31 | 24.5 |
| Electronic City Ph 1 | 45 | 33 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |