High rent, power fluctuations, water stoppage even in Monsoon. I won't recommend living here. Only good thing is swimming pool and that is not clean many a times. Association needs to reconsider their decisions.
Rrahul dugar6 Feb 2024★★★★★
Super place for rent accomodation and ourchase property, good amenities at reasonable price
SSarmista Barik20 Aug 2023★★★★★
Today I visited for a house warming party of my friend. Small beautiful clean gated society. Beautiful environment. No loude noise of busy roads.
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Approvals
Is it approved for its use?
Review1 to review · 1 clear
RERA extensionsGranted!ReviewReview
Permits
Approval letters
Power NOC
Filed with the registration
Fire NOC
Filed with the registration
Environmental clearance
SEIAA 120 CON 2017 · issued 12 Jan 2018
✓Clear
Airport height NOC
Filed with the registration
Disputes & cases
Are there court cases or buyer complaints on this project?
Clear1 clear
Builder: M/s Jayani Builders and Developers
Court cases on the project's land
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
Search pending.
Court cases against the builder and landowners
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
None found.
Buyer complaints filed with K-RERA on this project
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
Buyer complaints on other projects by this builder
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
✓Confirmed: the record names this project, its land or its promoter company?Likely: matched by the builder's nameHigh: a court stay or a pending case on the filed landMedium: open, or the record does not sayLow: decided or closed
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Completed: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Nearest 12 with filed prices
Location & risks
What is the location like?
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedLocal authorityDeclared by the promoter
The site
Flooding
Site vs nearest drain
Construction & progress
How is it being built, and when will it be ready?
CompletionCompletedOccupancy certificate, 20 May 2023
StructureRCC framed structureAs specified
Progress
Completion, architect
Completed: no quarterly return is on this phase's K-RERA filing
Work left
By component
Completed: no quarterly return is on this phase's K-RERA filing
Quarterly return
Developer
Can the developer deliver?
Sold116 / 223At the completion filing, 17 Apr 2024
Sold in the latest quarterNo return filed
Funding
Form 4
Estimated cost, at registration
₹49.00 Cr
Sales
Sold vs unsold, at completion
Loan & collateral
Can it be financed?
Conditions
Collateral checks
Escrow bank
Karur Vysya Bank Ltd. · Basavanagudi
Stage
Certified progress
Completed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Documents filed109On K-RERA
Available109100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
What we read
Environmental clearanceIssued 12 Jan 2018Filed as NOC SEIAA, p. 1
Filed 7 Oct 20212 pagesAvailable
Filed 7 Oct 20212 pagesAvailable
Filed 7 Oct 20212 pagesAvailable
Filed 7 Oct 20216 pagesAvailable
Filed 22 Dec 20212 pagesAvailable
Filed 22 Dec 20219 pages2 factsAvailable
Available
Available
Available
Available
Available
6 pagesAvailable
Available
Available
Available
Available
1 pageAvailable
Available
Available
Available
Available
Available
3 pagesAvailable
5 pagesAvailable
2 pagesAvailable
2 pagesAvailable
3 pagesAvailable
5 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Jayani Paradise is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; How the land reached this project; Title report; Charges; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Landowner share; Developer share; Sale deed signed by.
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
Granted · Approved 10 Mar 2023
RERA completion date
10 Jul 2023
Registration certificates
PRM/KA/RERA/1251/446/PR/190215/002379
EX/PRM/KA/RERA/1251/446/PR/230310/002379
Not verified yet: Building plan, Land conversion, Validity, Conversion order.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Unit mix filed; Unit types; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields; Months to sell unsold stock; K-RERA inventory.
Nearest storm drain
about 0.5 km from the locality centre, secondary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, an unnamed water body
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Local authority
Distances
Approximate: locality level
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
about 1 km from the locality centre
Quarry
about 0.5 km from the locality centre
Crematorium
about 1.5 km from the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 0.5 km from the locality centre
Not verified yet: Metro, operational; Power lines, flood-prone areas, drains; Planning and hazards; Drains and lakes; Specification and Form 5; Nearest city water main; Ground level; Metro, under construction; Road distance from the site; Six city anchors · OSRM, no traffic.
Completion
Completed, occupancy certificate 20 May 2023
Dates
Dates
Filed dates
Schedule end
23 Feb 2021
RERA completion date
10 Jul 2023
Work began, as filed
11 Oct 2018
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Possession, agreement; Structural safety certificate; Main structure; Electrical and plumbing finishing; Internal roads; Club house; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Building heights, fire NOC; Windows; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Power backup; Sewage plant; Structural engineer, quarterly; Design consultants (Form 6).
Sold (116) 52%Unsold (107) 48%
Sold per quarter
Completed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Flats sold, at completion
116
Flats unsold, at completion
107
Flats in the phase
223
Compliance
Escrow
Completed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
Karur Vysya Bank Ltd. · Basavanagudi
Share of collections the promoter declared for escrow
70%
Not verified yet: Receivable, sold flats; Cost left; Estimated cost; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Basemap: Esri, OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.