Overview
JP Iris Block-B
Part ofJP Iris2 phases, 180 flats
Overview
JP Iris Block-B
Part ofJP Iris2 phases, 180 flats
Overview
JP Iris Block-B
Part ofJP Iris2 phases, 180 flats
Overview
Part ofJP Iris2 phases, 180 flats
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 206 | ||||
| 206/2 (part) | 29 Jun 2024DC Office, Bangalore Rural | 11 Jan 1999 | ||
Approvals
| Building plan (Hoskote Planning Authority) | Sanctioned 18 Oct 2025 · No. HSK-LBPAS-10890/25-26/BP | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 9 Jan 2026 | |
| Building plan | Sanctioned 18 Oct 2025 | |
| Escrow bank | Canara Bank · SME Branch, Hoskote |
Data room
134 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · JP Housing Corporation's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open JP Iris Block-B in the interactive atlas
| 7 Mar 2025E Khatha · Municipal Council Hoskote |
| 23 Guntas |
| 206/20 | 29 Jun 2024Deputy commissioner Bangalore Rural District | 21 Jun 2007 | 7 Mar 2025E Khatha · CITY MUNICIPAL COUNCIL,HOSKOTE | 7.25 Guntas |
|---|
| 206/29 | 29 Jun 2024Deputy commissioner Bangalore Rural District | 1 Oct 2018 | 7 Mar 2025E Khatha · CITY MUNICIPAL COUNCIL,HOSKOTE | 5.25 Guntas |
|---|
| 206/30 | 29 Jun 2024Deputy commissioner Bangalore Rural District | 12 Sep 2018 | 7 Mar 2025E Khatha · CITY MUNICIPAL COUNCIL,HOSKOTE | 12 Guntas |
|---|
| 206/33 | 15 Jul 2024Deputy commissioner Bangalore Rural District | 5 Feb 2024 | 7 Mar 2025E Khatha · CITY MUNICIPAL COUNCIL,HOSKOTE | 3 Guntas |
|---|
| 206/35 | 29 Jun 2024Deputy commissioner Bangalore Rural District | 7 Feb 2024 | 7 Mar 2025E Khatha · CITY MUNICIPAL COUNCIL,HOSKOTE | 6 Guntas |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed registered
No. HSK-1-05965-2018-19 · Book 1 · executed 1 Oct 2018 · ಹೊಸಕೋಟೆ village, ಕಸಬಾ hobli
Title deed filed with K-RERA, pp. 1, 3, 6 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹40.0 L · Sy 206/35; 206/33, Hoskote village, Kasaba hobli, Hoskote taluk · 6 Guntas
Title deed filed with K-RERA, pp. 1, 7, 11 · See it in Documents
Transfer of the land
Title deed executed
Sy 206/2, Hoskote village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 2, 33 · See it in Documents
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan HSK-LBPAS-10890/25-26/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/300126/008440
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 9 Jan 2026 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Sketch and Village Map.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 206/2 (P), 206/20, 206/29, 206/30, 206/33, 206/35 | |
|---|---|---|
| Land area of this registration | 5,716 sq m | |
| Khata | E Khatha · Municipal Council Hoskote · 7 Mar 2025; E Khatha · CITY MUNICIPAL COUNCIL,HOSKOTE · 7 Mar 2025 | |
| Sale deed | Dated 11 Jan 1999, 21 Jun 2007, 12 Sep 2018 and 3 more | |
| Title deed | Consideration ₹75.0 L |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 206/2 (P) | Converted 29 Jun 2024 · DC Office, Bangalore Rural | |
| Sy 206/20, 206/29, 206/30, 206/35 | Converted 29 Jun 2024 · Deputy commissioner Bangalore Rural District | |
| Sy 206/33 | Converted 15 Jul 2024 · Deputy commissioner Bangalore Rural District | |
| Survey numbers | 206/2 (P) · 206/20 · 206/29 · 206/30 · 206/33 · 206/35 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 63 m² 50%3BHK · avg 84 m² 45.5%1BHK 4.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 4 | 2,002 |
| 2BHK | 44 | 30,064 |
| 3BHK | 40 | 36,253 |
| Sold, Q2 2026-27 | 31 / 88 | |
|---|---|---|
| Unsold, Q2 2026-27 | 57 | |
| Months to sell, derived from filed bookings | 31 months |
| One Residences At Sobha One World Ph4 W7 And 8 | about 1.5 km | Locked | |
|---|---|---|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 1.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 1.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 1.5 km | Locked | |
| Riqueza Siri | about 2 km | Locked | |
| Triaxis Splendour + | about 3 km | Locked | |
| Sowparnika Euphoria in the East | about 3.5 km | Locked | |
| Godrej Woodscapes | about 4 km | Locked | |
| Sattva Songbird | about 4.5 km | Locked | |
| Neighbourhood Tree Park | about 4.5 km | Locked | |
| Sowparnika Indradhanush Phase I | about 5.5 km | Locked | |
| Sowparnika Shivadhanush | about 5.5 km | Locked |
| JP Iris Block-B This project | This project is the point the others are measured from | 31 Dec 2028 | 35% (31 of 88) | Not verified yet |
|---|---|---|---|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 1.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 1.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 7 km, SAI BABA ASHRAM KADUGODI |
|---|
| Nearest storm drain | about 1 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 0.98 (86 covered spaces for 88 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 100% · planned by 10 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 25 Mar 2028 | |
| Completion | 47% |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Jan 2026 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 12.5 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 16 Dec 2025 · site inspected 12 Dec 2025 | |
| Chartered accountant's certificate, registration | Dated 29 Dec 2025 | |
| Chartered accountant, Form 4 | Dated 7 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹11.43 Cr 23.1%Development · ₹38.14 Cr 76.9%
| Estimated cost, at registration | ₹49.57 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹37.47 Cr | |
| Estimated cost, chartered accountant's certificate | ₹49.57 Cr, same as the filing | |
| Cost incurred | ₹15.20 Cr | |
| Cost left | ₹34.38 Cr |
Sold (31) 35.2%Unsold (57) 64.8%
| Sold, Q4 2025-26 | 20 / 88 · 68 available | |
|---|---|---|
| Sold, Q1 2026-27 | 28 / 88 · 60 available | |
| Sold, Q2 2026-27 | 31 / 88 · 57 available | |
| Unsold, Q2 2026-27 | 57 | |
| Sold in Q1 2026-27 | 8 | |
| Sold in Q2 2026-27 | 3 | |
| Flats booked, Form 4 Q1 2026-27 | 27 |
| Escrow bank | Canara Bank · SME Branch, Hoskote | |
|---|---|---|
| Designated account, collected | ₹8.60 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.03 Cr in Q2 2026-27 (70% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹3,76,49,628 | |
| Net amount withdrawable, Form 4 | ₹1,49,32,739 |
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| One Residences At Sobha One World Ph6 W12,13,14 | about 1.5 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 1.5 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
|---|
| Riqueza Siri | about 2 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| Triaxis Splendour + | about 3 km | 31 Dec 2026 | 57% (59 of 104) | Locked |
|---|
| Projects within 4 km, counted | 38 (38 with an approximate location) | |
|---|---|---|
| Flats in them | 12,198 | |
| Booked | 7,432 of 12,198 (61%) | |
| Unsold | 4,766 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 21 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Hoskote Municipal Council) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | about 13 km, Saraswathi Nagar |
| Kempegowda Airport | 33 | 18 |
| MG Road (CBD) | 26.5 | 22 |
| Manyata Tech Park | 26 | 18 |
| ITPL, Whitefield | 14.5 | 9.5 |
| Ecospace, Bellandur ORR | 25 | 19 |
| Electronic City Ph 1 | 39 | 27 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Hoskote on OpenStreetMap |