Overview
Jrc Palladio Phase 2
Overview
Jrc Palladio Phase 2
Overview
Jrc Palladio Phase 2
Overview
Photo: Apoorva M ReddyTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 5/3 | 3 Oct 2015Deputy Commissioner | 11 Nov 2020in favour of BCITS Private Limited | 12 Apr 2023E Khatha · panchayath | 1 acre 20.08 guntas |
Approvals
| Building plan (Local Planning Authority) | Sanctioned 6 Mar 2023 · No. LAO 20/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 6 Mar 2023 | |
| Escrow bank | ICICI Bank · Kasavanahalli |
Data room
246 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
All 345 projects in Old Madras Road → · Jrc Projects's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Jrc Palladio Phase 2 in the interactive atlas
| 7/2 | 3 Oct 2015Deputy Commissioner | 11 Nov 2020 | 13 Apr 2023E Khatha · panchayath | 4 acres 04 guntas |
|---|
| Survey 19 | ||||
|---|---|---|---|---|
| 19/1 | 29 Apr 2016Deputy Commissioner | 18 Aug 2021 | 13 Apr 2023E Khatha · panchayath | 26.08 guntas |
| 19/2 | 29 Jan 2016Deputy Commisioner | 18 Aug 2021 | 13 Apr 2023E Khatha · panchayath | 19 guntas |
| 19/3 | 29 Jan 2016Deputy Commissioner | 18 Aug 2021 | 12 Apr 2023E Khatha · panchayath | 13.08 guntas |
| 20/2 | 28 Sep 2016Deputy Commissioner | 18 Aug 2021 | 13 Apr 2023E Khatha · panchyath | 0-01.04 guntas |
|---|
| Survey 22 | ||||
|---|---|---|---|---|
| 22/1 | 28 Sep 2016Deputy Commissioner | 18 Aug 2021 | 12 Apr 2023E Khatha · panchayath | 0-00.12 guntas |
| 22/2 | 28 Sep 2016deputy commissioner | 18 Aug 2021 | 10 Apr 2023E Khatha · panchayath | 2 acres 18.08 guntas |
| 22/3 | 19 Aug 2016Deputy Commissioner | 5 Sep 2018in favour of JRC Projects | 18 Apr 2023E Khatha · Panchayath | 20 guntas |
| 22/4 | Not converted | 12 Mar 2021in favour of JRC Projects | 18 Apr 2023E Khatha · Panchayath | 6 guntas |
| Survey 21 | ||||
|---|---|---|---|---|
| 21/2 | 28 Sep 2016Deputy Commissioner | 18 Aug 2021 | 12 Apr 2023E Khatha · panchayath | 21.08 guntas |
| 21/3 | 19 Aug 2016Deputy Commissioner | 5 Sep 2018in favour of JRC Projects | 11 Apr 2023E Khatha · panchayath | 0.35 Guntas |
| 21/4 | 19 Aug 2016Deputy Commissioner | 5 Sep 2018 | 12 Apr 2023E Khatha · Panchayath | 1 acre |
| 21/6 | 4 Feb 2023Deputy Commissioner | No sale deed | 18 Apr 2023E Khatha · panchayath | 14 guntas |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Sy 5/2, Anekal taluk
Title deed filed with K-RERA, pp. 4, 31 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.56 Cr · Sy 21/2, Sarjapura hobli, Anekal taluk; Sy 22/2, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 15, 22, 23 · See it in Documents
Transfer of the land
Title deed executed
Sy 21/5; 21/1, Sarjapura hobli, Anekal taluk · 0 Acres 17 Guntas; Sy 13, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 25 · See it in Documents
Transfer of the land
Title deed executed
Sy 21/4, Sarjapura hobli
Title deed filed with K-RERA, pp. 2, 24 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹9.43 Cr · Sy 7/2; 7, Billchikkanahalli village, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 18, 43 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹9.43 Cr · Sy 7/2; 7, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 18, 43 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan LAO 20/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/090623/005987
K-RERA registration ·
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: Sy No 21_6 Sketch, 2 pages, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 5/3, 7/2, 19-1, 19-2, 19/3, 20/2 and 8 more | |
|---|---|---|
| Khata | E Khatha · panchayath · 12 Apr 2023; E Khatha · panchayath · 13 Apr 2023; E Khatha · panchyath · 13 Apr 2023; and 5 more | |
| Sale deed | Dated 5 Sep 2018, 11 Nov 2020, 12 Mar 2021 and 1 more | |
| Sale deed in favour of | BCITS Private Limited, JRC Projects | |
| Title deed | Sy 19/1 | |
| Title deed | Sy 21/2 | |
| Title deed | Sy 7/2; 7 · 04 Acres 04 Guntas | |
| Title deed | Sarjapura hobli, Anekal taluk | |
| Title deeds | And 3 more read from the filing |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Dec 2023 |
| Land conversion | 13 of 14 parcels converted | |
|---|---|---|
| Sy 5/3, 7/2 | Converted 3 Oct 2015 · Deputy Commissioner | |
| Sy 19-1 | Converted 29 Apr 2016 · Deputy Commissioner | |
| Sy 19-2 | Converted 29 Jan 2016 · Deputy Commisioner | |
| Sy 19/3 | Converted 29 Jan 2016 · Deputy Commissioner | |
| Sy 20/2, 22/1, 21/2, 22/2 | Converted 28 Sep 2016 · Deputy Commissioner | |
| Sy 21/3, 21/4, 22/3 | Converted 19 Aug 2016 · Deputy Commissioner | |
| Other parcels | 2 more groups on the filing | |
| Survey numbers | 5/3 · 7/2 · 19-1 · 19-2 · 19/3 · 20/2 · 22/1 · 21/2 · 22/2 · 21/3 · 21/4 · 21/6 · 22/3 · 22/4 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 22 (22 with an approximate location) | |
|---|---|---|
| Plots in them | 4,863 | |
| Booked | 1,996 of 4,863 (41%) | |
| Unsold | 2,867 | |
| Booked a month, pooled | 85 plots | |
| Months to sell, pooled | 33 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 11 km, Gunjur |
|---|
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| RERA completion date | 30 Dec 2023 | |
|---|---|---|
| Work began, as filed | 5 Nov 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 18 Apr 2023 · site inspected 6 Jan 2023 |
|---|
Land · ₹8.19 Cr 26.9%Development · ₹22.28 Cr 73.1%
| Estimated cost, at registration | ₹30.46 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹13.71 Cr |
| Escrow bank | ICICI Bank · Kasavanahalli | |
|---|---|---|
| Escrow account, Q3 2026-27 | Opened at ₹1.8 L, ₹3.10 Cr other deposits | |
| Share of collections deposited in escrow | 61.11% |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 | |
| Other phases under this promoter name | 4 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 5 months early |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 9 km, Bommasandra | |
| Metro, under construction | about 15 km, Kadubeesanahalli |
| Kempegowda Airport | 57.5 | 42 |
| MG Road (CBD) | 30.5 | 25 |
| Manyata Tech Park | 38.5 | 29.5 |
| ITPL, Whitefield | 24 | 18 |
| Ecospace, Bellandur ORR | 20.5 | 15 |
| Electronic City Ph 1 | 17.5 | 10.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 3 km to the east |