Overview
Karle Zenith Residences
Overview
Karle Zenith Residences
Overview
Karle Zenith Residences
Overview
Photo: DBE550| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
| Century XenonLapsed · completion date passed | Century Real Estate Holdings Private Limited | Apartment | 2,368–5,291 sqft carpet (as filed) | Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 55 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Karle Zenith Residences in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Mirabelle, price locked; Sumadhura Solea, price locked; Sumadhura Epitome, price locked; Assetz Soho & Sky Phase 1b, price locked; Assetz Soho & Sky, price locked.
| Mirabelle Phase 2 | about 1 km | Locked | |
|---|---|---|---|
| Lodha Mirabelle | 1.3 km | Locked | |
| Sumadhura Solea | 2.5 km | Locked | |
| Sumadhura Epitome | 2.5 km | Locked | |
| Brr North Excellency Phase I | about 2.5 km | Locked | |
| Cumins Sanctum | about 2.5 km | Locked | |
| Magnolia Delight | about 3 km | Locked | |
| Assetz Soho & Sky Phase 1b | 2.8 km | Locked | |
| Assetz Soho & Sky | 2.9 km | Locked | |
| Sobha City Athena | about 4 km | Locked | |
| Vkk Grand | 4.2 km | Locked | |
| Sattva La Vita | 4.7 km | Locked |
| Karle Zenith Residences This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Mirabelle Phase 2 | about 1 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Lodha Mirabelle | 1.3 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Sumadhura Solea | 2.5 km | 30 Jun 2029 | 14% (32 of 233) | Locked |
| Sumadhura Epitome | 2.5 km | 31 Dec 2027 | 58% (152 of 262) | Locked |
| Brr North Excellency Phase I | about 2.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Cumins Sanctum | about 2.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Rent, 4BHK, 3 km | ₹1,08,000 /mo · 5 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹42,000 /mo · 41 listings | |
| Rent, 2BHK, 3 km | ₹24,750 /mo · 78 listings | |
| Rent, 1BHK, 3 km | ₹13,000 /mo · 59 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 83 listings with a size |
| Projects within 4 km, counted | 27 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 4,481 | |
| Booked | 2,633 of 4,481 (59%) | |
| Unsold | 1,848 | |
| Booked a month, pooled | 39 flats | |
| Months to sell, pooled | 48 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech) | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 90 m from the site | Clear |
| Nearest government-flagged flood location | 270 m, Veerannapalya drain near Manpho convention center |
| Nearest storm drain | 370 m to the north, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 180 m to the south, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Nearest city water main | 320 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 370 m to the north, primary drain | |
|---|---|---|
| Ground level | 884 m above sea level, plus or minus 4 m | |
| Metro, operational | 7.2 km, Baiyappanahalli | |
| Metro, under construction | 540 m, Veeranna Palya |
| Kempegowda Airport | 29.0 | 31 | 19.7 |
| MG Road (CBD) | 10.0 | 15 | 7.8 |
| Manyata Tech Park | 2.1 | 5 | 0.5 |
| ITPL, Whitefield | 19.1 | 25 | 14.7 |
| Ecospace, Bellandur ORR | 23.9 | 34 | 15.0 |
| Electronic City Ph 1 | 30.7 | 40 | 23.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 890 m to the west, named Hebbal 60MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 520 m to the north-east, named Manyata on OpenStreetMap |