Building plan (BBMP)Sanctioned 9 Oct 2024No. BBMP/Addl.Dir/JDNORTH/0093/21-22
RERA extensionsNone on the filingFiling read 20 Oct 2026
Land conversionConverted 17 Jan 2018DC Office, Bangalore
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Review1 to review · 1 clear
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedBorewell, BWSSBDeclared by the promoter
Metro, operational1.6 km
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion22%As of Q2 2026-27, promoter's return
Possession, agreement31 Dec 2030Agreement for sale, p. 13
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear1 clear
Sold9 / 92As of Q2 2026-27
Sold in Q2 2026-277✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BBMP)
Sanctioned 9 Oct 2024
Escrow bank
HDFC · Whitefield Main Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
123 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
This property is a promising project with impressive artictectural design and thoughtful planning.Had a great experience with team and they were professional, friendly, and explained all the project details clearly, making the overall…
VVikas Sarkar8 Sep 2026★★★★★
Lemon tree is a beautiful and well planned apartment project. Great location near to metro in 1.5km and good quality construction and spacious homes good choice for both families and investment
JJP Lavender JP Lavender8 Sep 2026★★★★★
Excellent connectivity, good infrastructure and quality of construction
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lemon Tree in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 9 Oct 2024 · No. BBMP/Addl.Dir/JDNORTH/0093/21-22
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/420/2022 · issued 11 Apr 2023 · building height 33.8 m
✓Clear
Environmental clearance
SEIAA 128 CON 2022 · EC identification no. EC23B000KA170847 · issued 27 Jan 2023
✓Clear
Airport height NOC
Filed with the registration
Pollution board (CFE)
consent order CTE-334336 · issued 10 Nov 2022 · valid until 24 Mar 2027
✓Clear
Water and sewerage NOC (BWSSB)
issued 14 Feb 2023
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2030
Registration certificates
PRM/KA/RERA/1251/446/PR/290526/008691
Land use
Conversion order
Land conversion
Converted 17 Jan 2018 · DC Office, Bangalore
Survey numbers
4/1
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 102 m² 73.6%
2BHK · avg 82 m² 26.4%
Unit types
Type
Flats
Carpet per flat, average (sq ft)
2BHK
23
885
3BHK
64
1,093
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Sold, Q2 2026-27
9 / 92
Unsold, Q2 2026-27
83
Months to sell, derived from filed bookings
36 months
The area
Comparable projects
Filed prices nearby
Basemap: Esri, OpenStreetMap contributors
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Reflections 66, price locked; Sowparnika Rhythm of Rain, price locked; Sowparnika Ashiyana Phase II, price locked; Godrej Splendour, price locked.
This project
Padlock: that project's price is part of its own report
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
Channasandra
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 1.1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Not verified yet: Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹5.47 Cr 6.5%Development · ₹79.11 Cr 93.5%
Form 4
Estimated cost, at registration
₹84.58 Cr
Estimated cost, architect's and engineer's certificates
₹52.64 Cr
Estimated cost, Form 4 Q2 2026-27
₹64.49 Cr
Cost incurred
₹14.75 Cr (22.9% of the Form 4 Q2 2026-27 estimate)
Sales
Sold vs unsold, Q2 2026-27
Sold (9) 9.8%Unsold (83) 90.2%
Sold per quarter
K-RERA inventory
Sold, Q1 2026-27
2 / 92 · 90 available
Sold, Q2 2026-27
9 / 92 · 83 available
Unsold, Q2 2026-27
83
Sold in Q2 2026-27
7
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · Whitefield Main Road
Designated account, collected
₹2.99 Cr in Q2 2026-27
Designated account, withdrawn
₹0 in Q2 2026-27 (0% of that quarter's deposits)
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.