No one to show the place! Even security does not know who's in-charge! Must be stopped project!!
Overview
Lgcl New Life
Overview
Lgcl New Life
Overview
Lgcl New Life
Overview
Photo: Prashanth NTitle & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹10.70 Cr 9.9%Development · ₹97.54 Cr 90.1%
Loan & collateral
| Escrow bank | HDFC · RICHMOND ROAD |
|---|
Data room
77 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
No one to show the place! Even security does not know who's in-charge! Must be stopped project!!
Even though the project looks promising, there are multiple factors that pull it down: 1) Poor location in terms of access - the roads are extremely bad 2) Already late in terms of delivery date. I don't see the project getting ready before…
High priced and arrogant sales guys. No proper connecting roads. The prices around this location is very less than these people quote. Better villas at lower costs you can get for sure.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
All 534 projects in Sarjapur Road → · Lgcl Urban Homes (India) LLP's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Lgcl New Life in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 3 Mar 2020 | |
|---|---|---|
| RERA completion date | 30 Sep 2021 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 10 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Birla Evara, price locked; 63 Degree East - Tower E, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Satori Residence By Genurise, price locked; Assetz Ren & Rei, price locked; Mana Jardin Neo, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Adarsh Rosewood, price locked.
| Haven Phase 2 | about 0.5 km | Locked | |
|---|---|---|---|
| Birla Evara | 2.0 km | Locked | |
| 63 Degree East - Tower E | 2.2 km | Locked | |
| Assetz Muse & Maison | about 2 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 2.3 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 2.3 km | Locked | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | 2.3 km | Locked | |
| Satori Residence By Genurise | 2.4 km | Locked | |
| Assetz Ren & Rei | 2.4 km | Locked | |
| Mana Jardin Neo | 2.6 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | 2.6 km | Locked | |
| Abhee Riviera Royale | about 3.5 km | Locked |
| Lgcl New Life This project | This project is the point the others are measured from | 30 Sep 2021 | – | Not verified yet |
|---|---|---|---|---|
| Haven Phase 2 | about 0.5 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
| Birla Evara | 2.0 km | 25 Dec 2031 | 66% (1,060 of 1,594) | Locked |
| 63 Degree East - Tower E | 2.2 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
| Assetz Muse & Maison | about 2 km | 31 Mar 2030 | 9% (12 of 128) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | 2.3 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | 2.3 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
| Rent, 4BHK, 3 km | ₹86,500 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹62,000 /mo · 120 listings | |
| Rent, 2BHK, 3 km | ₹37,500 /mo · 194 listings | |
| Rent, 1BHK, 3 km | ₹21,000 /mo · 62 listings | |
| Rent per sq ft, 3 km | ₹34.8 /mo, as listed · 197 listings with a size |
| Projects within 4 km, counted | 84 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 23,094 | |
| Booked | 13,183 of 23,094 (57%) | |
| Unsold | 9,911 | |
| Booked a month, pooled | 300 flats | |
| Months to sell, pooled | 31 months |
Map of the ground within about 1.1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 430 m from the filed location | Clear |
| Nearest government-flagged flood location | 1.6 km, Doddakannelli |
| Nearest storm drain | 1.2 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 160 m to the north, an unnamed pond |
| Schedule end | 31 Dec 2019 | |
|---|---|---|
| RERA completion date | 30 Sep 2021 | Red flag |
| Work began, as filed | 6 Apr 2015 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Environmental clearance | Filed with the registration |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹108.25 Cr |
|---|
| Escrow bank | HDFC · RICHMOND ROAD | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 1.1 km of the site.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 1.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 1.2 km to the south, tertiary drain | |
|---|---|---|
| Ground level | 898 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.8 km, Beratena Agrahara | |
| Metro, under construction | 4.5 km, Ibbalur |
| Kempegowda Airport | 49.5 | 57 | 34.8 |
| MG Road (CBD) | 17.2 | 25 | 13.5 |
| Manyata Tech Park | 25.8 | 35 | 19.0 |
| ITPL, Whitefield | 21.5 | 28 | 12.4 |
| Ecospace, Bellandur ORR | 9.0 | 15 | 4.4 |
| Electronic City Ph 1 | 11.1 | 15 | 5.3 |
| Landfill or waste transfer station | 820 m to the south-west | |
|---|---|---|
| Sewage treatment plant | 2.0 km to the west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | 1.8 km to the west, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | None within 3 km |