Undoubtedly BLRs most premium condominium. Great sit out decks, walking tracks and unobstructed views. Excellent housekeeping and inhouse stores to make living resort like. Condos like this are hard to come by.
Overview
Mahindra Windchimes
Overview
Mahindra Windchimes
Overview
Mahindra Windchimes
Overview
Photo: AbhijitTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Records searched to | 28 Jul 2017 |
|---|
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2018 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹79.73 Cr 28.1%Development · ₹203.76 Cr
Loan & collateral
| Records searched to | 28 Jul 2017 | Review |
|---|---|---|
| Escrow bank | HDFC · Bannerghatta Road, Bangalore |
Data room
32 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Undoubtedly BLRs most premium condominium. Great sit out decks, walking tracks and unobstructed views. Excellent housekeeping and inhouse stores to make living resort like. Condos like this are hard to come by.
The building is maintained very well. You can get the very good view of sunset and sunrise. Transport services are very nearby like just walkable distance. Interior are good, the building is fully secure with security and CCTV camera.
Appartment is good. Very tall building. But i didn't like the design of balcony. It is situated in main road where metro construction is undergoing. Very small and busy road. Location near Meenakshi mall. Bit old building but metro…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahindra Windchimes in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 11,977 sq m |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Azur, price locked; Pacific Legacy, price locked; Azur Tower D, price locked.
| Lodha Azur | 1.5 km | Locked | |
|---|---|---|---|
| Pacific Legacy | 1.6 km | Locked | |
| Iris Courtyard | about 2 km | Locked | |
| Azur Tower D | 2.2 km | Locked | |
| Aqua Vista | about 3 km | Locked | |
| Azur Phase 2 | about 3.5 km | Locked | |
| Dhiraan Lotus | about 3.5 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | 4.4 km | Locked | |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 4.5 km | Locked | |
| Platinum Landmark | about 4.5 km | Locked | |
| Mahindra NewHaven | 5.1 km | Locked | |
| K&T's Sai Sannidhi | 5.2 km | Locked |
| Mahindra Windchimes This project | This project is the point the others are measured from | 31 Dec 2018 | – | Not verified yet |
|---|---|---|---|---|
| Lodha Azur | 1.5 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
| Pacific Legacy | 1.6 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Iris Courtyard | about 2 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Azur Tower D | 2.2 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
| Aqua Vista | about 3 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Azur Phase 2 | about 3.5 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
| Rent, 3BHK, 3 km | ₹44,000 /mo · 77 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,000 /mo · 173 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 110 listings | |
| Rent per sq ft, 3 km | ₹28.4 /mo, as listed · 150 listings with a size |
| Projects within 4 km, counted | 31 (13 with an approximate location) | |
|---|---|---|
| Flats in them | 7,988 | |
| Booked | 5,351 of 7,988 (67%) | |
| Unsold | 2,637 | |
| Booked a month, pooled | 125 flats | |
| Months to sell, pooled | 21 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general) | |
|---|---|---|
| Nearest government-flagged flood location | 680 m, RR Layout in Arekere & Hulimavu junction |
| Nearest storm drain | 160 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 650 m to the south, Arakere Lake |
| RERA completion date | 31 Dec 2018 | |
|---|---|---|
| Work began, as filed | 25 Jun 2015 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹283.49 Cr |
|---|
| Escrow bank | HDFC · Bannerghatta Road, Bangalore |
|---|
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 0 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Arna MeadowsLapsed · completion date passed | ARNASHELTERS | Apartment | 1,584 sqft carpet (as filed) | Dec 2018 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
8 of 208 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 100 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 160 m to the north-west, tertiary drain | |
|---|---|---|
| Ground level | 911 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.1 km, BTM Layout | |
| Metro, under construction | 640 m, I.I.M.B |
| Kempegowda Airport | 43.5 | 49 | 36.2 |
| MG Road (CBD) | 10.4 | 15 | 9.5 |
| Manyata Tech Park | 19.4 | 27 | 17.4 |
| ITPL, Whitefield | 26.3 | 31 | 18.3 |
| Ecospace, Bellandur ORR | 13.8 | 18 | 9.6 |
| Electronic City Ph 1 | 18.4 | 18 | 10.2 |
| Landfill or waste transfer station | 570 m to the east | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the south | |
| Quarry | 2.5 km to the south | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the west |