Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
125 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 465 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mana Skanda The Right Life T12a&B in the interactive atlas
Covers 54/3 only
Transfer of the land
Sale deed
Survey 54/3, 55/3
K-RERA filing, land schedule
Covers 55/3 only
Transfer of the land
Sale deed
Survey 54/3, 55/3
K-RERA filing, land schedule
Covers 54/2 only
Transfer of the land
Sale deed
Survey 54/2
K-RERA filing, land schedule
Covers 54/4 only
Transfer of the land
Sale deed
Survey 54/4, 55/2
K-RERA filing, land schedule
Covers 55/2 only
Transfer of the land
Sale deed
Survey 54/4, 55/2
K-RERA filing, land schedule
Covers 54/3, 54/4 only
Approval or registration
Land use converted
Deputy Commissioner · Survey 54/3, 54/4, 55/2, 55/3
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 54/3, 54/4, 55/2, 55/3
K-RERA filing, land schedule
Covers 54/2 only
Approval or registration
Land use converted
Deputy Commissioner · Survey 54/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gram Panchayat · Survey 54/2, 54/3, 54/4, 55/2 and 1 more
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Gram Panchayat · Survey 54/2, 54/3, 54/4, 55/2 and 1 more
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/EM/EO-4/TA-4/EAST/26/2026-27
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/281026/009045
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 54/2, 54/3, 54/4, 55/2, 55/3 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 13,648 sq m | |
| Khata | E Khatha · Gram Panchayat · 14 Aug 2026 | |
| Sale deed | Dated 9 Jun 1987, 28 Aug 2003, 9 Aug 2024 | |
| Building plan (BDA) | Sanctioned 19 Aug 2026 · No. BDA/EM/EO-4/TA-4/EAST/26/2026-27 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2031 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 54/2 | Converted 20 Dec 2025 · Deputy Commissioner | |
| Sy 54/3, 54/4, 55/2, 55/3 | Converted 9 Oct 2025 · Deputy Commissioner | |
| Survey numbers | 54/2 · 54/3 · 54/4 · 55/2 · 55/3 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 67 m² 70.9%1BHK · avg 40 m² 29.1%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 128 | 430 |
| 2BHK | 312 | 720 |
| Orion Heights | about 2.5 km | Locked | |
|---|---|---|---|
| Nambiar District 25 Phase 2 | about 2.5 km | Locked | |
| Mana Jardin Neo | about 3.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 3.5 km | Locked | |
| 63 Degree East - Tower E |
| Mana Skanda The Right Life T12a&B This project | This project is the point the others are measured from | 31 Dec 2031 | Not filed | Not verified yet |
|---|---|---|---|---|
| Orion Heights | about 2.5 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
| Nambiar District 25 Phase 2 | about 2.5 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2.5 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 2 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.94 (415 covered spaces for 440 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Landfill or waste transfer station | None within 3 km |
|---|
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2031 | |
| RERA completion date | 31 Dec 2031 | |
| Work began, as filed | 1 Jan 2027 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 96.4 m filed, 2 towers | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 722.25 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
Land · ₹6.60 Cr 1.6%Development · ₹394.50 Cr 98.4%
| Estimated cost | ₹401.10 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | ICICI Bank · Sarjapur Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 19 Aug 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Sarjapur Branch | |
| about 4 km |
| Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 4 km | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 4 km | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 4 km | Locked |
|---|
| Bilva Phase-II By Bhavisha Homes | about 4 km | Locked |
|---|
| Jeevan's Allure | about 4 km | Locked |
|---|
| Engrace 3 | about 4 km | Locked |
|---|
| SOBHA Ayana | about 4 km | Locked |
|---|
| Mana Jardin Neo |
|---|
| about 3.5 km |
| 30 Dec 2032 |
| 27% (22 of 82) |
| Locked |
| Adarsh Park Heights Phase-2 | about 3.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
|---|
| 63 Degree East - Tower E | about 4 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 4 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Projects within 4 km, counted | 76 (76 with an approximate location) | |
|---|---|---|
| Flats in them | 32,840 | |
| Booked | 17,741 of 32,840 (54%) | |
| Unsold | 15,099 | |
| Booked a month, pooled | 427 flats | |
| Months to sell, pooled | 31 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 2 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 7 km, Kadubeesanahalli | |
| Kempegowda Airport | 33.5 |
| MG Road (CBD) | 17.5 |
| Manyata Tech Park | 21 |
| ITPL, Whitefield | 10 |
| Ecospace, Bellandur ORR | 7.5 |
| Electronic City Ph 1 | 9.5 |
| Sewage treatment plant | None within 3 km |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | about 1 km, named Domasandra Substation on OpenStreetMap |
|---|