⭐⭐⭐⭐⭐ Great experience! Fast service, friendly support, and very professional. Would definitely recommend.
Overview
Mantri Classic
Overview
Mantri Classic
Overview
Mantri Classic
Overview
Photo: Sudeeksha Murari⭐⭐⭐⭐⭐ Great experience! Fast service, friendly support, and very professional. Would definitely recommend.
Kind of old classic apartment in prime location of bangalore
plenty of parking space outside the apartment is available . The campus is well maintained. and people living there are also well manner,place is also very clean and hygienic
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Advaitha AkshaCompleted · OC 10-03-2022 | Advaitha ventures Pvt Ltd | Apartment | 1,567 sqft carpet (as filed) | Completed |
| Arihant VilayaLapsed · completion date passed | ARIHANT FOUNDATIONS AND HOUSING LIMITED | Apartment | – | Dec 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aydin Infra Signature 3Active · 85% built |
| AYDIN INFRA |
| Apartment |
| 1,167–1,832 sqft carpet (as filed) |
| Aug 2027 |
| BelakuLapsed · completion date passed | Millennial Luxury Estates Private Limited | Apartment | 2,284–2,621 sqft carpet (as filed) | Mar 2026 |
| BelvoirRegistered · no quarterly update yet | KINGLIFE INFRA PRIVATE LIMITED | Apartment | – | Dec 2031 |
| Gp AdityaCompleted · OC 16-01-2024 | VIJAYA LAKSHMI CONSTRUCTIONS | Apartment | 891 sqft carpet (as filed) | Completed |
| Green FontanaLapsed · completion date passed | GREEN CARS PVT LTD | Apartment | – | Dec 2019 |
| Hamiton TowersCompleted · OC 12-02-2024 | Pelagsus Infrastructures Pvt Ltd | Apartment | 2,160 sqft carpet (as filed) | Completed |
8 of 23 other projects in Koramangala, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mantri Classic in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Aydin Infra Signature 3, price locked; Century Regalia (Project 2), price locked.
| Aydin Infra Signature 3 | 920 m | Locked | |
|---|---|---|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2 km | Locked | |
| Century Regalia (Project 2) | 2.9 km | Locked | |
| Ranka Iris | about 3.5 km | Locked | |
| Pacific Legacy | 4.6 km | Locked | |
| Abhee Riviera Royale | about 5.5 km | Locked | |
| Dhiraan Lotus | about 5.5 km | Locked | |
| Vista Svara | about 6 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | 6.0 km | Locked | |
| Adarsh Rosewood | 6.8 km | Locked | |
| Mahindra NewHaven | 6.9 km | Locked | |
| Mahindra Zen | 6.9 km | Locked |
| Mantri Classic This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Aydin Infra Signature 3 | 920 m | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Century Regalia (Project 2) | 2.9 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Ranka Iris | about 3.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Pacific Legacy | 4.6 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Abhee Riviera Royale | about 5.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
| Rent, 5+BHK, 3 km | ₹1,04,000 /mo · 6 listings | |
|---|---|---|
| Rent, 4BHK, 3 km | ₹68,000 /mo · 10 listings | |
| Rent, 3BHK, 3 km | ₹73,500 /mo · 146 listings | |
| Rent, 2BHK, 3 km | ₹37,500 /mo · 303 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 232 listings | |
| Rent per sq ft, 3 km | ₹39.9 /mo, as listed · 249 listings with a size |
| Projects within 4 km, counted | 18 (8 with an approximate location) | |
|---|---|---|
| Flats in them | 1,863 | |
| Booked | 1,198 of 1,863 (64%) | |
| Unsold | 665 | |
| Booked a month, pooled | 18 flats | |
| Months to sell, pooled | 33 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 380 m, SRINIVAGILU TANK BED LAYOUT |
| Nearest storm drain | 90 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the south-west, K100 |
| K-RERA registrations under this promoter | 11 | |
|---|---|---|
| Marked completed | 0 | |
| Past promised date, not completed | 11 | Review |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Nearest city water main | 490 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 90 m to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 882 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.4 km, Central Silk Board | |
| Metro, under construction | 1.7 km, Agara |
| Kempegowda Airport | 39.8 | 43 | 30.5 |
| MG Road (CBD) | 7.5 | 12 | 5.9 |
| Manyata Tech Park | 16.1 | 22 | 12.5 |
| ITPL, Whitefield | 19.1 | 22 | 12.5 |
| Ecospace, Bellandur ORR | 7.9 | 13 | 5.0 |
| Electronic City Ph 1 | 15.0 | 19 | 11.5 |
| Landfill or waste transfer station | 1.3 km to the north-west | |
|---|---|---|
| Sewage treatment plant | 420 m to the east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the south-east |