Overview
Mizar
Overview
Mizar
Overview
Mizar
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Khata issued
Approvals
| Building plan (Hospete Urban Development Authority) | Sanctioned 5 Feb 2026 · No. LAO/67/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| SEIAA | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹5.45 Cr 57.4%Development · ₹4.05 Cr 42.6%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 5 Feb 2026 | |
| Escrow bank | KOTAK MAHINDRA BANK · Kadugodi |
Data room
105 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mizar in the interactive atlas
1 Acre 13 Gunta · Kolathuru · Survey 194/2
K-RERA filing, land schedule
Approval or registration
Khata issued
1 Acre 16.8 Gunta · Koalthuru · Survey 194/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bengaluru Rural · Survey 194/1, 194/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bengaluru Rural · Survey 194/1, 194/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hospete Urban Development Authority · plan LAO/67/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/020526/008616
K-RERA registration
Approval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 10,599 sq m | |
| Extent the filed land schedule names for these survey numbers | 11,109 sq m | |
| Plot area against the filed extent | 0.95 times | |
| Village, hobli and taluk on the KGIS map | Kolatthuru, Kasaba hobli, Hoskote taluk | |
| Mutation entry | None open on 2 of 2 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 194/1, 194/2 | |
|---|---|---|
| Land extent, Sy 194/1 | 1 Acre 16.8 Gunta | |
| Land extent, Sy 194/2 | 1 Acre 13 Gunta | |
| Whole survey numbers on the KGIS map | 10,599 sq m (the project holds a share) | |
| Khata | 1 Acre 16.8 Gunta · Koalthuru · 17 Mar 2023; 1 Acre 13 Gunta · Kolathuru · 16 Mar 2023 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|
| Sy. No. 194/1 | 2 | 1 acre 13 guntas | 0 | ||||
| Sy. No. 194/2 | 3 | 1 acre 13 guntas | 0 |
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2029 |
| Land conversion | Converted 6 Aug 2025 · DC Office, Bengaluru Rural | |
|---|---|---|
| Survey numbers | 194/1 · 194/2 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 15 (9 with an approximate location) | |
|---|---|---|
| Plots in them | 3,340 | |
| Booked | 2,359 of 3,340 (71%) | |
| Unsold | 981 | |
| Booked a month, pooled | 94 plots | |
| Months to sell, pooled | 10 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 11.3 km, SIDDHARTHA LAYOUT KADUGODI | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 140 m to the west, an unnamed water body |
As the promoter reported it
| Completion | 50% | |
|---|---|---|
| Completion, accountant | 71.6% of the estimated cost spent |
| RERA completion date | 31 Dec 2029 | |
|---|---|---|
| Work began, as filed | 5 Dec 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|
| Estimated cost, at registration | ₹9.50 Cr | |
|---|---|---|
| Cost incurred | ₹6.80 Cr (71.6% of the estimate) | |
| Cost left | ₹2.70 Cr |
| Escrow bank | KOTAK MAHINDRA BANK · Kadugodi | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Jadigenahalli Grama Panchayath) | |
| Nearest city water main | 8.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | None within 3 km | |
|---|---|---|
| Ground level | 888 m above sea level, plus or minus 4 m | |
| Metro, operational | 11.9 km, Whitefield | |
| Metro, under construction | 18.0 km, DRDO Sports complex |
| Kempegowda Airport | 35.9 | 34 | 18.9 |
| MG Road (CBD) | 29.5 | 28 | 27.0 |
| Manyata Tech Park | 29.0 | 30 | 22.8 |
| ITPL, Whitefield | 20.0 | 20 | 14.2 |
| Ecospace, Bellandur ORR | 30.6 | 32 | 23.2 |
| Electronic City Ph 1 | 44.3 | 46 | 31.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.9 km to the south-east, named Jadigenahalli on OpenStreetMap |