Overview
Mr Sannidhi
Overview
Mr Sannidhi
Overview
Mr Sannidhi
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| 4 Square White PetalsLapsed · completion date passed | 4 SQUARE REALTY | Apartment | 883 sqft carpet (as filed) | Sep 2025 |
| Adarsh AstriaCompleted · OC 14-02-2024 | Adarsh Developers | Apartment | – | Completed |
| Adarsh PremiaExtended to 31-03-2027 | Adarsh Developers | Apartment | 2,050–3,720 sqft | – |
| Construction Of 895 PadmanabhanagaraLapsed · completion date passed | Assistant Executive Engineer | Apartment | 269 sqft carpet (as filed) | May 2024 |
| Elegant TerracesLapsed · completion date passed | ELEGANT BUILDERS AND DEVELOPERS | Apartment | 1,412 sqft carpet (as filed) | Sep 2024 |
| Mamtha ParadiseActive · 68% built | mamtha dream works private limited | Mixed development | 744–891 sqft carpet (as filed) | Jun 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jul 2019 |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹35.00 Cr |
|---|
Loan & collateral
| Escrow bank | Karnataka Bank Ltd. · BASAVANAGUDI BRANCH |
|---|
Data room
Source: K-RERA project page and the documents filed there, as read by us. 9 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Mars MountCompleted (regulator flag) | Mars Builders | Apartment | 2,112 sqft carpet (as filed) | Completed |
| Mars The PlanetCompleted · OC 25-11-2025 | M/S MARS BUILDERS | Apartment | 787–1,639 sqft carpet (as filed) | Completed |
8 of 24 other projects in Banashankari, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Mr Sannidhi is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 5,665 sq m |
|---|
| Sobha Royal Crest | about 1.5 km, to a locality centre | Locked |
|---|
| Adarsh Premia | about 1.5 km, to a locality centre | Locked |
|---|
| Song Of Wind | about 2 km, to a locality centre | Locked |
|---|
| Garden Square | about 2.5 km, to a locality centre | Locked |
|---|
| Sumadhura Pramoda | about 4.5 km, to a locality centre | Locked |
|---|
| Srivara Vasudha | about 5 km, to a locality centre | Locked |
|---|
| Samaya Sunshine | about 5.5 km, to a locality centre | Locked |
|---|
| Vista Svara | about 6 km, to a locality centre | Locked |
|---|
| Mahindra Eden Phase-2 | about 6 km, to a locality centre | Locked |
|---|
| Sattva Forest Ridge | about 6.5 km, to a locality centre | Locked |
|---|
| Jhanavi Trishul Alaska | about 6.5 km, to a locality centre | Locked |
|---|
| Birla Tisya | about 7 km, to a locality centre | Locked |
|---|
| Mr Sannidhi This project | This project is the point the others are measured from | 30 Jul 2019 | – | Not verified yet |
|---|---|---|---|---|
| Sobha Royal Crest | about 1.5 km, to a locality centre | 31 Dec 2028 | 100% (329 of 329) | Locked |
| Adarsh Premia | about 1.5 km, to a locality centre | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Song Of Wind | about 2 km, to a locality centre | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Garden Square | about 2.5 km, to a locality centre | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Sumadhura Pramoda | about 4.5 km, to a locality centre | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Srivara Vasudha | about 5 km, to a locality centre | 30 Nov 2026 | 100% (95 of 95) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km from the locality centre, Chikkalasandra lake |
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1.5 km from the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | about 2.5 km from the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre, named Arehalli on OpenStreetMap |
| RERA completion date | 30 Jul 2019 | Red flag |
|---|---|---|
| Work began, as filed | 11 Dec 2017 |
| Escrow bank | Karnataka Bank Ltd. · BASAVANAGUDI BRANCH |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, secondary drain |
|---|