| Building plan (Anekal Planning Authority) | Sanctioned 4 Sep 2024 · No. LAO/119/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| SEIAA | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Projects within 4 km, counted | 1 (1 with an approximate location) |
|---|
Location & risks
Construction & progress
Developer
Land · ₹4.67 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 4 Sep 2024 | |
| Escrow bank | KOTAK MAHINDRA BANK · Jigani |
Data room
84 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Aavya HomesActive · 70% built | SON INFRA ENTERPRISES | Apartment | 731–886 sqft carpet (as filed) | Dec 2028 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Nakshatra Layout in the interactive atlas
Land use converted
DC Office, Bangalore · Survey 61/2, 61/7
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore · Survey 62/2
K-RERA filing, land schedule
Covers 61/2, 61/7 only
Transfer of the land
Title deed registered
No. ANK-1-12974-2023-24 · Book 1 · executed 26 Feb 2024 · Sy 61/7, Hompalaghatta village; Sy 61/2, Hompalaghatta village
Title deed filed with K-RERA, pp. 1, 4, 22, 23 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-12974-2023-24 · Book 1 · executed 26 Feb 2024 · Sy 61/7, Hompalaghatta village; Sy 61/2, Hompalaghatta village
Title deed filed with K-RERA, pp. 1, 4, 22, 23 · See it in Documents
Covers 61/2, 61/7 only
Transfer of the land
Sale deed
Survey 61/2, 61/7, 62/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 61/2, 61/7, 62/2
K-RERA filing, land schedule
Covers 61/5 only
Approval or registration
Land use converted
DC Office, Bangalore · Survey 61/5
K-RERA filing, land schedule
Covers 61/5 only
Transfer of the land
Sale deed
Survey 61/5
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Anekal Planning Authority · plan LAO/119/2023-24
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Local Panchayath · Survey 61/2, 61/5, 61/7, 62/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Local Panchayath · Survey 61/2, 61/5, 61/7, 62/2
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/090125/007373
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title report dated | 3 Dec 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: 1 ADLR Sketch, 2 pages, not in English.
| Filed survey numbers matched to the KGIS map | 4 of 4 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 50,350 sq m | |
| Extent the filed land schedule names for these survey numbers | 7,765 sq m | |
| Plot area against the filed extent | 6.48 times | |
| Village, hobli and taluk on the KGIS map | Hampalagatta, KASABA hobli, ANEKAL taluk | |
| Sy. 62/2: filed extent, KGIS plot | 4,047 sq m, 25,451 sq m | |
| Mutation entry | None open on 4 of 4 filed surveys |
Satellite map with the 4 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 4 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 61/2, 61/5, 61/7, 62/2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 50,350 sq m (the project holds a share) | |
| Khata | E Khatha · Local Panchayath · 31 Dec 2024 | |
| Sale deed | Dated 27 Feb 2024, 22 May 2024 |
| Sy. No. 61/2 | 1 | 20 guntas | 0 | |||||
| Sy. No. 61/5 | 2 | 9 guntas | 0 | |||||
| Sy. No. 61/7 | 1 |
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 61/2, 61/7 | Converted 29 Dec 2023 · DC Office, Bangalore | |
| Sy 61/5 | Converted 27 Mar 2024 · DC Office, Bangalore | |
| Sy 62/2 | Converted 21 Feb 2024 · DC Office, Bangalore | |
| Survey numbers | 61/2 · 61/5 · 61/7 · 62/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Plots in them | 80 |
|---|
| Booked | 6 of 80 (8%) |
|---|
| Unsold | 74 |
|---|
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 20 km, G K LAYOUT | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Oct 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 23 Dec 2024 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 21 Dec 2024 |
| Estimated cost, at registration | ₹6.77 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹1.50 Cr | |
| Estimated cost, chartered accountant's certificate | ₹6.77 Cr, same as the filing |
| Escrow bank | KOTAK MAHINDRA BANK · Jigani |
|---|
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 119 (85 completed, 34 extended) | |
| Average schedule slip | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 0 |
| Sy. No. 62/2 | 1 | 1 acre | 1 acre | 6 acres 12 guntas | The map differs by 5 acres 12 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Samandur Gram Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 13.5 km, Bommasandra | |
| Metro, under construction | about 22.5 km, Kalena Agrahara |
| Kempegowda Airport | 71 | 56 |
| MG Road (CBD) | 40 | 32.5 |
| Manyata Tech Park | 47.5 | 39.5 |
| ITPL, Whitefield | 40.5 | 32.5 |
| Ecospace, Bellandur ORR | 32 | 25.5 |
| Electronic City Ph 1 | 19 | 16 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |