Overview
North Maple
Overview
North Maple
Overview
North Maple
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 226 | ||||
| 226/1, 226/2, 226/3, 226/4 | 10 May 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 3 Gunta + 20 Gunta + 21 Gunta + 5 Gunta |
| 226/5 | ||||
Approvals
| Building plan (BIAPPA) | Sanctioned 21 Mar 2022 · No. BIAAPA/TP03/LAO/02/2019-20 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹17.71 Cr 75.3%Development · ₹5.81 Cr 24.7%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 21 Mar 2022 | |
| Escrow bank | STATE BANK OF INDIA · SME Kumara Park |
Data room
267 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open North Maple in the interactive atlas
| 5 Apr 2019DC |
| No sale deed |
| 7 Apr 2022A Khatha · Not applicable |
| 10 Gunta |
| 226/6 | 5 Apr 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 5 Gunta |
|---|
| 226/7, 226/8 | 10 May 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 5 Gunta + 2.5 Gunta |
|---|
| 226/9 | 24 May 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 5 Gunta |
|---|
| 226/10 | 14 Feb 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 5 Gunta |
|---|
| 226/11 | 24 May 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 2.5 Gunta |
|---|
| 226/12Old 226/5 | 5 Apr 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 10 Gunta |
|---|
| 226/13Old 226/5 | 5 Apr 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 10 Gunta |
|---|
| 226/14Old 226/5 | 12 Apr 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 10 Gunta |
|---|
| 226/15Old 226/5 | 10 May 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 4 Gunta |
|---|
| 227/2, 227/3, 227/4, 227/5 | 3 Aug 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 26 Gunta + 8.5 Gunta + 26 Gunta + 8.5 Gunta |
|---|
| 229/2, 229/3, 229/4 | 30 May 2019DC | No sale deed | 7 Apr 2022A Khatha · Not applicable | 33 Gunta + 25 Gunta + 30 Gunta |
|---|
K-RERA filing, land schedule
The whole project
Transfer of the land
Title deed executed
ಕ್ಷಮ hobli
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP03/LAO/02/2019-20
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/031022/005292
K-RERA registration
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title report dated | 15 Aug 2016 |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: EC for all sy nos upto 30-4-22.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 226/1, 226/2, 226/3, 226/4, 226/5 (Old 226/5), 226/6 and 16 more | |
|---|---|---|
| Khata | A Khatha · Not applicable · 7 Apr 2022 | |
| Title deed | Sy 226/4, Devanahalli village, Devanahalli taluk |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 23 Dec 2023 |
| Land conversion | 22 of 22 parcels converted | |
|---|---|---|
| Sy 226/1, 226/2, 226/3, 226/4, 226/7… | Converted 10 May 2019 · DC | |
| Sy 226/5 (Old 226/5), 226/6, 226/12… | Converted 5 Apr 2019 · DC | |
| Sy 226/9, 226/11 | Converted 24 May 2019 · DC | |
| Sy 226/10 | Converted 14 Feb 2019 · DC | |
| Sy 226/14 (Old 226/5) | Converted 12 Apr 2019 · DC | |
| Sy 227/2, 227/3, 227/4, 227/5 | Converted 3 Aug 2019 · DC | |
| Other parcels | 1 more groups on the filing | |
| Survey numbers | 226/1 · 226/2 · 226/3 · 226/4 · 226/5 (Old 226/5) · 226/6 · 226/7 · 226/8 · 226/9 · 226/10 · 226/11 · 226/12 (Old 226/5) · 226/13 (Old 226/5) · 226/14 (Old 226/5) and 8 more parcels |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Ekta Elements | about 9 km | Locked |
|---|
| North Maple This project | This project is the point the others are measured from | 23 Dec 2023 | – | Not verified yet |
|---|---|---|---|---|
| Ekta Elements | about 9 km | 31 Dec 2027 | – | Locked |
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Plots in them | 3,937 | |
| Booked | 2,711 of 3,937 (69%) | |
| Unsold | 1,226 | |
| Booked a month, pooled | 46 plots | |
| Months to sell, pooled | 22 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 20.5 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
| Possession, agreement | 31 Dec 2023 | |
|---|---|---|
| RERA completion date | 23 Dec 2023 | Review |
| Work began, as filed | 21 Mar 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration | |
|---|---|---|
| Engineer's certificate, registration | Dated 25 May 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹23.52 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.05 Cr |
| Escrow bank | STATE BANK OF INDIA · SME Kumara Park |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 28 km, K.R. Puram | |
| Metro, under construction | about 6 km, KIA Terminal |
| Kempegowda Airport | 11.5 | 6 |
| MG Road (CBD) | 37 | 33 |
| Manyata Tech Park | 32 | 25 |
| ITPL, Whitefield | 41 | 29.5 |
| Ecospace, Bellandur ORR | 52 | 36.5 |
| Electronic City Ph 1 | 57 | 46 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |