I have visited the project with the family, the floor plans are really nice and the way light and ventilation was planned was good. The sales person Bijay was really helpful and taken us to 11th floor with lifts not functional yet was…
SSubhasmita Nath21 Aug 2026★★★★★
Visited the property recently and really liked what I saw. The location is excellent, right on the main road and very close to the upcoming metro. The pricing is also quite attractive. I’m considering a 2 BHK here, and overall, I’d…
RRabbi Kouser22 Jul 2026★★★★★
Recently visited this project and was worried about the previous review. But the sales team clarified my each and every query and it’s a completely legal clear property and it will be handover well in advance as per the RERA deadline
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Oceanus White Meadows in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
₹ ••,•••
•• %
•• ••• ••••
•••••
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 23 May 2023 · No. BBMP/ADDLDir/JDSouth/0069/22-23
Power NOC
Filed with the registration
Fire NOC
GBC(1)529/2012 · building height 42.1 m
✓Clear
Environmental clearance
Filed with the registration
Airport height NOC
NOC ID HOSU/SOUTH/B/010522/646595 · issued 9 Feb 2022 · valid until 8 Feb 2030
✓Clear
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
31 Dec 2028
Registration certificates
PRM/KA/RERA/1251/310/PR/270623/006023
Land use
Conversion order
Land conversion
Converted 8 Sep 2000 · DC Bengaluru
Survey numbers
21-2 · 21-2
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 87 m² 49.6%2.5BHK · avg 98 m² 33.3%3BHK · avg 126 m² 15.6%4BHK 1.5%
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields.
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Completion, architect; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Form 4
Estimated cost, at registration
₹46.31 Cr
Estimated cost, architect's and engineer's certificates
₹34.79 Cr
Estimated cost, Form 4 Q3 2025-26
₹46.31 Cr
Cost incurred
₹28.89 Cr (62.4% of the Form 4 Q3 2025-26 estimate)
Cost left
₹17.43 Cr
Receivable, sold flats
₹19.67 Cr
Sales
Sold vs unsold, Q3 2025-26
Sold (89) 65.9%Unsold (46) 34.1%
K-RERA inventory
Sold, Q3 2025-26
89 / 135 · 46 available
Unsold, Q3 2025-26
46
Compliance
Escrow, Q3 2025-26
Escrow and filings
Escrow bank
HDFC · BTM LAYOUT
Designated account, collected
₹1.96 Cr in Q3 2025-26
Designated account, withdrawn
₹1.37 Cr in Q3 2025-26 (70% of that quarter's deposits)
Track record
Average schedule slip
DOSL builder track
Other phases under this promoter name
3
With a filed extension or completion
3 (2 completed, 1 extended)
Average schedule slip
52 months
Not verified yet: Sold in the latest quarter; Estimated cost; Collected from buyers; Land cost revision; Sold per quarter; Unregistered agreements, over 10% paid.
Site photos, Q3 2025-26
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
BWSSB
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot