Overview
Pavani Mirabilia Phase I
Part ofPavani Mirabilia3 phases, 1,624 flats
Overview
Pavani Mirabilia Phase I
Part ofPavani Mirabilia3 phases, 1,624 flats
Overview
Pavani Mirabilia Phase I
Part ofPavani Mirabilia3 phases, 1,624 flats
Overview
Part ofPavani Mirabilia3 phases, 1,624 flats
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 19 May 2022 · No. BDA/EM/EA-01/TA-4/E/07/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | HDFC BANK LTD · ₹145.00 Cr disbursed | |
|---|---|---|
| Building plan (BDA) | Sanctioned 19 May 2022 | |
| Escrow bank | HDFC · Richmond Road |
Data room
184 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Sai Sravanthi Infra Projects Pvt Ltd's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Pavani Mirabilia Phase I in the interactive atlas
Approval or registration
Land use converted
DISTRICT OFFICER BANGALORE · Survey 124
K-RERA filing, land schedule
Approval or registration
Land use converted
DISTRICT OFFICER BANGALORE · Survey 23
K-RERA filing, land schedule
Approval or registration
Land use converted
DISTRICT OFFICER BANGALORE · Survey 22
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYAT · Survey 22, 23, 124
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYAT · Survey 22, 23, 124
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · GRAMA PANCHAYAT · Survey 22, 23, 124
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/EM/EA-01/TA-4/E/07/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/120922/005235
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | HDFC BANK LTD · ₹145.00 Cr disbursed | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 22, 23, 124 | |
|---|---|---|
| Land extent, Sy 22 | 2 ACRE 30 GUNTAS | |
| Land extent, Sy 23 | 30 GUNTAS | |
| Land extent, Sy 124 | 3ACRE 39GUNTAS | |
| Land area of this registration | 54,278 sq m | |
| Khata | E Khatha · GRAMA PANCHAYAT · 4 Nov 2013 | |
| Title deed | Sy 124 |
| Landowner share | 37% |
|---|
| Environmental clearance |
|---|
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 25 May 2028 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 22 | Converted 24 Dec 2012 · DISTRICT OFFICER BANGALORE | |
| Sy 23 | Converted 5 Feb 2011 · DISTRICT OFFICER BANGALORE | |
| Sy 124 | Converted 23 Nov 2007 · DISTRICT OFFICER BANGALORE | |
| Survey numbers | 22 · 23 · 124 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 87 m² 40.2%2BHK · avg 66 m² 40%1BHK · avg 39 m² 19.9%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 200 | 415 |
| 2BHK | 402 | 705 |
| 3BHK | 404 | 939 |
| Sold, Q2 2026-27 | 465 / 1,108 | |
|---|---|---|
| Unsold, Q2 2026-27 | 643 |
| Nirmaanika Aria | about 1.5 km | Locked | |
|---|---|---|---|
| Godrej Splendour Phase II | about 2 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | about 2 km | Locked | |
| Godrej Splendour | about 2 km | Locked | |
| Sowparnika Euphoria in the East | about 2.5 km | Locked | |
| Vintage Valley | about 3.5 km | Locked | |
| Godrej Woodscapes | about 3.5 km | Locked | |
| Sattva Songbird | about 4 km | Locked | |
| Kumari Nautilus | about 4 km | Locked | |
| Godrej Parkshire (Hoskote) | about 4 km | Locked | |
| Axis Ekatva | about 4.5 km | Locked | |
| Garuda Grand | about 4.5 km | Locked |
| Pavani Mirabilia Phase I This project | This project is the point the others are measured from | 25 May 2028 | 42% (465 of 1,108) | Not verified yet |
|---|---|---|---|---|
| Nirmaanika Aria | about 1.5 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
| Godrej Splendour Phase II | about 2 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 2 km, SAI BABA ASHRAM KADUGODI |
|---|
| Nearest storm drain | about 1 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 75% | |
| Electricity, built | 30% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 50% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 0.98 (984 covered spaces for 1,006 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | 100% · planned by 30 Nov 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 75% · planned by 31 Jul 2026 | |
| Club house | 75% | |
| Completion | 87% | |
| Completion, accountant | 74.7% of the estimated cost spent |
| Schedule end | 30 Dec 2026 | |
|---|---|---|
| RERA completion date | 25 May 2028 | |
| Work began, as filed | 19 May 2022 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 12 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Engineer's certificate, registration | Dated 22 Jun 2022 | |
| Chartered accountant, Form 4 | Dated 12 Oct 2026 | |
| Architect's quarterly progress certificate dated | 8 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 5 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹53.43 Cr 11.3%Development · ₹418.06 Cr 88.7%
| Estimated cost, at registration | ₹471.49 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹401.98 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹523.69 Cr | |
| Cost incurred | ₹391.30 Cr (74.7% of the Form 4 Q2 2026-27 estimate) |
Sold (465) 42%Unsold (643) 58%
| Sold, Q1 2026-27 | 465 / 1,108 · 643 available | |
|---|---|---|
| Sold, Q2 2026-27 | 465 / 1,108 · 643 available | |
| Unsold, Q2 2026-27 | 643 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q2 2026-27 | 465 |
| Escrow bank | HDFC · Richmond Road | |
|---|---|---|
| Designated account, collected | ₹2.85 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.85 Cr in Q2 2026-27 (100% of that quarter's deposits) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2 km |
| 31 Oct 2027 |
| 100% (238 of 238) |
| Locked |
| Godrej Splendour | about 2 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
|---|
| Sowparnika Euphoria in the East | about 2.5 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Vintage Valley | about 3.5 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Projects within 4 km, counted | 53 (53 with an approximate location) | |
|---|---|---|
| Flats in them | 25,009 | |
| Booked | 15,168 of 25,009 (61%) | |
| Unsold | 9,841 | |
| Booked a month, pooled | 183 flats | |
| Months to sell, pooled | 49 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority (SEGEHALLI PANCHAYAT) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, primary drain | |
|---|---|---|
| Metro, operational | about 2.5 km, Whitefield | |
| Metro, under construction | about 8.5 km, Doddanekundi |
| Kempegowda Airport | 32 | 21 |
| MG Road (CBD) | 24 | 18 |
| Manyata Tech Park | 23.5 | 15.5 |
| ITPL, Whitefield | 6 | 4.5 |
| Ecospace, Bellandur ORR | 16.5 | 13.5 |
| Electronic City Ph 1 | 30.5 | 22 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |