Overview
Platinum Greenfields
Overview
Platinum Greenfields
Overview
Platinum Greenfields
Overview
Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 18 Mar 2022 · No. BBMP/Addl.Dir/JDSOUTH/0016/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 97 m² 52.7%2BHK · avg 78 m² 47.3%
Location & risks
Construction & progress
Developer
Land · ₹27.50 Cr 37.7%Development · ₹45.39 Cr 62.3%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 18 Mar 2022 | |
| Escrow bank | Bank of Baroda · JP NAGAR |
Data room
116 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 2 filed survey numbers matched, 1 could not be read. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Abhigna's Misty WoodsCompleted · OC 23-03-2023 | ABHIGNA CONSTRUCTIONS | Apartment | – | Completed |
| Adarsh CitrineCompleted (regulator flag) | M/s Adarsh Developers | Apartment | 1,292 sqft carpet (as filed) | Completed |
| Adarsh Lake Reserva Phase 1Active · 0% built | M/s Adarsh Developers | Apartment | 893–1,292 sqft carpet (as filed) | Dec 2027 |
| Adarsh StratussLapsed · completion date passed | Adarsh Developers | Apartment | 2,380–2,515 sqft | 2027 |
| Arya Hamsa GrandeCompleted (regulator flag) | ARYA GRUHA PRIVATE LIMITED | Apartment | 1,111 sqft carpet (as filed) | Completed |
| Bhoomika HeritageCompleted · OC 15-11-2023 | B M R PROJECTS | Apartment | 850–1,049 sqft carpet (as filed) | Completed |
| Bhoomika MayflowerActive · 85% built | B M R BUILDERS AND DEVELOPERS | Apartment | 813–1,006 sqft carpet (as filed) | Dec 2030 |
| Brigade Gardenia | Brigade Group | Apartment | 810–1,655 sqft | – |
8 of 45 other projects in JP Nagar, A to Z. Status is taken from each project's own filing.
All 48 projects in JP Nagar → · Sai Properties's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Platinum Greenfields in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 23 Dec 2021 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2025 |
| Land conversion | Converted 2 Apr 2014 · DEPUTY COMMISSIONER, BANGALORE DISTRICT | |
|---|---|---|
| Survey numbers | S.Y No 80/2/1400372550/DA/8/KT |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 70 | 837 |
| 3BHK | 78 | 1,046 |
| Platinum Landmark | about 0.5 km | Locked | |
|---|---|---|---|
| Sattva Forest Ridge | about 1.5 km | Locked | |
| Aqua Vista | about 2 km | Locked | |
| Iris Courtyard | about 3 km | Locked | |
| Mahindra Eden Phase-2 | about 3 km | Locked | |
| Srivara Vasudha | about 3.5 km | Locked | |
| Lodha Azur | about 4 km | Locked | |
| Azur Tower D | about 4.5 km | Locked | |
| Jhanavi Trishul Alaska | about 4.5 km | Locked | |
| Garden Square | about 5.5 km | Locked | |
| Song Of Wind | about 5.5 km | Locked | |
| Azur Phase 2 | about 5.5 km | Locked |
| Platinum Greenfields This project | This project is the point the others are measured from | 30 Jun 2025 | – | Not verified yet |
|---|---|---|---|---|
| Platinum Landmark | about 0.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Sattva Forest Ridge | about 1.5 km | 31 Dec 2029 | 75% (304 of 407) | Locked |
| Aqua Vista | about 2 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 2.5 km, BDA LAYOUT |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.11 (164 covered spaces for 148 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 14 Feb 2025 | |
|---|---|---|
| RERA completion date | 30 Jun 2025 | Red flag |
| Work began, as filed | 15 Apr 2022 |
| Building heights, fire NOC | 14.9 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 20 sq m |
|---|
| Architect's certificate, registration | Site inspected 1 May 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 15 Jun 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹72.88 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹40.09 Cr |
| Escrow bank | Bank of Baroda · JP NAGAR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Dec 2024 |
| 96% (173 of 181) |
| Locked |
| Iris Courtyard | about 3 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Mahindra Eden Phase-2 | about 3 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Srivara Vasudha | about 3.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Projects within 4 km, counted | 38 (38 with an approximate location) | |
|---|---|---|
| Flats in them | 7,544 | |
| Booked | 4,145 of 7,544 (55%) | |
| Unsold | 3,399 | |
| Booked a month, pooled | 125 flats | |
| Months to sell, pooled | 27 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3.5 km, Konankunte Cross | |
| Metro, under construction | about 3 km, Kalena Agrahara |
| Kempegowda Airport | 49.5 | 40.5 |
| MG Road (CBD) | 16.5 | 13.5 |
| Manyata Tech Park | 25 | 21.5 |
| ITPL, Whitefield | 32.5 | 23 |
| Ecospace, Bellandur ORR | 20 | 14 |
| Electronic City Ph 1 | 16.5 | 11.5 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the north-east | |
| Quarry | about 0.5 km, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Khodays Glass Factory Substation on OpenStreetMap |