Overview
Prestige Jindal City-Phase II
Overview
Prestige Jindal City-Phase II
Overview
Prestige Jindal City-Phase II
Overview
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Loan & collateral
| Escrow bank | KOTAK MAHINDRA BANK · LAVELLE ROAD |
|---|
Data room
66 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) | Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
All 80 projects in Tumkur Road → · Prestige Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Jindal City-Phase II in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | issued 14 Jul 2016 · permissible top elevation 1066 m above mean sea level · validity ended 13 Jul 2021 | |
| KSPCB | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jul 2023 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vruksha Greens, price locked.
| Vruksha Greens | 2.7 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 5 km | Locked | |
| Rubby Castle 1 | about 7 km | Locked | |
| Sri Rama Enclave | about 8.5 km | Locked | |
| Shriram Solitaire | about 9 km | Locked | |
| Birla Tisya | 9.4 km | Locked | |
| Renaissance Srichakra | about 10 km | Locked | |
| Vista Padmalaya | about 10 km | Locked | |
| Century Kindle Phase 1 | 10.4 km | Locked |
| Prestige Jindal City-Phase II This project | This project is the point the others are measured from | 31 Jul 2023 | – | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 2.7 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 | about 7 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Sri Rama Enclave | about 8.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
| Shriram Solitaire | about 9 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Birla Tisya | 9.4 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
| Rent, 2BHK, 3 km | ₹17,000 /mo · 14 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹7,500 /mo · 7 listings | |
| Rent per sq ft, 3 km | ₹20.0 /mo, as listed · 11 listings with a size |
| Projects within 4 km, counted | 7 (2 with an approximate location) | |
|---|---|---|
| Flats in them | 2,189 | |
| Booked | 1,726 of 2,189 (79%) | |
| Unsold | 463 | |
| Booked a month, pooled | 41 flats | |
| Months to sell, pooled | 11 months |
Map of the ground within about 1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest government-flagged flood location | 1.1 km, CHICKKABIDRIKAL |
| Nearest storm drain | 610 m to the south-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 740 m to the west, Madavara Kere /Anchepalya Lake |
| Completed, occupancy certificate 2 Jul 2022 |
| Schedule end | 25 Oct 2022 | |
|---|---|---|
| RERA completion date | 31 Jul 2023 | |
| Work began, as filed | 1 Sep 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | Filed with the registration |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹842.82 Cr |
|---|
Sold (1,457) 99.6%Unsold (6) 0.4%
| Flats sold, at completion | 1,457 | |
|---|---|---|
| Flats unsold, at completion | 6 | |
| Flats in the phase | 1,463 |
| Escrow bank | KOTAK MAHINDRA BANK · LAVELLE ROAD |
|---|
| K-RERA registrations under this promoter | 5 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 0 | |
| Other phases under this promoter name | 4 | |
| With a filed extension or completion | 4 (4 completed, 0 extended) | |
| Average schedule slip | 5 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 1 km of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 1.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 610 m to the south-east, tertiary drain | |
|---|---|---|
| Ground level | 870 m above sea level, plus or minus 4 m | |
| Metro, operational | 240 m, Chikkabidarakallu | |
| Metro, under construction | 11.4 km, Kodigehalli |
| Kempegowda Airport | 37.9 | 44 | 28.5 |
| MG Road (CBD) | 18.6 | 24 | 15.0 |
| Manyata Tech Park | 17.6 | 24 | 14.3 |
| ITPL, Whitefield | 33.2 | 41 | 28.0 |
| Ecospace, Bellandur ORR | 32.2 | 42 | 25.2 |
| Electronic City Ph 1 | 47.8 | 38 | 31.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.2 km to the south, named Nagasandra on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 230 m to the north-west, named Jindal City Substation on OpenStreetMap |