Overview
Prestige Misty Waters
Overview
Prestige Misty Waters
Overview
Prestige Misty Waters
Overview
Photo: Prestige Misty WatersTitle & ownership
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire NOC | GBC(1)14/2016 | Clear |
| Environmental clearance | SEIAA 160 CON 2016 · issued 25 Jan 2017 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹55.36 Cr
Loan & collateral
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road |
|---|
Data room
64 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
The entire lawn stinks and is full of mosquitoes. Also, the park had 3 snakes which was really unsafe for kids. I suggest to look any other prestige property.
The entire ground floor smells of the large sewage ponds that are there next to the property. The smells are terrible plus chances of getting bitten by those mosquitos. Hope this reputed builder is able to do something about it soon.
The view from my balcony is serene. PMW offers calming panaroma and a gentle ambience of relaxation and contemplation.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Adarsh CrestLapsed · completion date passed | Adarsh Developers | Apartment | 1,283–2,144 sqft | Dec 2025 |
| Aries LakeviewLapsed · completion date passed | NARAYAN ENTERPRISES | Apartment | – | Apr 2018 |
| Assetz Soho & SkyActive · 95% built | Assetz Property Group | Apartment | 1,658–2,799 sqft | Sep 2026 |
| Brigade TriumphCompleted · OC 17-05-2022 | Brigade Enterprises Ltd | Mixed development | – | Completed |
| Century EthosLapsed · completion date passed | Century Real Estate | Apartment | 2,850–4,940 sqft | – |
| Century Ethos (Sheltors Share)Lapsed · completion date passed | CENTURY SHELTORS DEVELOPERS PRIVATE LIMITED | Apartment | – | Jun 2022 |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Misty Waters in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Filed with the registration |
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 28 Feb 2022 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Soho & Sky, price locked; Lodha Mirabelle, price locked; Assetz Soho & Sky Phase 1b, price locked; Sumadhura Epitome, price locked; Sumadhura Solea, price locked.
| Assetz Soho & Sky | 2.3 km | Locked | |
|---|---|---|---|
| Cumins Sanctum | about 2.5 km | Locked | |
| Mirabelle Phase 2 | about 2.5 km | Locked | |
| Lodha Mirabelle | 2.6 km | Locked | |
| Magnolia Delight | about 2.5 km | Locked | |
| Assetz Soho & Sky Phase 1b | 3.1 km | Locked | |
| Sumadhura Epitome | 3.3 km | Locked | |
| Sumadhura Solea | 3.4 km | Locked | |
| Brr North Excellency Phase I | about 4 km | Locked | |
| Sri Rama Enclave | about 4.5 km | Locked | |
| Sobha City Athena | about 5 km | Locked | |
| 4square Park Sierra | 5.4 km | Locked |
| Prestige Misty Waters This project | This project is the point the others are measured from | 28 Feb 2022 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Soho & Sky | 2.3 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
| Cumins Sanctum | about 2.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
| Mirabelle Phase 2 | about 2.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
| Lodha Mirabelle | 2.6 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
| Magnolia Delight | about 2.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Assetz Soho & Sky Phase 1b | 3.1 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
| Rent, 4BHK, 3 km | ₹1,08,000 /mo · 6 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 36 listings | |
| Rent, 2BHK, 3 km | ₹25,000 /mo · 67 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 50 listings | |
| Rent per sq ft, 3 km | ₹25.4 /mo, as listed · 68 listings with a size |
| Projects within 4 km, counted | 24 (14 with an approximate location) | |
|---|---|---|
| Flats in them | 4,739 | |
| Booked | 2,822 of 4,739 (60%) | |
| Unsold | 1,917 | |
| Booked a month, pooled | 54 flats | |
| Months to sell, pooled | 36 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 83% Residential (main), 17% Valley / drain buffer | Review |
|---|---|---|
| Nearest government-flagged flood location | 370 m, Kariyannapalya Bridge over flowed ORR |
| Nearest storm drain | 70 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 100 m to the south, an unnamed water body |
| Completed, occupancy certificate 16 Jun 2021 |
| Schedule end | 30 May 2021 | |
|---|---|---|
| RERA completion date | 28 Feb 2022 | |
| Work began, as filed | 16 Jul 2018 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Fire safety | GBC(1)14/2016 | |
|---|---|---|
| Environmental clearance | SEIAA 160 CON 2016 · issued 25 Jan 2017 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹112.21 Cr |
|---|
Sold (119) 100%
| Flats sold, at completion | 119 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 119 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road |
|---|
| K-RERA registrations under this promoter | 66 | |
|---|---|---|
| Marked completed | 37 | |
| Past promised date, not completed | 10 | |
| Other phases under this promoter name | 4 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 4 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Century XenonLapsed · completion date passed |
| Century Real Estate Holdings Private Limited |
| Apartment |
| 2,368–5,291 sqft carpet (as filed) |
| Dec 2024 |
| Chowriappa ConstellationLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
8 of 55 other projects in Hebbal, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Self development | |
| Nearest city water main | 740 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 70 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 893 m above sea level, plus or minus 4 m | |
| Metro, operational | 6.2 km, Yeshwantpur | |
| Metro, under construction | 380 m, Kempapura |
| Kempegowda Airport | 28.2 | 29 | 20.4 |
| MG Road (CBD) | 10.9 | 15 | 7.9 |
| Manyata Tech Park | 3.1 | 5 | 2.0 |
| ITPL, Whitefield | 20.0 | 25 | 16.1 |
| Ecospace, Bellandur ORR | 24.9 | 34 | 15.9 |
| Electronic City Ph 1 | 31.6 | 40 | 24.5 |
| Landfill or waste transfer station | 2.9 km to the north | |
|---|---|---|
| Sewage treatment plant | 360 m to the south, named Hebbal 60MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.5 km to the north-east, named Manyata Substation on OpenStreetMap |