Overview
Prestige Suncrest
Overview
Prestige Suncrest
Overview
Prestige Suncrest
Overview

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 31 Dec 2024 | |
| Building plan (BDA) | Sanctioned 15 Jan 2025 | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road, Bangalore |
Data room
156 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
All 279 projects in Electronic City → · Prestige Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Prestige Suncrest in the interactive atlas
Transfer of the land
Sale deed
in favour of M/s.Trishul Buildtech & Infrastructures Pvt Ltd., · Survey 30/24B, 30/24C
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/s.Trishul Buildtech & Infrastructures Pvt Ltd., · Survey 30/24B, 30/24C
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 30/24B, 30/24C
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 30/24B, 30/24C
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/s.Trishul Buildtech & Infrastructures Pvt Ltd., · Survey 30/25, 30/25B
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/s.Trishul Buildtech & Infrastructures Pvt Ltd., · Survey 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner · Survey 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Nagarasabhe, Hebbagodi · Survey 30/24B, 30/24C, 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Nagarasabhe, Hebbagodi · Survey 30/24B, 30/24C, 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Nagarasabhe, Hebbagodi · Survey 30/24B, 30/24C, 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Nagarasabhe, Hebbagodi · Survey 30/24B, 30/24C, 30/25, 30/25B
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/No./AS/AA-3/TS-2/D/18/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/170225/007512
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 31 Dec 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: EC Sy No.30/25 (old) New Sy No.30/25A1.
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 30/24B, 30/24C, 30/25, 30/25B | |
|---|---|---|
| Owner kind, Sy 30/24B | Company | |
| Share as printed, Sy 30/24B | 30 | |
| Owner as printed, Sy 30/24B | ||
| Owner kind, Sy 30/24C | Company | |
| Share as printed, Sy 30/24C | 30 | |
| Owner as printed, Sy 30/24C | ||
| Owner kind, Sy 30/25 | Company | |
| Share as printed, Sy 30/25 | 30 | |
| Owner as printed, Sy 30/25 | ||
| Owner kind, Sy 30/25B |
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 15 Jan 2025 · No. BDA/No./AS/AA-3/TS-2/D/18/2024-25 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/319/2024 · issued 24 Oct 2024 · building height 87.05 m (Tower-01), 84 m (Tower - 02) | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-347615 · issued 13 Feb 2025 · valid until 12 Feb 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2028 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 30/24B, 30/24C | Converted 17 Apr 2023 · Deputy Commissioner | |
| Sy 30/25, 30/25B | Converted 16 Sep 2023 · Deputy Commissioner | |
| Survey numbers | 30/24B · 30/24C · 30/25 · 30/25B |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3 Bed · avg 92 m² 66.8%2 Bed · avg 66 m² 22%1 Bed · avg 40 m² 11.2%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1 Bed | 49 | 432 |
| 2 Bed | 96 | 712 |
| 3 Bed | 292 | 988 |
| Sold, Q2 2026-27 | 437 / 437 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
Map of 5 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Ramky One Karnival, price locked; K&T's Sai Sannidhi, price locked; Assetz Canvas & Cove 2.0 - Block A, price locked; Mahindra NewHaven, price locked; Mahindra Zen, price locked.
| Ramky One Karnival | 2.2 km | Locked | |
|---|---|---|---|
| K&T's Sai Sannidhi | 3.0 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | 3.3 km | Locked | |
| Mahindra NewHaven | 3.4 km | Locked |
| Prestige Suncrest This project | This project is the point the others are measured from | 30 Sep 2028 | 100% (437 of 437) | Not verified yet |
|---|---|---|---|---|
| Ramky One Karnival | 2.2 km | 30 Dec 2026 | 77% (389 of 503) | Locked |
| K&T's Sai Sannidhi | 3.0 km | 31 Dec 2025 | 68% (27 of 40) | Locked |
| Assetz Canvas & Cove 2.0 - Block A |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 3.2 km, SUBASH NAGARA |
| Nearest storm drain | 650 m to the south-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 430 m to the east, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.33 (580 covered spaces for 437 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it

| Main structure | 14% · planned by 31 Mar 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Aug 2028 | |
| Club house | Not started | |
| Completion | 21% | |
| Completion, accountant | 36.9% of the estimated cost spent |
| Schedule end | 30 Sep 2028 | |
|---|---|---|
| RERA completion date | 30 Sep 2028 | |
| Work began, as filed | 1 Apr 2025 |
| Building heights, fire NOC | 87.05 m (Tower-01), 84 m (Tower - 02) on the fire NOC · filed: Tower-01 87.05 m, Tower - 02 84 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 100 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/319/2024 · issued 24 Oct 2024 · building height 87.05 m (Tower-01), 84 m (Tower - 02) | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant's certificate, registration | Dated 26 Jan 2025 | |
| Chartered accountant, Form 4 | Dated 9 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹218.08 Cr 39%Development · ₹340.49 Cr 61%
| Estimated cost, at registration | ₹558.57 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q2 2026-27 | ₹538.95 Cr | |
| Cost incurred | ₹198.91 Cr (36.9% of the Form 4 Q2 2026-27 estimate) |
Sold (437) 100%
| Sold, Q3 2025-26 | 437 / 437 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 437 / 437 · 0 available | |
| Sold, Q1 2026-27 | 437 / 437 · 0 available | |
| Sold, Q2 2026-27 | 437 / 437 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q2 2026-27 | 437 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹20.10 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹20.56 Cr in Q2 2026-27 | |
| Amount deposited in the quarter, Form 4 | ₹19,38,45,520 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q2 2026-27 | ₹27,69,22,172 |
| K-RERA registrations under this promoter | 66 | |
|---|---|---|
| Marked completed | 37 | |
| Past promised date, not completed | 10 | |
| Other phases under this promoter name | 33 | |
| With a filed extension or completion | 20 (18 completed, 2 extended) | |
| Average schedule slip | 2 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
| Share as printed, Sy 30/25B | 30 |
|---|
| Owner as printed, Sy 30/25B |
|---|
| Land area of this registration | 23,738 sq m |
|---|
| Khata | E Khatha · Nagarasabhe, Hebbagodi · 5 Jan 2024 |
|---|
| Sale deed | Dated 4 Nov 2010, 28 Jun 2023 |
|---|
| Sale deed in favour of | M/s.Trishul Buildtech & Infrastructures Pvt Ltd., |
|---|
| Title deed | Consideration ₹7.97 Cr |
|---|
| Mahindra Zen | 3.4 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 3.5 km | Locked |
|---|
| Azur Phase 2 | about 4 km | Locked |
|---|
| Vasuki Vallabha | 4.7 km | Locked |
|---|
| Dhiraan Lotus | about 5 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | 5.2 km | Locked |
|---|
| Azur Tower D | 5.2 km | Locked |
|---|
| Abhee Riviera Royale | about 5.5 km | Locked |
|---|
| 3.3 km |
| 30 Apr 2029 |
| 98% (238 of 244) |
| Locked |
| Mahindra NewHaven | 3.4 km | 28 Dec 2029 | 89% (106 of 119) | Locked |
|---|
| Mahindra Zen | 3.4 km | 31 Dec 2028 | 100% (227 of 228) | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 3.5 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹42,500 /mo · 32 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹29,000 /mo · 57 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 33 listings | |
| Rent per sq ft, 3 km | ₹27.5 /mo, as listed · 60 listings with a size |
| Projects within 4 km, counted | 35 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 9,993 | |
| Booked | 4,053 of 9,993 (41%) | |
| Unsold | 5,940 | |
| Booked a month, pooled | 115 flats | |
| Months to sell, pooled | 44 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Other | |
| Nearest city water main | 150 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 650 m to the south-west, tertiary drain | |
|---|---|---|
| Ground level | 937 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.7 km, Electronic City | |
| Metro, under construction | 6.4 km, Kalena Agrahara |
| Kempegowda Airport | 51.5 | 58 | 40.3 |
| MG Road (CBD) | 17.2 | 26 | 15.6 |
| Manyata Tech Park | 27.8 | 36 | 22.8 |
| ITPL, Whitefield | 28.5 | 37 | 18.9 |
| Ecospace, Bellandur ORR | 16.0 | 24 | 10.1 |
| Electronic City Ph 1 | 4.4 | 9 | 3.5 |
| Landfill or waste transfer station | 1.3 km to the north | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 1.6 km to the west | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 790 m to the south |