Best Apartment in Kadugodi. Walkable from Kadugodi bus stand and Whitefield railway station. Well equipped GYM, Swimming Pool, Party Hall, Badminton Court, Basket ball area is ready with good condition. Children Play area, 24 hrs power back…
Hhari shankar19 Dec 2018★★★★★
Good apartment for affordable cost in the locality. Lot of open area and good ventilation. Nearest to Whitefield railway station and Kadugodi bus station. Metro station under construction and coming nearly. Surrounded by schools such as…
SSubashchandra Dash7 Dec 2018★★★★★
It is a newly constructed apartment building .About 65 families are residing at present.supporting Infrastructure s are available. Safety and security are also good.
No survey sketch is listed on this phase's K-RERA filing
Land record
Survey plots · KGIS cadastral
Approvals
Is it approved for its use?
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
7 Jun 2018
Registration certificates
PRM/KA/RERA/1251/446/PR/180208/001560
Not verified yet: Building plan, Land conversion, Validity, Approval letters, Conversion order.
Disputes & cases
Are there court cases or buyer complaints on this project?
Clear1 clear
Builder: PROPULSIVE PROPERTIES
Court cases on the project's land
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
Search pending.
Court cases against the builder and landowners
0 cases
Filed on
Case no.
Filed at
Location
Filed by
Against
What it's about
Status
None found.
Buyer complaints filed with K-RERA on this project
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
Buyer complaints on other projects by this builder
0 cases
Filed on
Case no.
Filed at
Location
Filed by
What it's about
Status
None found.
✓Confirmed: the record names this project, its land or its promoter company?Likely: matched by the builder's nameHigh: a court stay or a pending case on the filed landMedium: open, or the record does not sayLow: decided or closed
Contract & costs
What does a buyer commit to?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Forfeiture, agreement10% of the sale considerationAgreement for sale, p. 4
Cancellation
Forfeiture
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Completed: no quarterly return is on this phase's K-RERA filing
The area
Comparable projects
Nearest 12 with filed prices
Location & risks
What is the location like?
Groundwater, taluk average27.3 m below groundBengaluru East taluk, July 2023
Water supply, as filedSelf developmentDeclared by the promoter
The site
Flooding
Site vs nearest drain
Construction & progress
How is it being built, and when will it be ready?
CompletionCompletedOccupancy certificate filed with K-RERA
Possession, agreement30 Mar 2018Agreement for sale, p. 5
Progress
Completion, architect
Completed: no quarterly return is on this phase's K-RERA filing
Work left
By component
Completed: no quarterly return is on this phase's K-RERA filing
Quarterly return
Developer
Can the developer deliver?
SoldNo return filed
Sold in the latest quarterNo return filed
Funding
Form 4
Estimated cost, at registration
₹20.47 Cr
Sales
Sold vs unsold
Completed: no quarterly return is on this phase's K-RERA filing
Sold per quarter
Completed: no quarterly return is on this phase's K-RERA filing
K-RERA inventory
Loan & collateral
Can it be financed?
Conditions
Collateral checks
Escrow bank
HDFC · Banasaswdi Branch
Stage
Certified progress
Completed: no quarterly return is on this phase's K-RERA filing
Not verified yet: Value; Max loan; Borrower margin; Developer's project loan; Example unit; Calculation; Records searched to; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
Data room
Documents filed for this project
Documents filed38On K-RERA
Available38100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
1 pageAvailable
1 pageAvailable
4 pagesAvailable
4 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 3 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Propulsive Pinnacle is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; How the land reached this project; Title report; Charges; Schedule in the EC vs KGIS neighbours; Sketch, sanction and mutation vs KGIS map; Area on the KGIS map; The RTC of each filed survey; Share of sales revenue; Joint development agreement.
Agreement and allotment letter
Forfeiture, agreement
10% of the sale consideration
Not verified yet: Forfeiture, allotment letter; Transfer fee; Maintenance included; Payment plan; Agreement for sale.
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Unit mix filed; Unit types; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Filed prices nearby; Median rent, 3 km; Rents and yields; Months to sell unsold stock; K-RERA inventory.
Nearest storm drain
about 0.5 km from the locality centre, tertiary drain
Nearest lake, tank or pond
about 0.5 km from the locality centre, an unnamed water body
Around it
Water
Groundwater, Bengaluru East taluk average
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Water at a glance
Groundwater
Bengaluru East taluk average, July 2023: 27.3 m below ground
What it means
20-40 m below ground, a class in CGWB's depth-to-water-level classes
Through the year
Not found
Water supply, as filed
Self development
Distances
Approximate: locality level
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
about 2.5 km from the locality centre
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 1.5 km from the locality centre
Not verified yet: Metro, operational; Power lines, flood-prone areas, drains; Planning and hazards; Drains and lakes; Specification and Form 5; Nearest city water main; Ground level; Metro, under construction; Road distance from the site; Six city anchors · OSRM, no traffic.
Completion
Completed, occupancy certificate filed with K-RERA
Dates
Dates
Filed dates
Possession, agreement
30 Mar 2018
RERA completion date
7 Jun 2018
Completion date, agreement
30 Mar 2018
Grace period for possession
3 months
Work began, as filed
13 Jun 2016
Specified structure
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Not verified yet: Structure; Structural safety certificate; Main structure; Electrical and plumbing finishing; Internal roads; Club house; Completion, accountant; Schedule end; What the promoter specified · not an inspection; Specification sheet · brands "or equivalent"; Engineer, architect and fire certificates.
Completed: no quarterly return is on this phase's K-RERA filing
Compliance
Escrow
Completed: no quarterly return is on this phase's K-RERA filing
Escrow and filings
Escrow bank
HDFC · Banasaswdi Branch
Not verified yet: Receivable, sold flats; Cost left; Estimated cost; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Designated account, collected; Designated account, withdrawn; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Basemap: Esri, OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.